粤电力B:2026年半年度报告(英文版)

GUANGDONG ELECTRIC POWER DEVELOPMENT CO., LTD.

The Semi-annual Report 2026

图1

August 2026

I. Important Notice, Table of Contents and Definitions

The Board of Directors ,Directors and Senior Executives of the Company hereby guarantees that there are no misstatement, misleading representation or important omissions in this report and shall assume joint and severa liability for the authenticity, accuracy and completeness of the contents hereof.

Mr.Zheng Yunpeng, The Company leader, Mr. Liu Wei, Chief financial officer and the Mr.Meng Fei, the person in charge of the accounting department (the person in charge of the accounting )hereby confirm the authenticity and completeness of the financial report enclosed in this semi-annual report.

Directors other than the following ones have attended the Board meeting to review the Summary- annual report.

Name of absent directorPosition of absent directorReasonName of proxy
Li, BaobingDirectorDue to circumstancesZheng, Yunpeng
He, RuxinDirectorDue to circumstancesZheng, Yunpeng

The main business of the company is the investment, construction and operation management of power projects and new energy projects. For the risks and countermeasures that the company may face in its future development, Refer to Section 10 of Chapter III of this annual report-situation faced and countermeasures for relevant information.

The Company Will not distribute cash dividend or bonus shares, neither capitalizing of common reserves.

Table of Contents

I.Important Notice, Table of contents and Definitions

II. Company Profile & Financial Highlights.

III. Management Discussion & Analysis

IV. Corporate Governance, Environmental and Social Responsibility

V. Important Events

VI. Change of share capital and shareholding of Principal Shareholders

VII. Corporate Bond

VIII. Financial Report

Documents available for inspection

1.Financial statements bearing the seal and signature of legal representative, financial controller and the person in charge of the accounting organ;

2.All original copies of official documents and notices, which were disclosed in China Securities Journal, Securities Times, Shanghai Securities News, Securities Daily and Hong Kong Commercial Daily (Both English and Chinese version);

3.Chinese version of the semi-annual report.

The documents mentioned above are kept in office, and are ready for reference at any time (except public holidays, Saturday and Sunday).

Definition

Terms to be definedRefers toDefinition
Zhuhai Yuefeng ZhukeRefers toZhuhai Yuefeng Zhuke New Energy Co., Ltd.
Dongguan NingzhouRefers toDongguan Ningzhou Energy Investment Partnership (LP)
BeibuwanOffshore Wind PowerRefers toGuangdong Beibuwan Offshore Wind Power Development Co., Ltd.
Yudean TestingRefers toGuangdong Yudean Testing Co., Ltd.
Yudean LinghangRefers toGuangdong Yudean Linghang Electric Power Co., Ltd.
Turpan New EnergyRefers toYudean Turpan New Energy Power Generation Co., Ltd.
Inner Mongolia Power Grid CompanyRefers toInner Mongolia Electric Power (Group) Co., Ltd.
Huaihua Ruisi New EnergyRefers toHuaihua Ruisi New Energy Partnership (LP)
Zhanglang New EnergyRefers toGansu Zhuanglang New Energy Co., Ltd.
Qiyang New EnergyRefers toQiyang Yudean New Energy Co.,Ltd.
Jinhui New EnergyRefers toZhuhai Jinhuiwan Yuefeng New Energy Co., Ltd.
Maoming Thermal Power PlantRefers toGuangdong Energy Maoming Thermal Power Plant Co., Ltd.
Jinghai Power GenerationRefers toGuangdong Yudean Jinghai Power Generation Co.,Ltd.
Zhanjiang Wind PowerRefers toGuangdong Yudean Zhanjiang WindPower Generation Co., Ltd.
Technology Engineering CompanyRefers toGuangdong Yudean Technology Engineering Management Co., Ltd.
Humen Power GenerationRefers toGuangdong Yudean Humen Power Generation Co., Ltd.
Bohe EnergyRefers toGuangdong YudeanBohe Energy Co.,Ltd.
Xuwen Wind PowerRefers toGuangdong Yudean Xuwen Wind Power Generation Co., Ltd.
Huadu Natural GasRefers toGuangdong Yudean Huadu Natural Gas Thermal Power Co., Ltd.
Dapu Power GenerationRefers toGuangdong YudeanDapu Power Generation Co., Ltd.
Leizhou Wind PowerRefers toGuangdong YudeanLeizhou Wind Power Generation Co., Ltd.
Dianbai Wind PowerRefers toGuangdong Yudean Dianbai Wind Power Co., Ltd.
Zhanjiang Electric PowerRefers toZhanjiang Electric Power Co., Ltd.
Yuejia Electric PowerRefers toGuangdong Yuejia Electric Power Co., Ltd.
Shaoguan Power Generation PlantRefers toGuangdong Yudean Shaoguan Power Generation Co., Ltd.
Zhongyue EnergyRefers toZhanjiang Zhongyue Energy Co., Ltd.
Electric Power Sales CompanyRefers toGuangdong Yudean Electric Power Sales Co., Ltd.
Qujie Wind PowerRefers toGuangdong Yudean Qujie Wind Power Generation Co., Ltd.
Yangjiang Wind PowerRefers toGuangdong Yudean Yangjiang Offshore Wind Power Co., Ltd.
Lincang EnergyRefers toLincang Yudean Energy Co., Ltd.
Guangqian Electric PowerRefers toShenzhen Guangqian Electric Power Co., Ltd.
Huizhou Natural GasRefers toGuangdong Huizhou Natural Gas Power Co., Ltd.
Pinghai Power PlantRefers toGuangdong Huizhou Pinghai Power Co., Ltd.
Shibeishan Wind PowerRefers toGuangdong Yudean Shibeishan Wind PowerDevelopment Co., Ltd.
Red Bay Power GenerationRefers toGuangdong Red Bay Power Generation Co., Ltd.
Wind Power CompanyRefers toGuangdong Wind Power Generation Co., Ltd.
Tongdao Wind Power CompanyRefers toTongdaoYuexin Wind Power Generation Co., Ltd.
YudeanPingyuanRefers toGuangdong YudeanPingyuan Wind Power Co., Ltd.
Heping Wind PowerRefers toGuangdong Yudean Heping Wind Power Co., Ltd.
Huilai Wind PowerRefers toHuilai Wind Power Generation Co.,Ltd.
Hongrui TechnologyRefers toGuangdong Yuejiang Hongrui Electric Technology Development Co., Ltd.
Yongan Natural GasRefers toGuangdong YudeanYongan Natural Gas Thermal Power Co., Ltd.
Xupu YuefengRefers toHunan Xupu Yuefeng New Energy Co., Ltd.
Wuxuan YuefengRefers toGuangxi Wuxuan Yuefeng New Energy Co., Ltd.
Pingdian IntegratedRefers toHuizhou Pingdian Integrated Energy Co., Ltd.
Zhuhai Wind PowerRefers toGuangdong Yudean Zhuhai Offshore Wind Power Co., Ltd.
Binhaiwan CompanyRefers toGuangdong Yudean Binhaiwan Energy Co., Ltd.
Dayawan CompanyRefers toGuangdong Yudean Dayawan Integrated Energy Co., Ltd.
Qiming CompanyRefers toGuangdong Yudean Qiming Energy Co., Ltd.
Huaguoquan CompanyRefers toShenzhen Huaguoquan Electric Industry Service Co., Ltd.
Nanxiong New EnergyRefers toShaoguanNanxiong Yuefeng New Energy Co., Ltd.
Dananhai CompanyRefers toGuangdong Yudean Dananhai Intelligence Energy Co., Ltd.
Qingzhou offshore wind powerRefers toGuangdong Energy Qingzhou offshore wind power Co., Ltd.
Wanhaowei New EnergyRefers toZhanjiang Wanhaowei New Energy Co.,Ltd.
Wanchuang Hengwei New EnergyRefers toZhanjiang Wanchuang Hengwei New Energy Co., Ltd.
Nanhua New EnergyRefers toGuangdong GuangyeNanhua New Energy Co., Ltd.
Datang New EnergyRefers toGuangdong Yueneng Datang New Energy Co., Ltd.
Yueneng Wind PowerRefers toGuangdong Yueneng Wind Power Co., Ltd.
Tumu Thermal PowerRefers toTumushukeThermal Power Co.,Ltd.
Sha C CompanyRefers toGuangdong Shajiao( plant C) Power Generation Co., Ltd.
Guanghe Electric PowerRefers toGuangdong Guanghe Electric Power Co., Ltd.
Biomass Power GenerationRefers toGuangdong Biomass Power Generation Co., Ltd
Xinhui Power GenerationRefers toGuangdong YudeanXinhui Power Generation Co.,Ltd.
Yunhe Power GenerationRefers toGuangdong YudeanYunhe Power Generation Co., Ltd.
Yundian EnergyRefers toYunfuYundian Energy Co., Ltd.
Yuehua Power GenerationRefers toGuangdong Yuehua Power Generation Co., Ltd.
Yuehua Comprehensive energyRefers toGuangdong Yudean Yuehua Comprehensive energy Co., Ltd.
Huangpu Power EngineeringRefers toGuangzhou Huangpu Power Engineering Co., Ltd.
Bijie New EnergyRefers toGuangdong Yudean Bijie New Energy Co., Ltd.
Shangyang EnergyRefers toZhanjiang Shangyang Energy Technology Co., Ltd.
Guidian EnergyRefers toZhanjiang Potou Guidian Energy Technology Co.,Ltd.
Shunfeng New EnergyRefers toXihua Shunfeng New Energy Co., Ltd.
Jindian New EnergyRefers toWuzhi Jindian New Energy Technology Co., Ltd.
Lianjiang New EnergyRefers toLianjiang Yuefeng New Energy Co., Ltd.
Luoding YuefengRefers toYunfu Luoding Yuefeng New Energy Co., Ltd.
Zhaocheng YuefengRefers toLinfen Zhaocheng Yuefeng New Energy Co., Ltd.
Wuhua New EnergyRefers toMeizhou Wuhua Yuefeng New Energy Co., Ltd.
Yingyang New EnergyRefers toLaishui Yangyang New Energy Technology Co., Ltd.
Lineng New Energy Co., Ltd.Refers toLaishuiLineng New Energy Technology Co., Ltd.
Longmen New EnergyRefers toHuizhou Longmeng Yuefeng New Energy Co.,Ltd.
Inner Mongolia New EnergyRefers toInner Mongolia Yuefeng New Energy Co., Ltd.
Zhuhai New EnergyRefers toZhuhai Yuefeng New Energy Co., Ltd.
Dunan New EnergyRefers toDachengDunan New Energy Co., Ltd.
Gaotang New EnergyRefers toGaotangShihui New Energy Co., Ltd.
Shaoguan New EnergyRefers toGuangdong ShaoguanYuedianli New Energy Co., Ltd.
Hanhai New EnergyRefers toTumushuke Yudean Hanhai New Energy Co., Ltd.
Jinxiu EnergyRefers toYudean Jinxiu Energy Co., Ltd.
Senhong EnergyRefers toNanjing Senhong New Energy Co., Ltd.
Muhong New EnergyRefers toJinchang Muhong New Energy Co., Ltd.
Senhai New EnergyRefers toNanjing Senhai New Energy Co., Ltd.
Mujing New EnergyRefers toJinchangJieyuan Mujing New Energy Co., Ltd.
Huibo New EnergyRefers toGuangdong Yudean Huibo New Energy Co., Ltd.
Dongrun ZhongnengRefers toTaishan Dongrun Zhongneng New Energy Co., Ltd.
Dongrun Qingneng New EnergyRefers toTaishan Dongrun Qingneng New Energy Co., Ltd.
Runze ieyuan New EnergyRefers toTaishan RunzeJieyuan New Energy Co., Ltd.
Maoming Natural GasRefers toGuangdong Yudean Maoming Natural gas Thermal Power Co., Ltd
Xingyue New EnergyRefers toMeizhou Xingyue New Energy Co., Ltd.
Huixin Thermal PowerRefers toGuangdong Yudean Huixin Thermal Power Co., Ltd.
Shache EnergyRefers toYudean Shache Comprehensive Energy Co., Ltd.
Xinguangyao New EnergyRefers toLaixi Xinguangyao New Energy Technology Co., Ltd.
Telian New EnergyRefers toLaixiTelian New Energy Technology Co., Ltd.
Lianyao New EnergyRefers toPingduLianyao New Energy Technology Co.,Ltd.
Jiu Zhou New EnergyRefers toJiuzhou New Energy (Zhaoqing) Co., Ltd.
Changshan Wind PowerRefers toXiangtangXiangdianChangshan Wind Power Generation Co., Ltd.
Luoding New EnergyRefers toYunfuLuodingYudean New Energy Co., Ltd.
Zhuhai Yudean New EnergyRefers toZhuhai Yudean New Energy Co., Ltd.
Tumushuke ChangheRefers toTumushuke Yudean Changhe New Energy Co., Ltd.
Zhenneng New EnergyRefers toYunfuYudean New Energy Co., Ltd.
Zhonggong EnergyRefers toZhonggongt Energy Technology (Maoming) Co., Ltd.
Yahua New EnergyRefers toYahua New Energy Technology (Gaozhou) Co., Ltd.
Xinniang CompanyRefers toGuangdong Energy Group Xinjiang Company
Xinjiang comprehensive energyRefers toYudean Xinjiang comprehensive energy Co., Ltd.
Gaozhou New EnergyRefers toGaozhouYudean Intelligence New Energy Co., Ltd.
Xintian YuefengRefers toXintian Yuefeng New Energy Co., Ltd.
Lanshan YuefengRefers toLanshan Yuefeng New Energy Co., LTD.
Lianjiang HangnengRefers toLianjiang Hangneng New Energy Co., Ltd.
Herun New EnergyRefers toWoyang Herun New Energy Technology Co., Ltd..
Guangxi HangnengRefers toGuangxi Hangneng New Energy Co., Ltd.
Jincheng YuefengRefers toJincheng Yuefeng New Energy Co., Ltd.
Baiyin YuefengRefers toBaiyin Yuefeng New Energy Co., Ltd.
Yunan Yuexin CompanyRefers toYunfu Yunan Yuexin Power Generation Co., Ltd.
Yuncheng Wanquan YuefengRefers toYuncheng Wanquan Yuefeng New Energy Co., Ltd.
Tokexun EnergyRefers toGuangneng Tuokexun New Energy Power Generation Co., Ltd.
Yehai YuefengRefers toLingao Yehai Yuefeng New Energy Co., Ltd.
Zhuhai Yuefeng HuafaRefers toZhuhai Yuefeng Huafa New Energy Co., Ltd.
Zhanjiang Yuefeng BaoxinRefers toZhanjiang Yuefeng Baoxin Energy Co., Ltd.
Zhuhai Yuefeng SeasRefers toZhuhai Yuefeng Seas Meadow Co., Ltd.
Shantou Yuefeng New EnergyRefers toShantou Yuefeng New Energy Investment Partnership (LP)
Ruisi New EnergyRefers toGuangzhou Yuefeng Ruisi New Energy Co., Ltd.
Xiangzhou YunjiangRefers toXiangzhou Yunjiang New Energy Co., Ltd.
XiangzhouHangjingRefers toXiangzhou Hangjing New Energy Co., Ltd.
Qinglong Manchu photovoltaicRefers toQinglong Manchu Autonomous County Jianhao Photovoltaic Technology Co., Ltd.
Karamay integrated energyRefers toGuangneng Karamay integrated energy Co., Ltd.
Hainan LongyueRefers toHainan Longyue New Energy Co., Ltd.
Zhongshan Energy ServiceRefers toGuangdong Energy Zhongshan Energy Service Co.,Ltd.
Yudean New Energy DevelopmentRefers toGuangdong Yudean New Energy Development Co., Ltd.
Changle YuefengRefers toYuncheng Changle Yuefeng New Energy Co., Ltd.
Industry FuelRefers toGuangdong Electric Industry Fuel Co., Ltd.
Taishan CompanyRefers toGuoneng Yudean Taishan Power Generation Co., Ltd.
Guangdong Energy Finance CompanyRefers toGuangdong Energy Group Finance Co., Ltd.
Yudean Shipping CompanyRefers toGuangdong Yudean Shipping Co., Ltd.
Shanxi Energy CompanyRefers toShanxi Yudean Energy Co., Ltd.
Guangdong Energy Insurance Captive CompanyRefers toGuangdong Energy Property Insurance Captive Co., Ltd.
Weixin Energy Co., Ltd.Refers toYunnan Yuntou Weixin Energy Co., Ltd.
Energy Financial Leasing CompanyRefers toGuangdong Energy Financial Leasing Co., Ltd.
Yueqian Electric PowerRefers toGuizhou Yueqian Electric Power Co., Ltd.
Yueqian Electric PowerRefers toGuizhou Yueqian Electric Power Co., Ltd.
Jiangkeng Hydropower stationRefers toYangshan Jiangkeng Hydropower station
Zhonghang ShenxinRefers toZhonghang Shenxin Wind Power Co., Ltd.
Yuexin EnergyRefers toZhanjiang Yuexin Energy Technology Co., Ltd.
Southern Offshore wind powerRefers toSouthern Offshore wind power Union Development Co., Ltd.
Sunshine InsuranceRefers toSunshine Insurance Group Co., Ltd.
Shenzhen CapitalRefers toShenzhen Capital Group Co., Ltd.
GMGITCRefers toGMG International Tendering Co., Ltd.
Shenzhen EnergyRefers toShenzhen Energy Group Co., Ltd.
Shenergy CompanyRefers toShenergy Company Limited
Environmental Protection CompanyRefers toGuangdong Yudean Environmental Protection Co., Ltd.
Yunfu B Power PlantRefers toYunfu Power Plant (B Plant) Co., Ltd.
Shantou Huaneng Wind PowerRefers toHuaneng Shantou Wind Power Co., Ltd.
Guangdong Energy GroupRefers toGuangdong Energy Group Co., Ltd.
Guangzhu Power GenerationRefers toZhuhai Special Economic Zone Guangzhu Power Generation Co., Ltd.
Yudean Environmental Protection MaterialsRefers toGuangdong Yudean Environmental Protection Materials Co., Ltd
Tianxin InsuranceRefers toShenzhen Tianxin Insurance Brokers Co., Ltd.
JieyangYudean ShippingRefers toJieyang Yudean Shipping Service Co., Ltd.
Shanwei Yudean ShippingRefers toShanwei Yudean Shipping Service Co., Ltd.
Gaolan Port Environmental ProtectionRefers toGuangdong Zhuhai Gaolan Port Environmental Protection Technology Co., Ltd.
Menghua New EnergyRefers toInner Mongolia Yudean Menghua New Energy Co., Ltd.
Baiyun EboRefers toBaiyuan Ebo Yuemeng New Energy Co., Ltd.
ShaoguanQujiangRefers toShaoguan QujiangYudean New Energy Co., Ltd.
Zhuhai JinwanRefers toGuangdong Zhuhai Jinwan Power Generation Co., Ltd.
Yudean Zhongshan Thermal Power PlantRefers toGuangdong Yudean Zhongshan Thermal Power Plant Co., Ltd.
Yudean Real Estate InvestmentRefers toGuangdong Yudean Real Estate Investment Co., Ltd.
Yudean ShippingRefers toGuangdong Yudean Shipping Co., Ltd.
Yudean Information TechnologyRefers toGuangdong Yudean Information Technology Co., Ltd.
YudeanXinfengjiangRefers toGuangdong Yudean Xinfengjiang Power Generation Co., Ltd.
Yudean Property ManagementRefers toGuangdong Yudean Property Management Co., Ltd.
Yudean Environmental ProtectionRefers toGuangdong Yudean Environmental Protection Co., Ltd.
Yudean ShippingRefers toGuangdong Yudean Shipping Co., Ltd.
Yangjiang Port AffairsRefers toGuangdong Yangjiang Port Affairs Co., Ltd.
Yuelong Power GenerationRefers toGuangdong Yuelong Power Generation Co., Ltd.
Energy Group Zhuhai Power PlantRefers toGuangdong Energy Group Zhuhai Power Generation Plant
ShaJiao C Power Plant of Energy GroupRefers toShaJiao C Power Plant of Guangdong Energy Group Co., Ltd.
Shaoguan PortRefers toGuangdong Shaoguan Port Co., Ltd.
Natural Gas of Energy GroupRefers toGuangdong Energy Group Natural Gas Co., Ltd
Scientific Research Institute of Energy GroupRefers toGuangdong Energy Group Scientific Research Institute Co., Ltd.
Huizhou Natural Gas of Energy GroupRefers toGuangdong Energy Group Huizhou Natural Gas Development Co., Ltd.
(Yunfu) Energy Storage of Energy GroupRefers toGuangdong Energy Group (Yunfu) Energy Storage Power Generation Co., Ltd.
Huizhou Liquefied Natural GasRefers toGuangdong Huizhou Liquefied Natural Gas Co., Ltd.
Dongguan Mingyuan HotelRefers toDongguan Mingyuan Hotel Co., Ltd
Guangdong Energy Enterprise ServiceRefers toGuangdong Energy Group Enterprise Service Co., Ltd.

II. Company Profile & Financial Highlights.

I. Company Profile

Stock abbreviationYue Dian Li A, Yue Dian Li BStock code:000539.SZ,200539.SZ
Stock exchange for listingShenzhen Stock Exchange
Name in Chinese广东电力发展股份有限公司
Abbreviation of Registered Company Name in Chinese(粤电力
English name (If any)GUANGDONG ELECTRIC POWER DEVELOPMENT CO.,LTD
English abbreviation (If any)GED
Legal RepresentativeZheng Yunpeng

Ⅱ. Contact person and contact manner

Board secretarySecurities affairs Representative
NameQin XiaoHang Xiaowen
Contact address35F, South Tower, Yudean Plaza, No.2 Tianhe Road East, Guangzhou,Guangdong Province35F, South Tower, Yudean Plaza, No.2 Tianhe Road East, Guangzhou,Guangdong Province
Tel(020)87570251(020)87570251
Fax(020)85138084(020)85138084
E-mailqinxiao@ged.com.cnhuangxiaowen@ged.com.cn

III. Other info.

1. Way of contact

Whether registrations address, offices address and codes as well as website and email of the Company changed in reporting period or not

□ Applicable √ Not applicable

Registrations address, offices address and codes as well as website and email of the Company has no change in reporting period, found more details in Annual report 2025.

2. Information inquiry

Whether information disclosure and preparation place changed in reporting period or not

□ Applicable √ Not applicable

None of the official presses, website, and place of enquiry has been changed in the semi report period. found more details in Annual report 2025.

3. Other relevant information

Did any change occur to other relevant information during the reporting period?

□ Applicable √ Not applicable

IV. Summary of Accounting data and Financial index

Whether it has retroactive adjustment or re-statement on previous accounting data □Yes √No

Reporting periodSame period of last yearChanges of this period oversame period of Last year(%)
Operating income (Yuan)26,333,085,62423,141,441,94313.79%
Net profit attributable to the shareholders of the listed company (Yuan)-545,781,40632,474,158-1,780.66%
Net profit after deducting of non-recurring gain/loss attributable to the shareholders of listed company (Yuan)-641,232,514-21,871,771-2,831.78%
Cash flow generated by business operation, net (Yuan)5,959,027,6104,356,121,59836.80%
Basic earning per share(Yuan/Share)-0.1040.0062-1,780.66%
Diluted gains per share(Yuan/Share)-0.1040.0062-1,780.66%
Weighted average ROE(%)-2.36%0.14%-2.50%
As at the end of the reporting periodAs at the end of last yearChanged over last year (%)
Gross assets (Yuan)188,893,075,382186,034,251,2741.54%
Net assets attributable to shareholders of the listed company (Yuan)22,753,617,49723,444,357,218-2.95%

V.The differences between domestic and international accounting standards

1).Simultaneously pursuant to both Chinese accounting standards and international accounting standards disclosed in the financial reports of differences in net income and net assets.

□ Applicable□√ Not applicable

None

2).Differences of net profit and net assets disclosed in financial reports prepared under overseas and Chinese accounting standards.

□ Applicable √Not applicable

None

VI. Item and amount of non-current gains and losses

√Applicable □Not applicable

In RMB

ItemAmountNote
Non-current asset disposal gain/loss(including the write-off part for which assets impairment provision is made)13,269,231Mainly due to the comprehensive gains and losses from the disposal of land reclaimed for the Honghaiwan Power Plant and the disposal of scrapped equipment and other assets of other units.
Government subsidies recognized in current gain and loss(excluding those closely related to the Company’s business and granted under the state’s policies)6,854,598Mainly due to various government subsidies for energy saving and carbon reduction, technological transformation, etc., cumulatively received by the main subsidiaries.
Capital occupation charges on non-financial enterprises that are recorded into current gains and losses4,789,368It is primarily the interest income from the recovery of equity acquisition deposits by Guangdong Wind Power Company.
Other non-business income and expenditures other than the above169,856,604It is primarily the typhoon insurance compensation received by Yangjiang Wind Power and the project assessment compensation paid by the EPC contractor to Zhuhai Wind Power.
Less: Amount of influence of income tax48,692,450
Influenced amount of minor shareholders’ equity (after tax)50,626,243
Total95,451,108

Details of other profit and loss items that meet the non-recurring profit and loss definition

□ Applicable√ Not applicable

None

For the Company’s non-recurring gain/loss items as defined in the Explanatory Announcement No.1 on information disclosure for Companies Offering their Securities to the Public-Non-recurring Gains and Losses and its non-recurring gain/loss items as illustrated in the Explanatory Announcement No.1 on information Disclosure for Companies offering their securities to the public-non-recurring Gains and losses which have been defined as recurring gains and losses, it is necessary to explain the reason.

√ Applicable □ Not applicable

ItemAmount involved(Yuan)Reason
Value-added tax will be refunded immediately3,415,193Comply with national policies and regulations, and continue to occur.
Carbon emission quota used to fulfill the emission reduction obligation-72,586,715Comply with national policies and regulations, and continue to occur.

III. Management Discussion & Analysis

Ⅰ.Main Business the Company is Engaged in During the Report Period

The Company shall comply with the disclosure requirements of power-related industries in the Guideline No.3 for Self-regulation of Listed Companies of Shenzhen Stock Exchange-Industry Information Disclosure.

The Company mainly engages in the investment, construction and operation management of power projects, and the production and sales of electric power. It belongs to the power, heat production and supply industry classified in the “Guidelines for the Industry Classification of Listed Companies” by the China Securities Regulatory Commission. Since its foundation, the Company has always adhered to the business tenet of “Capital from the people, using it for electricity, and benefiting the public” and adheres to the business policy of “Centering on the main business of electricity, with diversified development”, focusing on the main business of power and making the power structure go diversified. In addition to the development, construction and operation of large-scale coal fired power plants, it also has clean energy projects such as LNG power generation, wind power generation and hydropower generation, which provides reliable and clean energy to users through the grid company.

As of June 30,2026,the Company had a controllable installed capacity of 47.7410 million kilowatts, of which 45.0171 million kilowatts were owned by the Company and 2.7238 million kilowatts were owned by the Company. Among them: coal-fired power generation holding installed capacity of 24.15 million kilowatts, accounting for 53.6 per cent; gas power holding installed capacity of 11.847 million kilowatts, accounting for 26.32 per cent; wind power holding installed capacity of 3.8948 million kilowatts, accounting for 8.65 per cent; photovoltaic holding installed capacity of 4.8925 million kilowatts, accounting for 10.87 per cent; hydroelectricity holding installed capacity of 132,800 kilowatts; Biomass holding installed capacity of 100,000 kilowatts; the above wind power, hydropower, photovoltaic, biomass and other renewable energy power generation holding installed capacity 9.0201 million kilowatts, accounting for 20.04%. In addition, The entrusted management installed capacity by the Company is 9.0455 million kilowatts (6.65 million kilowatts of thermal power, 2.2955 million kilowatts of hydropower, and 100,000 kilowatts of wind power), and the total controllable installed capacity and entrusted management installed capacity are 56.4745 million kilowatts.

Income source is primarily contributed by power production and sales, and main business income is derived from Guangdong Province. The company electricity sales price is subject to the benchmark price verified by the price authority per relevant policies based on National Development and Reform Commission (NDRC) and the electricity transaction price through the market trade implementation per Guangdong Electricity Market Trade Basic Rules and supporting files. During the reporting period, The Company's electricity sales were 65.714 billion kWh, a YOY increase of 23.14%; The average price of electricity sold in the consolidated statement was 445.90 yuan/ Thousand KWh, a YOY decrease of 34.11 yuan/Thousand kWh, a decrease of 7.11%; The operating income was 26,333.09 million yuan, a YOY increase of 3,191.65 million yuan or an increase of 13.79%.

The Company's main business is thermal power generation, the fuel costs account for a large proportion of operating costs, and fluctuations in coal and natural gas prices have a great impact on the Company's operating performance. During the reporting period, the Company's fuel cost was 19,313.78 million yuan, accounting for 76.25% of the operating cost, Affected by increased power generation and rising market prices for coal and natural gas, and the fuel cost increased by 4,325.61 million yuan YOY.

In the first half of 2026, thanks to the commissioning of new coal-fired power projects and improvements in the generation efficiency of existing units, the Company’s electricity supply to the grid increased by 23.14 per cent year-on-year. However, due to the continued decline in the comprehensive grid-connected electricity tariff, a yearon-year rise in fuel costs, and lower-than-expected utilisation hours for new energy projects—coupled with the impact of increased expenses such as depreciation, labour costs and interest on newly commissioned units—the gross profit margin of the Company’s power generation business continued to narrow. During the reporting period, the Company as a whole recorded a net profit attributable to shareholders of –545.78 million yuan, representing a loss compared with the previous year. Specifically, the coal-fired power business recorded a net profit attributable to shareholders of –544.90 million yuan; the gas-fired power business recorded a net profit attributable to shareholders of –256.55 million yuan; the hydropower business recorded a net profit attributable to shareholders of 6.03 million yuan; and the new energy business recorded a net profit attributable to shareholders of –97.89 million yuan; the Company’s head office investment operations recorded a net profit attributable to shareholders of 194.64 million yuan.

The Company shall comply with the disclosure requirements of power-related industries in the Guideline No.3 for Self-regulation of Listed Companies of Shenzhen Stock Exchange-Industry Information Disclosure.

As of June 2026, the Company had a total installed capacity of approximately 8.7873 million kilowatts in new energy sources such as wind power and photovoltaic power, of which approximately 2.2015 million KW was offshore wind power, approximately 1.6934 million kilowatts was onshore wind power, and approximately 4.8925 million kilowatts was photovoltaic power generation. In the first half of 2026, there were 300,000 kilowatts of wind power projects under construction at Guangdong Huilai Shibeishan and Shanxi Yuncheng, and approximately 500,000 kilowatts of photovoltaic projects under construction in Hainan, Guangdong and other regions in aggregate. In addition, 1.79 million kilowatts of projects had completed decision-making and were proposed for construction. In the future, the Company will continue to actively grasp the general development trend of accelerating energy transformation under the goals of "carbon peaking" and "carbon neutrality", implement the specific deployment of "1310" by the Guangdong Provincial Committee, further expand highquality new energy project resources, and build an ecologically civilized power generation enterprise.

II. Analysis On core Competitiveness

1. The largest listed company of power in Guangdong

The Company's main power generation assets are located in Guangdong Province, with a total asset size of more than 188.893 billion yuan,It is the largest listed company with state-owned assets in Guangdong Province. As of June 30, 2026, the Company, as the largest listed power company in Guangdong Province, It has a total of 39.0597 million kilowatts of unified dispatch units in the province, accounting for 14.10% of the installed capacity of Guangdong Province.

2. Strong background and resource advantages

Guangdong Energy Group, the controlling shareholder of the company, as a provincial key energy enterprise, has been actively supporting listed companies to become better and stronger by using the advantages of its resources, technology and asset scale. As the only listed company and main force of Guangdong Energy Group, the company has always been subordinated to serving the overall situation of the reform and development of Guangdong Province and Guangdong Yudean Group. It has deeply cultivated the main power industry, actively played the value discovery function and resource allocation function of the capital market, and assisted the reform and development of Guangdong Province's energy resources.

3. Comprehensive advantages of main business

Guided by the national energy development strategy, the Company implements the specific deployment of "1310" by the Guangdong Provincial Committee of the Communist Party of China, strives to build a first-class green and low-carbon listed power company, coordinates safety and development, optimizes and strengthens its coal-fired power, gas-fired power, and biomass power generation businesses, and vigorously develops new energy. The Company has a rich project pipeline and broad development prospects; with a clear core business, a rational structure, and prominent industry position and market share, it possesses strong comprehensive strength and vast development prospects.

4. Competitive advantage in electricity market

The Company's power generation units feature high parameters, large capacity, high operating efficiency, low coal consumption, stable operation, and superior environmental performance, providing it with a strong competitive advantage in the market. In the first half of 2026, the Company's cumulative grid-connected electricity volume within Guangdong Province amounted to 62.058 billion kWh, and its electricity sales scale continued to rank first in the province, with electricity sales prices better than the provincial average. The Company fully leverages its three major advantages of scale, brand, and service, utilizing its province-wide marketing service network, deep technical expertise in the power industry, and integrated resources to provide auxiliary value-added services to the power grid, such as peak shaving, frequency regulation, and reserve services, and to provide users with high-quality value-added services including comprehensive energy conservation and electricity consumption consulting.

5. Advantage of financial resources

The Company's total assets exceeded 180 billion yuan. and the cash flow of its stock business is abundant, which provides a good support for the Company's sustainable development. The Company is in good financia condition, with smooth financing channels such as bank credit, bonds and securities markets and diversified financing methods. The Company will make full use of internal and external financial resources to provide strong financial guarantee for the enterprise production and operation, key project construction and rapid development of new energy industries.

6. Regional development advantages

As the main energy source in Guangdong Province, the company shoulders the important task of helping Guangdong Province to build a clean, low-carbon, safe and efficient modern energy system. The Company wil actively integrate into the development of the Guangdong-Hong Kong-Macao Greater Bay Area, steadily promote the construction of key energy projects and new energy development in the province, actively seek to expand to regions with better resource conditions and higher power demand. Based on Guangdong, The Company will carr out the layout in the whole country, and help the implementation of the "30·60" goal.

III.Main business analysis

Found more in "I. Main businesses of the Company in the reporting period" Changes in the financial data

In RMB

This report periodSame period last yearYOY change (%)Cause change
Operating income26,333,085,62423,141,441,94313.79%
Operating cost25,330,875,07821,088,563,49220.12%
Sale expenses45,135,16943,731,6773.21%
Administrativeexpenses642,517,426606,233,0095.99%
Financial expenses1,145,543,7541,101,122,4874.03%
Income tax expenses187,723,646225,270,964-16.67%
R & D Investment173,308,351321,041,294-46.02%This was primarily due to the Company further tightening and quantifying its criteria for classifying R&D expenditure during the reporting period, resulting in a year-on-year decrease in eligible R&D expenditure.
Cash flow generated by business operation, net5,959,027,6104,356,121,59836.80%Increased revenue from the commissioning of new projects, leading to growth in cash inflows; increased fuel procurement and inventory, resulting in a year-on-year increase in fuel payables, thereby driving an increase in net cash flow from operating activities.
Net cash flow generated by investment-2,123,516,891-6,008,546,95764.66%it is primarily due to the commissioning of the Company's projects under construction, resulting in a significant year-on-year decrease in cash paid for the acquisition of fixed assets and other long-term assets.
Net cash flow generated by financing-2,171,495,6552,350,655,724-192.38%It is primarily due to the commissioning of the Company's projects under construction, resulting in a significant year-on-year decrease in cash inflows from financing activities due to reduced project fund-raising needs.
Net increasing of cash and cash equivalents1,664,014,879698,242,148138.31%It is primarily attributable to the year-on-year increase in net cash flows from operating and investing activities.

Major changes to the profit structure or sources of the Company in the reporting period □ Applicable √Not applicable The profit composition or sources of the Company have remained largely unchanged during the report period.

In RMB

(2)Situation of Industry, Product and District Occupying the Company’s Business Income and Operating Profit with Profit over 10%

This report periodSame period last yearIncrease /decrease
AmountProportionAmountProportion
Total operating revenue26,333,085,624100%23,141,441,943100%13.79%
On Industry
Electric power, Steam sales and labor income26,248,017,40299.68%23,024,016,64699.49%14%
Other85,068,2220.32%117,425,2970.51%-27.56%
On products
Sales Electric Power25,930,689,40198.47%22,669,486,57997.96%14.39%
Flyash sales43,087,7300.16%68,165,8910.29%-36.79%
Thermal sales236,766,4950.90%282,122,7701.22%-16.08%
Other122,541,9980.47%121,666,7030.53%0.72%
Area
Guangdong25,374,461,54496.37%22,204,032,56195.95%14.28%
Xinjiang598,862,2322.27%563,971,4552.44%6.19%
Hunan63,857,8310.24%81,754,5060.35%-21.89%
Hebei82,319,5510.31%76,735,4440.33%7.28%
Guangxi64,142,2710.24%55,953,7910.24%14.63%
Yunnan34,088,3360.13%31,118,0410.13%9.55%
Henan16,413,8380.06%15,399,8570.07%6.58%
Shanxi14,146,7970.05%6,790,5970.03%108.33%
Shandong13,480,0010.05%16,387,4520.07%-17.74%
Inner Mongolia38,785,3940.15%42,351,1820.18%-8.42%
Gansu12,169,0980.05%20,092,3910.09%-39.43%
Anhui20,358,7310.08%26,854,6660.12%-24.19%

√ Applicable □Not applicable

In RMB

TurnoverOperation costGross profit rate(%)Increase/decrease of revenue in the same period of the previous year(%)Increase/decrease of business cost over the same period of previous year (%)Increase/decrease of gross profit rate over the same period of the previous year (%)
On Industry
Electric power, Steam sales and labor income26,248,017,40225,300,553,8553.61%14%20.14%-4.92%
On Products
Sales Electric Power25,930,689,40125,024,651,3373.49%14.39%20.84%-5.16%
Including: Fire coal Generation Power16,828,695,65116,657,464,0341.02%21.18%28.81%-5.86%
Gas Generation Power6,655,105,2186,606,855,6190.73%1.65%2.91%-1.21%
Biomass2,446,888,5321,760,331,68428.06%9.48%29.74%-11.23%
Generation Power
Area
Guangdong25,374,461,54424,444,657,8963.66%14.28%20.23%-4.77%

Under circumstances of adjustment in reporting period for statistic scope of main business data, adjusted main business based on latest on year’s scope of period-end.

□ Applicable √Not applicable

IV. Analysis of Non-core Business

□ Applicable √Not applicable

V. Analysis of assets and liabilities

1.Significant changes in asset composition

In RMB

End of Reporting periodEnd of same period of last yearChange in percentage(%)Reason for significant change
AmountAs a percentage of total assets(%)AmountAs a percentage of total assets(%)
Monetary fund15,856,225,0938.39%14,839,620,1807.98%0.41%
Accounts receivable10,468,942,6645.54%9,583,184,9055.15%0.39%
Contract assets230,2190%899,8460%0%
Inventories3,934,096,8062.08%2,293,819,7951.23%0.85%
Real estate Investment319,678,9590.17%323,777,4840.17%0%
Long-term equity investment11,784,474,4176.24%11,543,456,2196.21%0.03%
Fixed assets101,009,972,68153.47%85,896,557,51546.17%7.30%
Construction in process15,289,675,0428.09%31,582,478,17016.98%-8.89%Primarily due to the transfer from construction in progress to fixed assets upon commissioning of projects under construction, including Jinghai Units 3 and 4 and the Bohe Phase II project.
Usage right assets10,832,326,0775.73%11,196,458,4606.02%-0.29%
Short-term loans9,830,784,4945.20%9,741,011,1575.24%-0.04%
Contract liabilities88,346,5560.05%77,103,3020.04%0.01%
Long-term loans67,432,289,33835.70%71,609,414,54438.49%-2.79%
Lease liabilities12,109,264,2516.41%12,394,114,6366.66%-0.25%

2.Main assets overseas

□ Applicable √Not applicable

3.Asset and Liabilities Measured by Fair Value

√ Applicable □Not applicable

In RMB

ItemOpening amountGain/Loss on fair value change in the reporting periodCumulative fair value change recorded into equityImpairment provisions in the reporting periodPurchased amount in the reporting periodSold amount in the reporting periodOther changesEnd of term
Financial assets
4. Other equity instrument investments3,009,689,888-152,155,0241,915,372,24800002,857,534,864
Total3,009,689,888-152,155,0241,915,372,24800002,857,534,864
Financial Liability00000000

Other change Did great change take place in measurement of the principal assets in the reporting period ? □ Yes √ No

4. Restricted asset rights as of the end of this Reporting Period

On June 30, 2026, individual subsidiaries of the Group pledged the right to impose electricity charges to banks to obtain long-term loans of 3,606,305,646 yuan which: the balance of long-term loans due within one year was 373,905,838yuan (as of December 31, 2025. Some subsidiaries of the Group have pledged their electricit billing rights to a bank to obtain a long-term loan of 3,935,009,425 yuan, including: the long-term borrowings due within one year amounted to 456,142,964 yuan .

VI. Investment situation

1. General

√ Applicable □ Not applicable

Investment of the periodInvestment of same period of last yearScale of change
455,231,000752,135,000-39.47%

2.Condition of Acquiring Significant Share Right Investment during the Report Period

√Applicable □ Not applicable

In RMB

Name of the Company InvestedMain BusinessInvestment WayInvestment AmountShare Proportion %Capital SourcePartnerInvestment HorizonProduct TypeProgress up to Balance Sheet DateAnticipated IncomeGain or Less or the Current InvestmentWhether to Involve in LawsuitDate of Disclosure (if any)Disclosure Index(if any)
Guangdong Yudean Red Bay Power Generation Co., Ltd.Thermal powerCapital increase438,665,00065%Self FundsGuangzhou Development Electric Group Co., Ltd. (Share Proportion: 25%) Shanwei Talent Development Group Co., Ltd. (Share Proportion: 10%)Long-termElectricity and coalShanwei Power Plant unit 5 and Unit 6 expansion project (2x1000mw) project is in normal progress-31,746,670.44NoMarch 16,2023Published in China Securities Daily, Securities Times , Shanghai Securities News , Securities Daily and http://www.cninfo.com.cn. (Announcement No.: 2023-13 .
Qiyang Yudean New Energy Co., Ltd.New Energy Power GenerationCapital increase16,566,000100%Self FundsNoLong-termElectricity and coalProject progress0NoNo
Total----455,231,000-------------31,746,670.44------

3.Situation of the Significant Non-equity Investment Undergoing in the Report Period

□ Applicable √ Not applicable

4.Investment of Financial Asset

(1)Securities investment

√ Applicable □ Not applicable

In RMB

Security categorySecurity codeStock Abbreviation:Initial investment costMode of accounting measurementBook value balance at the beginning of the reporting periodChanges in fair value of the this periodCumulative fair value changes in equityPurchase amount in the this periodSale amount in the this periodGain/loss of the reporting periodBook value balance at the end of the reporting periodAccounting itemsSource of the shares
Domestic and foreign stocksHK6963Sunshine insurance356,000,000FVM1,226,572,760-192,998,260677,574,5000001,033,574,500Other equity instrument InvestmentSelf funds
Domestic and foreign stocks600642Shenergy235,837,988FVM432,040,90652,755,637248,958,555000484,796,543Other equity instrument InvestmentSelf funds
Domestic and foreign stocks000027Shenzhen Energy15,890,628FVM98,582,400-4,838,40177,853,37100093,743,999Other equity instrument InvestmentSelf funds
Domestic and foreign stocks831039GMGITC3,600,000FVM20,232,000-7,074,0009,558,00000013,158,000Other equity instrument InvestmentSelf funds
Total611,328,616--1,777,428,066-152,155,0241,013,944,4260001,625,273,042----

(2)Investment in Derivatives

□ Applicable √ Not applicable

The Company had no investment in derivatives in the reporting period.

5.Application of the raised capita

□ Applicable √ Not applicable

The Company had no application of the raised capital in the reporting period.

VII. Sales of major assets and equity

1.Situation of Significant Asset Sale

□ Applicable √ Not applicable

2.Sales of major equity

□ Applicable √ Not applicable

VIII. Analysis of the Main Share Holding Companies and Share Participating Companies

√ Applicable □ Not applicable

Situation of Main Subsidiaries and the Joint-stock Company with over 10% net profit influencing to the Company In RMB

Company NameCompany typeSectors engaged inRegistered capitalTotal assetsNet assetsTurnoverOperating profitNet Profit
Guangdong Huizhou Pinghai Power Generation Co., Ltd.SubsidiaryPower generation and power station construction.1,370,000,0003,479,476,2422,275,625,4192,068,633,957209,909,620155,918,526
Guangdong Shajiao (C) Power Generation Co., Ltd.SubsidiaryPower generation and power station construction.2,500,000,0004,861,740,8722,123,252,150755,022,10227,294,27675,491,854
Dongguan Ningzhou Energy Investment Partnership (LP)SubsidiaryPower generation and power station construction.4,745,908,4005,786,145,0954,921,139,0551,567,480,20768,671,92768,794,434
Yudean Shache Integrated Energy Co., Ltd.SubsidiaryPower generation and power station construction.1,256,610,4704,855,981,1351,116,149,195103,646,833-64,723,661-64,723,661
Zhanjiang Zhongyue Energy Co.,Ltd.SubsidiaryPower generation and power station construction.2,021,300,0002,930,868,705294,771,236981,667,149-43,886,062-66,523,646
Guangdong Yudean Power Plant Co., Ltd.SubsidiaryPower generation and power station construction.1,070,000,0004,279,715,863574,537,5581,425,570,201-53,529,407-67,056,899
Guangdong Yudean Huadu Natural gas Co., LtdSubsidiaryPower generation and power station construction.497,000,0002,074,776,665-35,736,231378,631,380-82,692,426-82,597,413
Guangdong YudeanSubsidiaryPower generation and power station550,000,0002,216,467,848344,528,362255,351,104-94,182,104-94,182,103
Yongan Natural gas Co., Ltd.construction.
Guangdong Yudean Dapu Power Generation Co., Ltd.SubsidiaryPower generation and power station construction.1,907,100,00010,605,425,9331,263,129,1681,791,632,394-163,696,185-128,181,594
Guangdong Yuedan Daya Bay Integrated Energy Co., LtdSubsidiaryPower generation and power station construction.764,000,0003,672,717,118521,422,4621,234,347,238-148,661,535-148,595,002
GuangdongEnergy Maoming Thermal Power Plant Co., Ltd.SubsidiaryPower generation and power station construction.1,437,985,1002,293,819,640142,213,093737,742,472-167,128,681-178,247,236
Shanxi Yudean Energy Co.,Ltd.Sharing CompanyMining and power generation1,620,749,10014,182,544,39710,761,750,378174,643,232304,220,685277,520,694
Guangdong Electric Industry Fuel Co., Ltd.Sharing CompanyInvestment and operation of coal, transportation and other projects2,640,328,90020,480,302,3455,204,315,48818,437,428,622238,847,175255,157,534
Guangdong Energy Group Finance Co., Ltd.Sharing CompanyFinance3,000,000,00040,726,642,9234,551,862,731351,088,600272,399,875209,860,303

Acquirement and disposal of subsidiaries in the Reporting period

√ Applicable □ Not applicable

Company nameWay of acquiring and disposing of subsidiary corporations within the reporting periodImpact on the whole producing operation and performance
Huaihua Ruisi New Energy Partnership (LP)Investment establishmentIt has no significant impact on the Company's existing business and operating performance.
Qiyang Yudean New Energy Co., Ltd.Investment establishmentIt has no significant impact on the Company's existing business and operating performance.
Guangdong Yudean Bijie New Energy Co., Ltd.Cancellation liquidationIt has no significant impact on the Company's existing business and operating performance.
Guangdong Yudean Qiming Energy Co., Ltd.Cancellation liquidationIt has no significant impact on the Company's existing business and operating performance.

Note

(1) Affected by factors such as the continued decline in the comprehensive on-grid tariff and rising fuel prices, the operating performance of some of the Company's subordinate thermal power plants decreased year-on-year during the reporting period.

(2) During the reporting period, due to lower-than-expected utilization hours of photovoltaic power generation projects, combined with the impact of project commissioning and transfer to fixed assets, which resulted in a yearon-year increase in depreciation and interest expenses, the loss of the Company's subordinate Shache Company widened year-on-year.

(3) During the reporting period, the profitability of the Company's equity-investee finance company and Shanxi Energy Company remained largely flat year-on-year; the equity-investee fuel company, driven by an increase in purchase and sales business volume, recorded a 43% year-on-year increase in operating revenue, and the Company's investment income from equity investees grew year-on-year.

IX.Structured vehicle controlled by the Company

√Applicable □Not applicable

GF Securities issued the Guangdong Wind Power Company New Energy Infrastructure Investment Green Carbon Neutral Asset-Backed Special Plan in 2024, with the wind farm projects held by the Company's subsidiaries, Pingyuan Wind Power and Herun New Energy, as the underlying assets; China Securities Co., Ltd. issued the Guangdong Electric Power-Binhaiwan Energy Infrastructure Investment Asset-Backed Special Plan in 2025, with the natural gas power plant project held by the Company's subsidiary, Binhaiwan Company, as the underlying assets; GF Securities issued the Guangdong Wind Power Company New Energy Infrastructure Investment Green Carbon Neutral Asset-Backed Special Plan during the current period, with the new energy power generation projects held by the Company's subsidiaries, Lanshan Yuefeng and Qinglong Manchu Photovoltaic, as the underlying assets. In accordance with the "Accounting Standards for Business Enterprises No. 33 – Consolidated Financial Statements", the Company has included three structured entities that meet the definition of "control" within the scope of consolidated statement. As of June 30, 2026, the equity of the above structured entities attributable to the Group amounted to RMB 1,607,760,517; the equity of other equity holders is presented as noncontrolling interests in the consolidated statements, totaling RMB 6,554,043,895.

X. Risks facing the Company and countermeasures

1. Work safety risk

First, In the post-flood season, typhoons are characterized by higher intensity and greater impact, with frequent local meteorological disasters such as heavy rainfall and strong winds, leading to continuously escalating safety risks in the fields of flood control, typhoon prevention, and drought relief; Second, Currently, the critical period for ensuring power supply during the summer peak demand overlaps deeply with the dispatch and operation of the electricity spot market, resulting in increased frequency of deep peak shaving and start-stop operations of units, which places significant pressure on the intrinsic safety and operational stability of equipment.Third,infrastructure construction, maintenance, and technical upgrade projects are being advanced intensively, with high-risk operations covering a wide scope, and the difficulty of on-site full-process safety management and control has increased.

Response measures: First, make every effort to carry out all flood control and typhoon prevention work during the post-flood season, closely monitor rainfall and flood conditions, strengthen duty attendance, Timely obtain early warning and emergency response information, strengthen coordination and analysis, promptly activate the emergency response, and proactively implement preventive measures in advance. Second, in light of the characteristics of summer peak demand and spot electricity dispatch conditions, strengthen equipment maintenance and overhaul, daily operational inspections, and specialized technical supervision in a targeted manner, meticulously and in detail, enhance the operational reliability and condition stability of unit equipment, and ensure safe and stable power supply. Third, focus on infrastructure, maintenance, and technical upgrade projects, achieve full-coverage safety management at operation sites, strictly implement rigid systems such as high-risk operation approval, on-site attendant supervision, and safety measure verification, consolidate safety responsibilities at all levels, rigorously investigate and penalize rule-breaking operations, strengthen personnel safety training, resolutely prevent and curb all types of personal injury accidents, firmly hold the bottom line of work safety, and ensure a stable and controllable production situation.

2. Increasingly fierce competition in the electricity market

As market-oriented reforms in the electricity sector continue to deepen, competition in Guangdong Province’s generation market is becoming increasingly fierce, with traditional power generation units facing price pressures and their profit margins continuing to narrow; compounded by the high proportion of medium- and long-term transactions and falling contract prices for long-term agreements, power stations are facing significant pressure on their operating revenue and profits.

Countermeasures: First, spare no effort to expand the market. Strengthen the power generation process management, optimize the operation mode of the units, ensure the implementation of various types of electricity contracts for thermal power units, and ensure that new energy units can generate more electricity at full capacity, striving to achieve the Company's annual electricity target. Second, strengthen the analysis and judgment of the electricity market, dynamically optimize market competition strategies, continuously improve and strengthen the construction of the electricity marketing system, strive for the tariff of electricity traded in the market above the market average level, further improve the collaborative operation mechanism of the electricity spot market, and scientifically formulate the trading strategies. Third, focus on cost control. Strengthen the idea of leading an austere life, strictly control general management expenses and non production expenses, strive to control power generation and operating costs, and improve the Company's market competitiveness.

3. Risk of power structure adjustment

Under the background of carbon peaking and carbon neutrality, as well as the "30•60" goal, energy production and consumption are accelerating towards low carbon transformation. According to China's requirements of optimizing the energy structure, It will promote the transformation of coal-fired power from a basic guarantee power source to a supporting and regulating power source. The growth in installed capacity and power generation of new energy sources such as wind power and photovoltaic power will further squeeze the power generation space of traditional energy units.By the end of June 2026, the holding installed capacity of the Company's coalfired power accounted for 53.65%, which was high, with greater transformation pressure of clean and low-carbon power supply.

Countermeasures: First, steadily promote the transformation and upgrading of power supply structure, strive to achieve greater breakthroughs in structural adjustment, Solidly promote Dananhai gas and electricity project, Xinjiang Karamay photovoltaic project, Yunfu natural gas cogeneration project, Huizhou New Materials Industrial Park cogeneration project, etc., to ensure that the project investment and construction plan are completed on schedule. The second is to actively explore the development space of new energy in other provinces and regions in China, anchor high-quality development goals, and explore high-quality resources. The third is to continue to optimize carbon asset management, make full use of internal and external resources, strengthen carbon emission data management and carbon asset operation and management, promote energy conservation and carbon reduction, and realize the value-added and income of carbon assets. The Fourth is to Actively lay out the new energy storage industry, solidly advance the Zhuhai Fushan independent energy storage power station and the Guangdong Province thermal power combined frequency regulation energy storage projects, and continuously enrich the pipeline of energy storage projects.

XI. Formulation and implementation of market value management system and valuation boost plan

Whether the Company has established a market value management system

<sup></sup>Yes□ No

Whether the Company has disclosed plans for valuation boost.

□YesNo

In accordance with The Company Law of the People's Republic of China, The Securities Law of the People's Republic of China, the Rules for the Listing of Stocks on the Shenzhen Stock Exchange, the Regulatory Guidelines for Listed Companies No. 10 - Market Value Management and other relevant laws and regulations and the articles of association of the Company, the Company formulates the Market Value Management System of Guangdong Electric Power Development Co., Ltd. The Company will firmly establish a sense of returning shareholders, take measures to protect the interests of investors, especially small and medium-sized investors, be honest and trustworthy, standardize operations, focus on the main business, operate steadily, promote the improvement of business level and development quality with the cultivation and application of new quality productivity, and on this basis, do a good job in investor relations management, enhance the quality and transparency of information disclosure, and actively take measures to boost investor confidence when necessary, and promote the Company's investment value to reasonably reflect the Company's quality.

XII. The implementation of the action plan of "Double improvement of quality and return".

Whether the Company has disclosed the action plan of "Double improvement of quality and return".

<sup></sup>Yes □No

1.Focus on the main responsibility and main business, and build a first-class green and low-carbon power listed company. Since its establishment, the Company has always adhered to the business philosophy of "drawing capital from the people, using capital for electricity, and benefiting the public" and the business policy of "focusing on electricity, with diversified development", focusing on the main business of electricity. It has diversified power structure and various energy projects such as large-scale coal-fired power generation, natural gas power generation, biomass power generation, wind power generation, solar power generation, and hydropower generation, to provide reliable and clean energy to users through the power grid company. As of June 30, 2026, the Company has a controllable installed capacity of 47.7410 million kilowatts, including 24.15 million kW controlling installed capacity of coal-fired power, 11.847 million kW controlling installed capacity of gas fired power, and 8.7873 million kW controlling installed capacity of new energy such as wind power and photovoltaic power, and a total controllable installed capacity and entrusted management installed capacity of 56.4745 million kW. It is the largest listed power company in Guangdong Province in terms of installed capacity.

2. Strengthen technological leadership, actively cultivate and develop new productive forces. The Company actively implements the strategy driven by scientific and technological innovation, and orderly constructs a deep integration system of "Industry-University-Research Institution Cooperation". Since 2023, the Company has added one provincial-level certified R&D platform and three municipal level certified R&D platforms, undertaken one national key R&D project and three provincial key R&D projects; In 2026, 49 new utility model patents were granted and 11 invention patents.

3. Value shareholder returns, stabilize dividends, and share the fruits of business development. The Company attaches great importance to protecting the rights and interests of investors and adheres to the principle of "Any profit must be distributed" Except for the periodic losses incurred during 2021-2022 in fulfilling the responsibility of power and energy security, the Company has consistently adhered to distributing cash dividends to shareholders. The Company's cash dividend policy objective is normal dividend plus extra dividend. The Company's annual profit distributed in cash shall not be less than 10% of the distributable profit realized in that year, and the cumulative profit distributed in cash over the most recent three years shall not be less than 30% of the average annual distributable profit realized over the most recent three years. When the Company distributes profits, the proportion of cash dividends in such profit distribution shall be at least 20%.Since its listing in 1993, the Company has accumulated cash distributions to shareholders of RMB 13.376 billion, which fully demonstrates the Company's sound operating performance and its sincere return to investors.

4. Standardize information disclosure and strengthen investor relation management. The Company strictly adheres to the provisions of laws and regulations such as the Company Law and the Management Measures for Information Disclosure of Listed Companies, and follows the principles of "truthfulness, accuracy, completeness, timeliness, and fairness" to fulfill its information disclosure obligations in accordance with the law. Its information disclosure has been rated "A" by the Shenzhen Stock Exchange for eleven consecutive years. The Company will continue to focus on improving transparency and lead by investor demand, and enhance the pertinence and effectiveness of information disclosure through voluntary release of disclosure announcement on quarterly power generation completion information and other measures; At the same time, it will continue to strengthen investor relation management, establish a multi-channel and multi-level investor communication system through on-site investor research, investor hotlines, emails, the Shenzhen Stock Exchange's platform (irm.cninfo.com.cn), performance briefings, and other forms, increase investors' (especially the medium and small investors') understanding of the Company's production and operation, and build a positive interactive investor relationship, to provide investors with a real, transparent, and compliant Guangdong Electric Power.

IV Corporate Governance, Enviornmental and Social Responsibility

I. Changes of directors, supervisors and senior executives

<sup></sup>Applicable □Not applicable

NamePositionsTypesDateReason
Wang PeipeiExecutive Deputy General ManagerDimissionJune 25,2026Job changes
Liu WeiBoard SecretaryDimissionAugust 18,2026Job changes
Qin XiaoBoard SecretaryAdmissionAugust 18,2026Job changes

II. Profit distribution plan and capitalizing of common reserves plan for the Period

□Applicable<sup></sup>Not applicable

The Company has no plans of cash dividend distributed, no bonus shares and has no share converted from capital reserve either for the semi-annual.

III. Implementation of the company’s stock incentive plan, employee stock ownership plan or other employee incentives

□Applicable<sup></sup>Not applicable

The Company had no implementation of the company’s stock incentive plan, employee stock ownership plan or other employee incentives in the reporting period.

IV. Environmental information disclosure situation

Whether the listed companies and their main subsidiaries are included in the list of enterprises that disclose environmental information according to law

Number of enterprises in the mandatory Environmental information disclosure list(In Units)20
S/NCompany NameQuery Index
1Bohe EnergyRefer to the Guangdong Provincial Department of Ecology and Environment—Enterprise Environmental Information Disclosure System, “Disclosure Report” module
2Dapu Power Generation
3Red Bay Power Generation
4Jinghai Power Generation
5Maoming Thermal Power plant
6Pinghai Power Generation Plan
7Shaoguan Power Generation Plant
8Yunhe Power Generation Plant
9Zhanjiang Electric Power
10Zhongyue Energy
11Guangqian Power
12Huizhou Natural gas
13Yuehua Power Generation
14Xinhui Power Generation
15Binhaiwan Energy
16Huadu Natural gas
17Biomass Power Generation
18Dayawan Company
19Yongan Natural gas
20Tumushuke Thermal PowerRefer to “Disclosure Reports” module of the Corps Enterprises Environmental Information Disclosure System in accordance with the law

The Company is required to comply with the disclosure requirements for the ‘Electricity Supply Sector’ set out in the Shenzhen Stock Exchange’s‘Guideline No. 3 on Self-Regulatory Supervision of Listed Companies - Industry Information Disclosure

1. The Company strictly complies with the relevant laws of People’s Republic of China in the course of its production and business operations. In the first half of 2026, the Company’s thermal power stations incurred operating expenses totalling approximately 99.86 million yuan, primarily for the purchase of desulphurisation and denitrification materials, in accordance with environmental protection policies and regulations; the Company paid environmental protection tax amounting to 51.14 million yuan.

2. In the first half of 2026, the Company’s thermal power stations recorded a comprehensive standard coa consumption for electricity generation of 287.70 grams per kilowatt-hour, with performance values for sulphur dioxide emissions of 0.052 grams per kilowatt-hour, nitrogen oxides emissions of 0.126 grams per kilowatt-hour, and particulate matter emissions of 0.008 grams per kilowatt-hour. Specifically, the desulphurisation units operated at 100 per cent capacity, with an average desulphurisation efficiency of 98.91 per cent; the denitrification units operated at an average capacity of 99.83 per cent, with an average denitrification efficiency of 88.03 per cent; and the dry dust removal units operated at 100 per cent capacity, with an average dust removal efficiency of 99.88 per cent.

3. In the first half of 2026, the Company launched a special campaign to control and reduce coal consumption in coal-fired power units, completing flow-optimisation retrofits on two units, resulting in a year-on-year reduction in coal consumption for power generation of 7.38 grams per kilowatt-hour.

4. The Company continued to focus on carbon asset management and carbon resource development, helping regulated enterprises reduce compliance costs by approximately 6 million yuan.

Details of environmental incidents involving the listed company

In the first half of 2026, the Company did not experience any environmental incidents.

V. Social responsibilities

In 2026, the Company has actively responded to the national rural revitalization strategy, thoroughly implemented the deployment of the "High-quality Development Project of 100 Counties, 1000 Towns and 100 Villages" in Guangdong Province, and actively carried out consumption assistance in combination with the local development situation, continuously explored and practiced new consumption poverty alleviation models, and set up a specia working group to solidly promote the work of helping villages in towns, accurately met the needs of the assistance areas, and continued to deliver key resources such as funds, technology and talents, so as to contribute to the rura revitalization and regional development of Guangdong Province.

The Company has selected village cadres to go to Jishui Village, Bawan Town, Lufeng City, to carry out rural revitalization work around the five major revitalizations of Jishui Village, including industry, talents, culture, ecology and organization. In 2026,

In 2026, Red Bay Power Generation Company applied for project funds of RMB 280,000 to support the Jishu Village farmland irrigation channel construction project, effectively ensuring crop irrigation water, improving grain yield and multiple cropping index, and contributing to agricultural production increase and farmers' income growth; carried out youth forest tree-planting activities to support the ecological construction of Green and Beautiful Guangdong, planting a total of 684 trees respectively in Shanwei Red Bay Economic Development Zone and Jishui Village, Bawan Town, Lufeng City, Shanwei City (a rural revitalization support point). Meanwhile, through the Alipay Ant Forest public welfare platform, it carried out "online cloud planting and breeding" activities, including tree adoption, nurturing, donation, and protection of ancient and famous trees.

1.HongHaiwan Power Generation Company counterpart helps Jishui Village, Bawan Town, Lufeng City The Company has selected village cadres to go to Jishui Village, Bawan Town, Lufeng City, to carry out rural revitalization work around the five major revitalizations of Jishui Village, including industry, talents, culture, ecology and organization. In 2026, In 2026, Red Bay Power Generation Company applied for project funds of RMB 280,000 to support the Jishui Village farmland irrigation channel construction project, effectively ensuring crop irrigation water, improving grain yield and multiple cropping index, and contributing to agricultural production increase and farmers' income growth; carried out youth forest tree-planting activities to support the ecological construction of Green and Beautiful Guangdong, planting a total of 684 trees respectively in Shanwei Red Bay Economic Development Zone and Jishui Village, Bawan Town, Lufeng City, Shanwei City (a rural revitalization support point). Meanwhile, through the Alipay Ant Forest public welfare platform, it carried out "online cloud planting and breeding" activities, including tree adoption, nurturing, donation, and protection of ancient and famous trees.

2.Jinghai Power Generation Company counterpart helps Huilai County, Jieyang City

In 2026, Jinghai Power Generation Company participated in the unveiling ceremony of the "Energy Hut" at Hailai No.2 Middle School in Jinghai Town, HuiLai County, Jieyang City. and conducted special lectures on power science popularization inside the Energy Hut, teaching knowledge on power safety and power generation environmental protection, integrating the power plant's professional knowledge into practice, which not only enhanced students' understanding of the energy sector but also strengthened the promotion of safety and environmental awareness; It invited more than 30 teachers and student representatives from Jinghai Town Centra Primary School to visit the plant area and held a public open day for environmental protection facilities, allowing them to experience the production process and environmental practices of green power up close, helping rura students broaden their horizons and increase their knowledge, and further demonstrating Jinghai Power Generation Company's green and open corporate image.

3. Shaoguan Power Plant counterpart helps Dongping Town, Ruyuan Yao Autonomous County, Shaoguan City In 2026, Shaoguan Power Plant made every effort to promote rural revitalization in Dongping Town: organized multiple field surveys to consolidate support responsibilities; completed two rounds of visits to 211 monitored households and provided targeted support to 39 key households; carried out New Year outreach activities to convey the Company's warmth; promoted agricultural product consumption through multiple channels; planned to donate RMB 100,000 to support the construction of a basketball court in Changxi Village; and over 40 volunteers from the Company carried out tree-planting activities. Through multiple measures, it continuously empowered rural revitalization.

4. Yunhe Power Generation Company counterpart helps Yaogu Town, Yunfu Yuncheng District

First, Joint construction and co-building, planting and protecting greenery to foster new social norms. The Yunhe Power Generation Company has collaborated with all the affiliated units within the group, and in collaboration with the Yaogu Town People's Government, carried out a themed event titled "Planting New Green with Youth, Nurturing the Original Aspiration with Clean Breeze". Over 80 participants, including Party members and cadres from the supporting units, members of the resident working team in Yaogu Town, and youth volunteers, took par in the event. Through practical actions, they contributed to the greening and beautification of rural areas and promoted a culture of integrity and upright conduct. Second, Deepening consumption support to help increase farmers' income. Yunhe Power Generation Company organized a consumption support activity, centrally purchasing agricultural specialty products such as sword flower, rice, and peanut oil from Shuidong Village through the Shuidong Economic Joint Cooperative of Yaogu Town, Yuncheng District, Yunfu City, with a tota procurement amount of RMB 129,000. Through market-oriented procurement, it directly benefited farmers and promoted the transformation from "blood transfusion-style support" to "blood production-style support", effectively stimulating the endogenous driving force of rural industries.

5. Zhongyue Energy Company counterpart helps Jijia Town, Leizhou City

In 2026, First, Zhongyue Energy Company, following a multi-tiered screening process that involved preliminary reporting by village committees, joint review by the Civil Affairs Office, the Agricultural Office, and the resident working team, and final approval by town leadership, identified 60 households in financial difficulty for visitation and support activities. Second, The Company conducted in-home visits, engaging in face-to-face conversations with residents, distributing care packages, and providing tailored assistance based on the specific circumstances of each household. In collaboration with the Leizhou Calligraphers Association, the Company held a Spring Festival couplet giveaway event at the small square in front of the Jijia Town Government office, under the theme "Party Leadership Empowers Rural Revitalization – Welcoming Spring with Blessings, Warming Every Home". Festive couplets were distributed free of charge to local residents, adding to the joyful atmosphere of the upcoming New Year. Third, Actively responding to the call for the ecological construction of Green and Beautiful Guangdong, it twice organized Party members and young employees to go to Jijia Town, Leizhou City to carry out activities themed on jointly building the "Hundred-Thousand-Ten-Thousand Project" support forest and on jointly building beautiful town entry corridors. Fourth, To support primary and secondary education in Jijia Town, the company conducted surveys and visits to local schools and compiled a list of educational assistance needs. Through various channels, the Company reached out to local dignitaries, charitable foundations, and public welfare organizations to secure donations of a wide range of supplies, including integrated teaching machines, desks and chairs, a reading room, books, water purifiers, dining tables, sports shoes, and clothing. In addition, it provided financial support to 15 students from low-income families and awarded 51 outstanding students, contributing to improved teaching quality and the development of campus culture. Fifth, The company conducted a comprehensive assessment of the current state of agricultural industry development in Jijia Town, Leizhou City, to establish a foundation for the formulation of targeted industrial assistance policies. It also led relevant enterprises on on-site inspections, creating conditions for increased agricultural efficiency and higher farmer incomes.

V. Important Events

I. The fulfilled commitments in the reporting period and under-fulfillment commitments by the end of the reporting period made by the company, shareholder, actual controller, acquirer, director, supervisor, senior management personnel and other related parities.

□ Applicable √Not applicable

There is no commitment that has not been fulfilled by actual controller, shareholders, related parties, acquirers of the Company

II. Particulars about the non-operating occupation of funds by the controlling shareholder

□ Applicable √ Not applicable

No non-operational fund occupation from controlling shareholders and its related party in period.

III. External guarantee out of the regulations

□ Applicable √ Not applicable

No external guarantee out of the regulations occurred in the period.

IV. Appointment and non-reappointment (dismissal) of CPA

Whether the semi-annual financial report had been audited

□Yes √ No

The semi-annual report was not audited

V. Explanation on “non Qualified Opinion” from CPA by the Board and Supervisory Committee

□ Applicable √ Not applicable

VI. Explanation from the Board for “non Qualified Opinion” of last year’s

□ Applicable √ Not applicable

VII. Bankruptcy reorganization

□ Applicable √ Not applicable

No bankruptcy reorganization for the Company in reporting period

VIII. Litigations and arbitrations

Significant litigations and arbitrations

□ Applicable √ Not applicable

No such cases in the reporting period.

Other lawsuits

<sup></sup>Applicable □Not applicable

Basic situation of litigation(arbitration)Amount involved(Ten thousand yuan)Whether to form estimated liabilitiesLitigation (arbitration) progressLitigation (arbitration) trial results and impactImplementation on of litigation (arbitration) judgmentsDisclosure dateDisclosure index
Case of Yangjiang Wind Power Company v China Energy Engineering Group Guangdong Thermal Power Engineering Co., Ltd. and Jiangsu Huaxicun Marine Engineering Services Co., Ltd. concerning a construction contract dispute:Main Action: Yangjiang Wind Power Company's claims include: 1. The return of the advance payment for the works and the payment of liquidated damages for delay in completion, totalling 176,739,200 yuan; 2. That the litigation costs, preservation fees, legal fees and all reasonable expenses incurred in connection with this case be borne jointly by the Guanghuo-Huaxi Consortium.Counterclaim: China Energy Construction Group Guangdong Thermal Power Engineering Co., Ltd. and Jiangsu Huaxicun Marine Engineering Services Co., Ltd. have filed a counterclaim against Yangjiang Wind Power Company, with the following claims: 1. Payment of the settlement amount of 249,405,300 yuan and interest on late payment of 63,687,200 yuan; 2. A right of priority to be repaid from the proceeds of the valuation or auction of the project works in respect of the outstanding amount under Claim 1; 3. All costs in this case, including litigation costs and expert assessment fees, shall be borne by Yangjiang Wind Power Company.Claim:17,673.92Counterclaim:24,940.53NoOn 30 June 2026, the Guangzhou Maritime Court delivered its first-instance judgement, dismissing all claims brought by the plaintiff, Yangjiang Offshore Wind Power Company, and ordering Yangjiang Offshore Wind Power Company to pay the Guanghuo-Huaxi Consortium the final settlement amount of 13,944,300 yuan plus corresponding interest, as well as to bear the full litigation costs of the main action amounting to 925,500 yuan, a portion of the counterclaim costs amounting to 35,700 yuan, and expert assessment fees of 9,376 yuan.Yangjiang OffshoreWind Power Company, dissatisfied with the first-instance judgement, lodged an appeal.This case is currently under appeal, and it is not yet possible to predict the outcome or its implications.No
Longyuan Zhenhua Company was the contractor for the PC package of Phase II of the Zhanjiang Wailuo Offshore Wind Farm Project. The project contract was signed on 29 March 2020, with construction commencing on 28 April 2020 and handover taking place on 30 June 2022. However, since 16 December 2021, the wind farm has experienced repeated subsea cable faults, resulting in losses of approximately 226,845,200 yuan to Qujie Wind Power Company.Main Claim: Qujie Wind Power Company has brought an action for breach of contract on the grounds that the works were not carried out in accordance with the design, seeking compensation of 102,526,900 yuan for emergency repair and remediation costs, 124,318,300 yuan for lost electricity generation, and the payment of legal costs.Counterclaim: Longyuan Zhenhua Company filed a counterclaim seeking payment of 422,619,100 yuan in project costs and interest, as well as priority repayment of the principal sum of 387,850,200 yuan and the corresponding interest.Claim: 22,684.52 Counterclaim: 42,261.91NoThis counterclaim is currently at the stage of judicial expert assessment.As the case is currently at the forensic assessment stage, it is not yet possible to predict the outcome of the proceedings or their implications.No
On 30 September 2022, Guangdong Wind Power Company and Shandong Electric Power Company, amongst others, signed the ‘Framework Agreement for the Acquisition of 100 per cent Equity in Gaotang Fengxu New Energy Co., Ltd.’, stipulating that the project was to be connected to the grid at full capacity by 30 September 2023. As the counterparty failed to complete construction for over 17 months, thereby rendering the contractual objective unachievable, Guangdong Wind Power Company exercised its “right of unilateral termination” on 11 March 2025 and issued a letter terminating the agreement; on 24 March, it honoured the performance bond of 41,226,000 yuan issued by Shandong Power Company. In April of the same year, Shandong Electric Power Company brought an action before the Gaotang County People’s Court, seeking: 1. the continued performance of the agreement and compensation of 41,226,000 yuan; 2. that Shengshi Longhong Power Co., Ltd. and others bear joint and several liability for the debt; and 3. that Guangdong Chengjiantou Engineering Guarantee Group Co., Ltd. and others bear joint and several liability up to the amount of33,106,000 yuan.4,122.60NoOn 30 March 2026, the People’s Court of Gaotang County, Shandong Province, delivered a first-instance judgement dismissing all claims brought by the plaintiff, Shandong Electric Power Company, against Guangdong Wind Power Company. Shandong Electric Power Company, dissatisfied with thefirst-instance judgement, lodged an appeal.Victory in the first instance.No
The case brought by the claimant, Longyuan Zhenhua Company, against the defendant, Qujie Wind Power Company, concerning a dispute over a construction contract, bears the case number (2025) Yue 72 Min Chu 2986. Main Claim: Longyuan Zhenhua Company seeks payment from Qujie Wind Power Company of the outstanding principal sum of RMB 330,704,740.09 for the remaining works under contracts including the ‘Contract for the PC Lot of the Guangdong Yuedian Zhanjiang Xinliao Offshore Wind Power Project’, the ‘Technical Agreement for the PC Lot of the Guangdong Yuedian Zhanjiang Xinliao Offshore Wind Power Project’ and the ‘Second Supplementary Agreement to the Contract for the PC Lot of the Guangdong Yuedian Zhanjiang Xinliao Offshore Wind Farm Project’, totalling RMB 330,704,740.09, together with interest on overdue payments of RMB 1,896,893.63 (calculated provisionally up to 25 July 2025), making a total of 332,601,633.72 ten thousand yuan. The claimant further requests the court to rule that the claimant is entitled to a priority right of payment in respect of the construction project costs from the proceeds of the sale by valuation or auction of the works under the PC Lot of the Guangdong Yuedian Zhanjiang Xinliao Offshore Wind Farm Project, with the amount subject to priority payment being the principal sum of RMB 330,704,740.09 and the corresponding interest. Counterclaim: Qujie Wind Power Company has filed a counterclaim, seeking an order requiring the counter-defendant to compensate the counter-plaintiff for the costs of emergency repairs to the submarine cable amounting to 11,070,485.65 yuan and the loss of electricity generation caused by the submarine cable fault amounting to 12,118,224.41 yuan, to pay a penalty of 4,572,230.52 yuan for failing to carry out the works in accordance with the design scheme, a penalty of 120,000,000 yuan for the unauthorised departure of vessels and machinery; the administrative fines of 5,612,274.90 yuan already paid by the counter-plaintiff; and technical service fees of 675,000 yuan incurred by the counter-plaintiff for supplementary on maritime use rights; the total of the above amounts to 154,048,215.48 yuan.Claim: 33,260.16 Counterclaim: 15,404.82NoAll these counterclaims are currently at the stage of judicial expert assessment.As the case is currently at the forensic assessment stage, it is not yet possible to predict the outcome of the proceedings or their implications.No
On 9 February 2021, Zhengli Offshore Engineering, Longyuan Zhenhua and Qujie Wind Power entered into the ‘Irrevocable Payment Agreement for the Wailuo Offshore Wind Farm Phase II and Xinliao Offshore Wind Farm8,100.00NoOn 19 May 2026, the judgment of the court of firstVictory in the first instance.No
Projects' (hereinafter referred to as the ‘Payment Agency Agreement’), under which Longyuan Zhenhua authorised Qujie Wind Power to pay construction costs to Zhengli Offshore Engineering in accordance with the terms of the Payment Agency Agreement. Zhengli Offshore Engineering claims that, in relation to the construction of the Guangdong Yuedian Wailuo Phase II Offshore Wind Farm and the Guangdong Yuedian Xinliao Offshore Wind Farm covered by the ‘Construction Contract’ with Longyuan Zhenhua, a total of RMB 87,765,000 in construction costs remains unpaid as agreed. The plaintiff, Zhengli Marine Engineering Co., Ltd., seeks an order requiring Defendant 1, Longyuan Zhenhua Co., Ltd., to pay construction costs of RMB 87,765,000 plus interest; and seeks an order requiring Defendant 2, Qujie Wind Power Co., Ltd., to bear joint and several liability for the construction costs of RMB 81,000,000 plus interest that Defendant 1, Longyuan Zhenhua Co., Ltd., is required to pay to the plaintiff, Zhengli Marine Engineering Co., Ltd., under the first claim.instance was received, ruling in favour of the defendant, Qu Jie Wind Power Company. Longyuan Zhenhua Company, dissatisfied with the judgment of the court of first instance, lodged an appeal on 4 June 2026.
On 16 October 2021, Gaotang Shihui Company and Shengshi Longhong Power Co., Ltd. (hereinafter referred to as ‘Longhong Company’) entered into the ‘EPC Contract for the 47.3 MW Distributed Photovoltaic Project of Gaotang Shihui New Energy Co., Ltd.’ (hereinafter referred to as the ‘EPC Contract’). To ensure the fulfilment of Longhong Company’s performance obligations under the ‘EPC Contract’, Longhong Company, in accordance with the terms of the ‘EPC Contract’, applied to the Yubei Sub-branch of the China Construction Bank to issue an independent letter of guarantee in favour of Gaotang Shihui Company, valid for three years and payable on demand, with a guarantee amount of 34 million yuan, valid from 26 April 2023 to 26 April 2026.On 17 April 2026, Gaotang Shihui Company, considering that Longhong Company had breached the EPC Contract, formally submitted a complete set of claim documents to the Yubei Branch of the China Construction Bank in accordance with the terms of the guarantee, requesting the bank to pay the sum of 34 million yuan under the guarantee. As of the payment deadline stipulated in the guarantee, namely 28 April 2026, the Yubei Branch of the China Construction Bank had still not paid any sum to Gaotang Shihui Company.Chongqing Xingnong Financing Guarantee Group Co., Ltd. (hereinafter referred to as ‘Chongqing Xingnong Guarantee Company’), as the counter-guarantor of this performance bond, filed a civil statement of claim with the Chongqing Liangjiang New Area People’s Court, naming Shihui Company3,400.00NoThe court hearing will take place on 8 July 2026.Not yet possible to predict the outcome of the proceedings or their implications.No
as the defendant and the Yubei Branch of the China Construction Bank as the third party, on the grounds of fraud relating to the independent performance bond. The claims sought were as follows: 1. A declaration that the claim made under the ‘Performance Bond’ constitutes bond fraud; 2. a request for a ruling, in accordance with the law, that the Chongqing Yubei Sub-branch suspend payment under the ‘Performance Guarantee’; 3. a request for a judgement ordering Shihui Company to bear the litigation costs in this case.

IX. Penalty and rectification

□ Applicable √ Not applicable

During the reporting period, the Company had no Penalty and rectification.

X. Integrity of the company and its controlling shareholders and actual controllers

□ Applicable √ Not applicable

XI. Material related transactions

1. Related transactions in connection with daily operation

<sup></sup>Applicable □Not applicable

The related transactions to the company's daily operations that occurred during the reporting period are detailed in "7. Other Major Related Transactions".

2. Related-party transactions arising from asset acquisition or sale

□Applicable √ Not applicable

No such cases in the reporting period.

3. Related party transactions of joint outbound investment

<sup></sup>Applicable □Not applicable

The related transactions to the company's daily operations that occurred during the reporting period are detailed in "7. Other Major Related Transactions".

4. Credits and liabilities with related parties

□Applicable √ Not applicable

No non-operational contact of related liability or debts in Period

5. Transactions with related finance company, especially one that is controlled by the Company

√ Applicable □Not applicable

Deposit business

Related partyRelationshipMaximum daily deposit limitd(Ten thousand yuan)Deposit interest rate rangeBeginning balance(Ten thousand yuan)The amount incurredEnding balance(Ten thousand yuan)
Total deposit amount of the current period (Ten thousand yuan)Total amount withdrawn in the current period (Ten thousand yuan)
Guangdong Energy Group Finance Co., Ltd.Controlled by Guangdong Energy Group Co., Ltd.2,000,0000.05%-1%1,325,4665,503,4375,403,6381,425,265

Loan business

Related partyRelationshipLoan limit((Ten thousand yuan)Loant interest rate rangeBeginning balance((Ten thousand yuan)The amount of this periodEnding balance((Ten thousand yuan)
Total loan amount of the currentperiod(Ten thousand yuan)Total repayment amount ofthe current period(Ten thousand yuan)
Guangdong Energy Group Finance Co., Ltd.Controlled by Guangdong Energy Group Co., Ltd.4,000,0001.92%-2.92%1,142,73883,93564,6701,162,003

Credit extension or other financial services

Related partyRelationshipBusiness typeTotal amount(Ten thousand yuan)Actual amount incurred(Ten thousand yuan)
Guangdong Communications Group Finance Co., LtdControlled by the same parent companyCredit extension4,000,0001,162,003

6. Transactions with related finance company controlled by the Company

 Applicable √ Not applicable

A non-controlled financial company of the company.

7. Other significant related-party transactions

√ Applicable □Not applicable

(1). On January 21,2026, the 9th meeting of the 11th Board of Directors of the company reviewed and passed the "Proposal on Daily Connected Transactions between the Company and Guangdong Energy Group Co., Ltd. in 2026", and this connected transaction matter was reviewed and approved for implementation by the company's first extraordinary general meeting of shareholders in 2026.

(2). On January 21, 2026, the 9th meeting of the 11th Board of Directors of the company reviewed and passed the "Proposal on Signing the 'Financial Services Framework Agreement' with Guangdong Energy Group Finance Co., Ltd.",and the "Proposal on Signing the 'Financing Leasing Cooperation Framework Agreement' with Guangdong Energy Financing Leasing Co., Ltd." The above-mentioned connected transaction matters were reviewed and approved for implementation by the company's first extraordinary general meeting of shareholders in 2026.

(3)On June 5,2026, the 12th meeting of the 11th Board of Directors of the company reviewed and passed the " Proposal on the Investment and Construction of the Zhuhai Fushan 200MW/400MWh Independent Energy Storage Power Station Project". Zhuhai Yudean New Energy Co., Ltd. shall act as the investment entity to invest in and construct the Zhuhai Fushan 200MW/400MWh Independent Energy Storage Power Station Project. The total investment of the project is 424.42 million yuan, with the capital set at 20% of the total investment, amounting to 84.884 million yuan, After the capital increase and share expansion, the equity structure of Zhuhai Yudean New Energy Co., Ltd. will be: Guangdong Yudean New Energy Development Co., Ltd. holds 51% of the shares, and Guangdong Energy Storage Industry Development Co., Ltd. holds 49% of the shares.

Website for temporary disclosure of the connected transaction

AnnouncementDate of disclosureWebsite for disclosure
Expected Announcement of Daily Connected Party Transactions in 2026January 23,2026http://www.cninfo.com.cn.
Financial Services Framework Agreement < Financial Leasing Cooperation Framework Agreement > and Related Transaction AnnouncementJanuary 23,2026http://www.cninfo.com.cn.
Resolutions of the 12th Meeting of the Eleventh Board of DirectorsJune 6, 2026http://www.cninfo.com.cn.

XII. Significant contracts and execution

1.Entrustments, contracting and leasing

(1)Entrustment

√ Applicable □Not applicable

Statement of Trusteeship Situation :

According to the statement of Guangdong Energy Group on fulfilling relevant matters, and to avoid the horizontal competition and fulfill the relevant commitment of the horizontal competition, the Company signed Stock Trusteeship Agreementwith Guangdong Energy Group, wherein the shareholder's rights within the trusteeship range, except the ownership, right of earning and right of disposition, will be trusted to the Company, The custody fee collected from each company directly holding the first-class target of Guangdong Energy Group is RMB 100,000/year; The custody fee collected from each company indirectly holding the secondary target is RMB 50,000/year.published by the Company in China Securities Daily, Securities Times and http://www.cninfo.com.cn on January 13, 2018(Announcement No.2018-04). In the first half of 2026, the Company confirmed a custody income of RMB 900,000.

Gains/losses to the Company from projects that reached over 10% in total profit of the Company in reporting period

□Applicable √ Not applicable

No gains or losses to the Company from projects that reached over 10% in total profit of the Company in reporting period

(2) Contract

□ Applicable √ Not applicable

No any contract for the Company in the reporting period.

(3) Lease

□ Applicable √ Not applicable

Note

As the lessee, the company has incurred a rental fee of RMB 13.12 million in the first half of 2026,

Project which generates profit or loss reaching over 10% of total profits of the Company during the Reporting Period

□ Applicable √ Not applicable

There were no leases with a 10% or greater impact on the Company’s gross profit in the Reporting Period.

Guarantee of the Company for the controlling subsidiaries (Exclude controlled subsidiaries)
Name of the CompanyRelevant disclosure date/No. of the guaranteed amountAmount of GuaranteeDate of happening (Date of signing agreement)Actual mount of guaranteeGuarantee typeGuaranty (If any)Counter-guarantee (If any)Guarantee termComplete implementation or notGuarantee for associated parties (Yes or no)
Guangdong Energy Group Co., Ltd.October29,2020200,000November 19,2020163,152Guaranteeing of joint liabilities.NoGuangdong Yudean Yangjiang Offshore wind power Co., Ltd. provides joint and several liability guarantee counter-guaranteeTwo ortwo years after the expiration of the loan agreementNoYes
Total amount of approved external guarantee in the report period(A1)0Total actually amount of external guarantee in the report period(A2)-5,264
Total amount of approved external guarantee at the end of the report period(A3)425,459Total actually amount of external guarantee at the end of the report period(A4)163,152
Guarantee of the company for its subsidiaries
Name of the CompanyRelevant disclosure date/No. of the guaranteed amountAmount of GuaranteeDate of happening (Date of signing agreement)Actual mount of guaranteeGuarantee typeGuaranty (If any)Counter-guarantee (If any)Guarantee termComplete implementation or notGuarantee for associated parties (Yes or no)
Total of guarantee for subsidiaries approved in the period(B1)0Total of actual guarantee for subsidiaries in the period (B2)-60,000
Total of guarantee for subsidiaries approved at period-end(B3)300,000Total of actual guarantee for subsidiaries at period-end(B4)0
Guarantee of the subsidiaries for the controlling subsidiaries
Name of the CompanyRelevant disclosure date/No. of the guaranteed amountAmount of GuaranteeDate of happening (Date of signing agreement)Actual mount of guaranteeGuarantee typeGuaranty (If any)Counter-guarantee (If any)Guarantee termComplete implementation or notGuarantee for associated parties (Yes or no)
Total of guarantee for subsidiaries approved in the period(C1)0Total of actual guarantee for subsidiaries in the period (C2)0
Total of guarantee for subsidiaries approved at period-end(C3)0Total of actual guarantee for subsidiaries at period-end(C4)0
The Company's total guarantee(i.e.total of the first three main items)
Total guarantee quota approved in the reporting period (A1+B1+C1)0Total amount of guarantee actually incurred in the reporting period (A2+B2+C2)-65,264
Total guarantee quota already approved at the end of the reporting period (A3+B3+C3)725,459Total balance of the actual guarantee at the end of the reporting period (A4+B4+C4)163,152
The proportion of the total amount of actually guarantee in the net assets of the Company (that is A4+B4+C4) %7.17%
Including:
Amount of guarantees provided for shareholders, the actual controller and their related parties (D)163,152
Amount of debt guarantees provided directly or indirectly for entities with a liability-to-asset ratio over 70% (E)163,152
Proportion of total amount of guarantee in net assets of the company exceed 50% (F)0
Total amount of the three kinds of guarantees above (D+E+F)163,152

Explanation on guarantee with composite way:

Not applicable

3. Finance management on commission

□Applicable √ Not applicable

No such cases in the reporting period.

4. Other material contracts

□ Applicable √ Not applicable

No other material contracts in the period.

XIII.Particulars about researches, visits and interviews received in this reporting period √ Applicable □Not applicable

Reception timePlace of receptionWay of receptionTypes of visitorsVisitors receivedMain contents discussed and information providedBasic index
January 30,2026Meeting room on the 35th floor of the CompanyField researchOrganizationGao Ziming, Zhang Zhuoran from Guosheng Securities; Sun Yicheng from Jiashi Fund; Sima Chaoyang form Penghua Fund; Wei Wei from CPICPlease refer to the investor activity record form for details of the discussion. No information is provided by the CompanySee details on the Interactive Exchange platform.
February 10,2026Meeting room on the 35th floor of the CompanyField researchOrganizationZeng Panshui from Guotai Fund; Xue Yang From Fuguo FundPlease refer to the investor activity record form for details of the discussion. No information is provided by the CompanySee details on the Interactive Exchange platform.
April 14,2026Meeting room on the 33rd floor of the CompanyField researchOrganizationYanshi Guotai Haitong; Jiang Tao from Sinolink Securities; Rong Lingqi from Guangfa Securities; Liu Yahui From Changjiang Securities; Wang Lu From Shenwan Hongyuan; Deng Siping from Huayuan Public Utilities; Song Yingyingfrom China Merchants Securities;Qiu Jichun from CITIC Securities; Huang Bo from Huatai Securities; Sun Yixuan, Jiang Shan From Orient Securities;Yang Peng From Dehui Investment; Wang Runqing Jincan FundPlease refer to the investor activity record form for details of the discussion. No information is provided by the CompanySee details on the Interactive Exchange platform.
April 16,2026Online communicationOnline communication via internet platformsIndividualInvestors who participated in the Company's performance briefing through the panoramic network platformPlease refer to the investor activity record form for details of the discussion. No information is provided by the CompanySee details on the Interactive Exchange platform.
May 18,2026Meeting room on the 35th floor of the CompanyField researchOrganizationCai YI, ZhuLixian from Industrial Securities; Gao Xing from Chia Securities; Huang Bo from Huatai Securities; Zhong Qi from Guohai Securities; Cui Jiacheng from Guosen SecuritiesPlease refer to the investor activity record form for details of the discussion. No information is provided by the CompanySee details on the Interactive Exchange platform.
May 22,2026Online communicationOnline communication via internet platformsIndividualInvestorsPlease refer to the investor activity record form for details of the discussion. No information is provided by the CompanySee details on the Interactive Exchange platform.
May 29,2026Wuhan China Optics Valley Science and Technology Exhibition CenterField researchOrganizationSong Shangqian from Changjiang Securities; Zhang Chenjiefrom Guotai Haitong; Wu Shu from ICBC UBS Asset Management Co., Ltd.; Huang Hai from Hongde FundPlease refer to the investor activity record form for details of thediscussion. No information is provided by the CompanySee details on the Interactive Exchange platform.

XIV. Explanation on other significant events

□ Applicable Not applicable

XV. Significant event of subsidiary of the Company

Applicable □ Not applicable

Summary of Material MattersDisclosure DateWebsite Search Index
Pursuant to the Letter on Issuing the Work Plan for the Decommissioning of Shajiao Power Plant and Construction of Alternative Power Sources (No. 578〔2018〕Yue Fa Gai Neng Dian Letter) and the Letter on Issuing the Work Plan for Promoting the Decommissioning of Shajiao Power Plant and Construction of Alternative Power Sources (No. 1537〔2019〕Yue Fa Gai Neng Yuan Letter) issued by the Development and Reform Commission of Guangdong Province (for details, please refer to the Company's Announcements No. 2018-12 and No. 2019-21), the three generating units of the 3×660 MW coal-fired power generation project of Shajiao C Power Plant operated by Guangdong Guanghe Power Co., Ltd., an indirectly held subsidiary of Guangdong Electric Power Development Co., Ltd. (hereinafter referred to as the “Company”), were shut down in phases in an orderly manner on 31 December 2025. As of the first three quarters of 2025, the Company had a total controlling installed capacity of 40,559,300 kW, of which Shajiao C Power Plant accounted for 1.98 million kW, representing 4.88% of the Company's controlling installed capacity.Announcement on Voluntary Information Disclosure by Guangdong Electric Power Development Co., Ltd. on the Shutdown of Shajiao C Power PlantJanuary 5,2026http://www.cninfo.com.cn
On February 11, 2026, the Unit 6 of the expansion project (2×1000MW) for Units 5 and 6 at Huilai Power Plant, invested and built by Guangdong YudeanJinghai Power Co., Ltd., a subsidiary of Guangdong Electric Power Development Co., Ltd., passed a 168-hour full-load trial run and successfully connected to the grid, officially starting commercial operation.Announcement on Voluntary Information Disclosure by Guangdong Electric Power Development Co., Ltd. in Respect of the Commissioning of the Expansion Project (2×1000 MW) for Units 5 and 6 of Huilai Power PlantFebruary 12,2026http://www.cninfo.com.cn
2 On February 2, 2026, the No. 4 unit of the Maoming Bohe Power Plant 2×1000 MW Units Project for Units 3 and 4 (the "Project"), invested and built by Guangdong Power Development Co., Ltd. (hereinafter referred to as "the Company")'s controlling subsidiary Guangdong Yudean Bohe Energy Co., Ltd., successfully completed 168 hours of full-load trial operation and was connected to the grid, officially starting commercial operation.Announcement on Voluntary Information Disclosure by Guangdong Electric Power Development Co., Ltd. in Respect of the Commissioning of the Maoming Bohe Power Plant 2×1000 MW Units Project for Units 3 and 4February 3,2026http://www.cninfo.com.cn

VI. Change of share capital and shareholding of Principal Shareholders

I. Changes in share capital

1. Changes in share capital

In shares

Before the changeIncrease/decrease (+, -)After the Change
AmountProportionShare allotmentBonus sharesCapitalization of common reserve fundOtherSubtotalQuantityProportion
I. Share with conditional subscription1,896,489,08736.12%1,896,489,08736.12%
1. State-owned shares0
2. State-owned legal person shares1,893,342,62136.06%1,893,342,62136.06%
3. Other domestic shares3,146,4660.06%3,146,4660.06%
Of which: Domestic legal person shares3,146,4660.06%3,146,4660.06%
Domestic natural person shares00%00%
4. Foreign shares00
Of which: Foreign legal person shares00
Foreign natural person shares00
II. Shares with unconditional subscription3,353,794,89963.88%3,353,794,89963.88%
1. Common shares in RMB2,555,386,89948.67%2,555,386,89948.67%
2. Foreign shares in domestic market798,408,00015.21%798,408,00015.21%
3. Foreign shares in foreign market00
4. Other
III. Total of capital shares5,250,283,986100%5,250,283,986100%

Reasons for share changed

□Applicable √Not applicable

Approval of Change of Shares

□Applicable √Not applicable

Ownership transfer of share changes

□Applicable √Not applicable

Progress on any share repurchase:

□ Applicable √ Not applicable

Progress on reducing the repurchased shares by means of centralized bidding:

□ Applicable √ Not applicable

Influence on the basic EPS and diluted EPS as well as other financial indexes of net assets per share attributable to common shareholders of Company in latest year and period

□ Applicable √ Not applicable

Other information necessary to disclose for the company or need to disclosed under requirement from security regulators

□ Applicable √Not applicable

2. Change of shares with limited sales condition

□ Applicable √Not applicable

II. Securities issue and listing

□ Applicable √Not applicable

III. Number of shareholders and shareholding

In Shares

Total number of common shareholders at the end of the reporting period188,248Total number of preferred shareholders that had restored the voting right at the end of the reporting period (if any) (note 8)0
Particulars about shares held above 5% by shareholders or top ten shareholders(Excludes shares lent through refinancing)
ShareholdersNature of shareholderProportion of shares held (%)Number of shares held at period - endChanges in reporting periodAmount of restricted shares heldAmount of un- restricted shares heldNumber of share pledged/frozen
State of shareAmount
Guangdong Energy Group Co., Ltd.State-owned legal person65.74%3,451,556,619-86,560,3021,893,342,6211,558,213,998Pledge902,262,089
Guangdong Electric Power Development CorporationState-owned legal person1.80%94,367,3410094,367,341Not applicable0
Guangzhou Development Group Co., Ltd.State-owned legal person1.36%71,151,542-45,542,060071,151,542Not applicable0
Zheng JianxiangDomestic Natural person0.51%26,859,3000026,859,300Not applicable0
HKSCCOverseas Legalperson0.38%19,764,24011,033,534019,764,240Not applicable0
CHINA INTERNATIONAL CAPITAL CORPORATION HONG KONG SECURITIES LTDOverseas Legal person0.29%15,216,0660015,216,066Not applicable0
VANGUARD TOTAL INTERNATIONAL STOCK INDEX FUNDOverseas Legal person0.28%14,620,5120014,620,512Not applicable0
NOMURA SINGAPORE LIMITEDOverseas Legal person0.24%12,599,8430012,599,843Not applicable0
Chaokang Investment Co., Ltd.Overseas Legal person0.22%11,656,6770011,656,677Not applicable0
Zhou ZhengDomestic Natural person0.21%10,812,7950010,812,795Not applicable0
Strategy investors or general legal person becomes top 10 shareholders due to rights issued (if applicable) (See Notes 3)Not applicable
Explanation on associated relationship among the aforesaid shareholdersThe second largest shareholder Guangdong Electric Power Development Corporation And the ninth largest shareholder Chaokang Investment Co., Ltd. Are the wholly-owned subsidiaries of the largest shareholder Energy Group. These three companies have relationships; whether the other shareholders have relationships or unanimous acting was unknown
Above shareholders entrusting or entrusted with voting rights, or waiving voting rightsNot applicable
Top 10 shareholders including the special account for repurchase (if any) (see note 11)Not applicable
Shareholding of top 10 shareholders of unrestricted shares(Excluding shares lent through refinancing and Top management lock-in stock)
Name of the shareholderQuantity of unrestricted shares held at the end of the reporting periodShare type
Share typeQuantity
Guangdong Energy Group Co., Ltd.1,558,213,998RMB Common shares1,558,213,998
Guangdong Electric Power Development Corporation94,367,341RMB Common shares94,367,341
Guangzhou Development Group Co., Ltd.71,151,542RMB Common shares71,151,542
Zheng Jianxiang26,859,300Foreign shares placed in domestic exchange26,859,300
HKSCC19,764,240RMB Common shares19,764,240
CHINA INTERNATIONAL CAPITAL CORPORATION HONG KONG SECURITIES LTD15,216,066Foreign shares placed in domestic exchange15,216,066
VANGUARD TOTAL INTERNATIONAL STOCK INDEX FUND14,620,512Foreign shares placed in domestic exchange14,620,512
NOMURA SINGAPORE LIMITED12,599,843Foreign shares placed in domestic exchange12,599,843
Chaokang Investment Co., Ltd.11,656,677Foreign shares placed in domestic exchange11,656,677
Zhou Zheng10,812,795Foreign shares placed in domestic exchange10,812,795
Explanation on associated relationship or consistent action among the top 10 shareholders of non-restricted negotiable shares and that between the top 10 shareholders of non-restricted negotiable shares and top 10 shareholdersThe Second largest shareholder Guangdong Electric Power Development Corporation And the ninth largest shareholder Chaokang Investment Co., Ltd. Are the wholly-owned subsidiaries of the largest shareholder Energy Group. These three companies have relationships; whether the other shareholders have relationships or unanimous acting was unknown
Explanation on shareholders participating in the margin trading business(if any )(See Notes 4)Not applicable

Information of shareholders holding more than 5% of the shares, the top 10 shareholders and the top 10 shareholders of unrestricted tradable shares participating in the lending of shares in securities lending and borrowing business □Applicable <sup></sup>Not applicable

The top 10 shareholders and the top 10 shareholders of unrestricted tradable shares have changed compared with the previous period due to the securities lending/returning,

□ Applicable √ Not applicable

Whether top ten common shareholders or top ten common shareholders with un-restrict shares held have a buyback agreement dealing in reporting period.

□ Yes √ No

The top ten common shareholders or top ten common shareholders with un-restrict shares held of the Company have no buy –back agreement dealing in reporting period.

IV. Changes in shareholdings of directors, supervisors and executive officers

□ Applicable √ Not applicable

Shares held by directors, supervisors and senior executives have no changes in reporting period, found more details in Annual Report 2025.

V. Changes in controlling shareholders or actual controllers

Change of controlling shareholder during the reporting period

□Applicable<sup></sup>Not applicable

The Company had no change of controlling shareholder during the reporting period

Change of actual controller during the reporting period

□Applicable<sup></sup>Not applicable

The Company had no change of actual controller during the reporting period

VI. Preferred stock

□Applicable<sup></sup>Not applicable

The Company had no preferred stock in the Period.

VII. Corporate Bond

<sup></sup>Applicable □Not applicable

I. Enterprise bond

□ Applicable √ Not applicable

No such cases in the reporting period.

II. Corporate bond

√ Applicable □ Not applicable

I. Basic information of corporate bonds

In RMB 10,000

Bond nameBond short nameBond codeIssue dayValue dateDue dayBond balanceInterest rateServicing wayTrading
Public Issuance of Corporate Bonds to Professional Investors in 2021 (Phase I) of Guandong Electric Power Development Co.,Ltd.21Yedean 03149711.SZNovember 23,2021November 24, 2021November 24, 202680,0003.41%Using simple interest rate on a yearly basis, regardless of compound interest. Due payments once a year, maturing debt at a time. In the final phase, interest is paid together with the principal redemption.Shenzhen Stock Exchange
During the reporting period, interest payment situation of the company bonds (If any)21 Yudean 03 is bonds for professional investors
Applicable trading mechanismMatching transaction, click transaction, inquiry transaction, bidding transaction, negotiation transaction
Whether there are risks and countermeasures for terminating listing transactions (If any)No

Overdue and outstanding bonds

□ Applicable √ Not applicable

1. Debt financing instruments of non-financial enterprises In RMB10,000 Bond name Bond short name Bond code Issue day Value date Due day Bond balance Interest rate Servicing way Trading 2022 MTN (Phase I) of Guangdong Electric Power Development Co., Ltd. 22Yudean Fa MTN001 102281929.IB August 24,2022 August 26,2022 August 26,2027 60,000 2.9% Using simple interest rate on a yearly basis, regardless of compound interest. Due payments once a year, maturing debt at a time. In the final phase, interest is paid together with the principal redemption. Interbank market 2023 MTN (Phase I) of Guangdong Electric Power Development Co., Ltd.

2.. Trigger and implementation of option clauses and investor protection clauses of the issuer or investor

□ Applicable √ Not applicable

3.Adjustment of credit rating results during the reporting period

□ Applicable √ Not applicable

4. The implementation and changes of guarantee, debt repayment plan and other debt repayment guarantee measures during the reporting period and their impact on the rights and interests of bond investors

□ Applicable √ Not applicable

III. Debt financing instruments of non-financial enterprises

√ Applicable □ Not applicable

1. Debt financing instruments of non-financial enterprises

In RMB10,000

Bond nameBond short nameBond codeIssue dayValue dateDue dayBond balanceInterest rateServicing wayTrading
2022 MTN (Phase I) of Guangdong Electric Power Development Co., Ltd.22Yudean Fa MTN001102281929.IBAugust 24,2022August 26,2022August 26,202760,0002.9%Using simple interest rate on a yearly basis, regardless of compound interest. Due payments once a year, maturing debt at a time. In the final phase, interest is paid together with the principal redemption.Interbank market
2023 MTN (Phase I) of Guangdong Electric Power Development Co., Ltd.23Yudean Fa MTN001102380558.IBMarch 15,2023March 17,2023March 17,2028160,0003.35%Using simple interest rate on a yearly basis, regardless of compound interest. Due payments once a year, maturing debt at a time. In the final phase, interest is paidtogether with the principal redemption.Interbank market
2024 MTN (Phase I) of Guangdong Electric Power Development Co., Ltd.24 Yudean Fa MTN001102482034.IBMay 22,2024May 24,2024May 24,2029100,0002.41%Using simple interest rate on a yearly basis, regardless of compound interest. Due payments once a year, maturing debt at a time. In the final phase, interest is paid together with the principal redemption.Interbank market
2024 MTN (Phase II) of Guangdong Electric Power Development Co., Ltd.24 Yudean Fa MTN002102483012.IBJuly 11,2024July 15,2024July 15,2034150,0002.54%Using simple interest rate on a yearly basis, regardless of compound interest. Due payments once a year, maturing debt at a time. In the final phase, interest is paid together with the principal redemption.Interbank market
2024 MTN (Phase III) of Guangdong Electric Power Development Co., Ltd.24 Yudean Fa MTN003102484007.IBSeptember 9,2024September 11,2024September 11,203960,0002.52%Using simple interest rate on a yearly basis, regardless of compound interest. Due payments once a year, maturing debt at a time. In the final phase, interest is paid together with the principal redemption.Interbank market
2024 MTN (Phase IV) of Guangdong Electric Power Development Co., Ltd. Variety 124 Yudean Fa MTN004A102400984.IBOctober 11,2024October 14, 2024October 14,2029100,0002.47%Using simple interest rate on a yearly basis, regardless of compound interest. Due payments once a year, maturing debt at a time. In the final phase, interest is paid together with the principal redemption.Interbank market
2024 MTN (Phase IV) of Guangdong Electric Power Development Co., Ltd. Variety 2)24 Yudean Fa MTN004B102400985.IBOctober 11,2024October 14, 2024October 14,203950,0002.7%Using simple interest rate on a yearly basis, regardless of compound interest. Due payments once a year, maturing debt at a time. In the final phase, interest is paid together with the principal redemption.Interbank market
2024 MTN (Phase V) of Guangdong Electric Power Development Co., Ltd.24 Yudean Fa MTN005102484558.IBOctober 22,2024October 24,2024October 24,2039100,0002.7%Using simple interest rate on a yearly basis, regardless of compound interest. Due payments once a year, maturing debt at a time. In the final phase, interest is paid together with the principal redemption.Interbank market
2024 MTN (Phase VI) of Guangdong Electric Power Development Co., Ltd. Variety 1)24 Yudean Fa MTN006A102401037.IBNovember 11,2024November 13, 2024November 13, 202980,0002.37%Using simple interest rate on a yearly basis, regardless of compound interest. Due payments once a year, maturing debt at a time. In the final phase, interest is paid together with the principal redemption.Interbank market
2024 MTN (Phase VI) of Guangdong Electric Power Development Co., Ltd. Variety 2)24Yudean Fa MTN006B102401038.IBNovember 11,2024November 13,2024November 13,2039100,0002.67%Using simple interest rate on a yearly basis, regardless of compound interest. Due payments once a year, maturing debt at a time. In the final phase, interest is paidInterbank market
2025 MTN (Phase I) of Guangdong Electric Power Development Co., Ltd25 Yudean Fa MIN001102582339.IBJune 9,2025June 11,2025June 11,203550,0002.18%Using simple interest rate on a yearly basis, regardless of compound interest. Due payments once a year, maturing debt at a time. In the final phase, interest is paid together with the principal redemption.Interbank market
2025 MTN (Phase II) of Guangdong Electric Power Development Co., Ltd25 Yudean Fa MIN002102501586.IBSeptember 11,2025September 15,2025September 15,203080,0002.2%Using simple interest rate on a yearly basis, regardless of compound interest. Due payments once a year, maturing debt at a time. In the final phase, interest is paid together with the principal redemption.Interbank market
2025 MTN (Phase III) of Guangdong Electric Power Development Co., Ltd25 Yudean Fa MIN003102584320.IBOctober 17,2025October 21,2025October 21,203090,0002.18%Using simple interest rate on a yearly basis, regardless of compound interest. Due payments once a year, maturing debt at a time. In the final phase, interest is paid together with the principal redemption.Interbank market
2026 MTN (Phase I) of Guangdong Electric Power Development Co., Ltd (M & A)26 Yudean Fa MTN001(M & A)102681477.IBApril 16,2026April 20,2026April 20,203190,0001.83%Using simple interest rate on a yearly basis, regardless of compound interest. Due payments once a year, maturing debt at a time. In the final phase, interest is paid together with the principal redemption.Interbank market
During the reporting period, interest payment situation of the company bonds (If any)N/A
Applicable trading mechanismCirculation and transfer in the national inter-bank bond market, its listing and circulation will be carried out in accordance with the relevant regulations promulgate d by the National Interbank Funding Center
Whether there are risks and countermeasures for terminating listing transactions (If any)No

Overdue and unpaid bonds

□ Applicable √ Not applicable

2. Trigger and implementation of option clauses and investor protection clauses of the issuer or investor

□ Applicable √ Not applicable

3.Adjustment of credit rating results during the reporting period

□ Applicable √ Not applicable

4.The implementation and changes of guarantee, debt repayment plan and other debt repayment guarantee measures during the reporting period and their impact on the rights and interests of bond investors

□ Applicable √ Not applicable

IV. Convertible bond

□ Applicable √ Not applicable

No such cases in the reporting period

V. The loss within the scope of consolidated statements in the reporting period exceeded 10% of the net assets at the end of the previous year

□ Applicable √ Not applicable

VI. Main accounting data and financial indicators of the Company in recent two years by the end of the reporting period

In RMB10,000

ItemAt the end of the reporting periodAt the end of last yearAt the same time rate of change
Current ratio0.670.670%
Debt ratio77.53%77.71%-0.18%
Quick ratio0.520.54-3.70%
Amount of this periodAmount of last periodAt the same time rate of change
Net profit after deducting non-recurring profit and loss-83,868454-18,573.13%
EBITDA total debt ratio3.05%3.26%-0.21%
Time interest earned ratio0.511-49%
Cash interest guarantee times4.52.9751.52%
EBITDATime interest earned ratio3.373.244.01%
Repayment of debt (%)100%100%0%
Payment of interest (%)100%100%0%

VIII. Financial Report

I. Audit report

Has this semi-annual report been audited?

□ Yes √ No

The semi-annual financial report has not been audited.

II. Financial statements

Currency unit for the statements in the notes to these financial statements: RMB

1. Consolidated balance sheet

Prepared by:Guangdong Electric Power Development Co., Ltd. June 30,2026

In RMB

ItemJune 30,2026January 1, 2026
Current asset:
Monetary fund15,856,225,09314,839,620,180
Settlement provision00
Outgoing call loan00
Transactional financial assets00
Derivative financial assets00
Notes receivable700,0000
Account receivable10,468,942,6649,583,184,905
Financing of receivables00
Prepayments1,723,383,482974,124,953
Insurance receivable00
Reinsurance receivable00
Provisions of Reinsurance contracts receivable00
Other account receivable704,398,419527,513,970
Including: Interest receivable00
Dividend receivable195,124,9640
Repurchasing of financial assets00
Inventories3,934,096,8062,293,819,795
Including: Data resources00
Contract assets230,219899,846
Assets held for sales00
Non-current asset due within 1 year00
Other current asset2,354,486,2882,428,213,159
Total of current assets35,042,462,97130,647,376,808
Non-current assets:
Loans and payment on other's behalf disbursed00
Creditor's right investment00
Other investment on bonds00
Long-term receivable00
Long term share equity investment11,784,474,41711,543,456,219
Other equity instruments investment2,857,534,8643,009,689,888
Other non-current financial assets00
Property investment319,678,959323,777,484
Fixed assets101,009,972,68185,896,557,515
Construction in progress15,289,675,04231,582,478,170
Production physical assets00
Oil & gas assets00
Use right assets10,832,326,07711,196,458,460
Intangible assets3,602,647,9073,699,548,596
Including: Data resources00
Development expenses00
Including: Data resources00
Goodwill2,449,8862,449,886
Long-germ expenses to be amortized58,500,83062,228,755
Deferred income tax asset1,009,516,374959,061,443
Other non-current asset7,083,835,3747,111,168,050
Total of non-current assets153,850,612,411155,386,874,466
Total of assets188,893,075,382186,034,251,274
Current liabilities
Short-term loans9,830,784,4949,741,011,157
Loan from Central Bank00
Borrowing funds00
Transactional financial liabilities00
Derivative financial liabilities00
Notes payable2,732,162,5251,519,972,657
Account payable8,278,151,2314,294,766,903
Advance receipts64,838,14867,892,003
Contract liabilities88,346,55677,103,302
Selling of repurchased financial assets00
Deposit taking and interbank deposit00
Entrusted trading of securities00
Entrusted selling of securities00
Employees' wage payable884,444,555592,492,474
Tax payable250,171,435311,343,314
Other account payable17,335,490,30418,806,427,609
Including: Interest payable00
Dividend payable105,171,5550
Fees and commissions payable00
Reinsurance fee payable00
Liabilities held for sales00
Non-current liability due within 1 year11,877,481,2849,886,200,377
Other current liability635,996,024520,439,919
Total of current liability51,977,866,55645,817,649,715
Non-current liabilities:
Reserve fund for insurance contracts00
Long-term loan67,432,289,33871,609,414,544
Bond payable12,683,561,34812,382,296,595
Including: preferred stock00
Sustainable debt00
Lease liability12,109,264,25112,394,114,636
Long-term payable968,819,4181,109,330,338
Long-term remuneration payable to staff561,055,072592,113,141
Expected liabilities00
Deferred income180,997,422141,794,312
Deferred income tax liability525,122,735523,854,149
Other non-current liabilities1,028,1671,028,167
Total non-current liabilities94,462,137,75198,753,945,882
Total of liability146,440,004,307144,571,595,597
Owners' equity
Share capital5,250,283,9865,250,283,986
Other equity instruments00
Including: preferred stock00
Sustainable debt00
Capital reserves5,039,493,7795,028,330,125
Less: Shares in stock00
Other comprehensive income1,418,748,9321,533,837,247
Special reserve154,439,05990,467,033
Surplus reserves8,903,515,1358,903,515,135
Common risk provision00
Retained profit1,987,136,6062,637,923,692
Total of owner's equity belong to the parent company22,753,617,49723,444,357,218
Minority shareholders' equity19,699,453,57818,018,298,459
Total of owners' equity42,453,071,07541,462,655,677
Total of liabilities and owners' equity188,893,075,382186,034,251,274

Legal representative :Zheng Yunpengn Person-in-charge of the accounting work:Liu Wei

Person-in -charge of the accounting organ:Meng Fei

2.Parent Company Balance Sheet

In RMB

ItemJune 30,2026January 1,2026
Current asset:
Monetary fund648,835,318764,421,673
Transactional financial assets00
Derivative financial assets00
Notes receivable00
Account receivable00
Financing of receivables00
Prepayments32,721,56933,136,661
Other account receivable268,870,94270,195,880
Including: Interest receivable00
Dividend receivable195,124,9640
Inventories4,282,4004,371,073
Including: Data resources00
Contractual assets00
Assets held for sale00
Non-current asset due within one year00
Other current assets3,036,8502,183,422
Total current assets957,747,079874,308,709
Non-current assets:
Debt investment00
Other debt investment00
Long-term account receivable197,765,867195,555,835
Long-term equity investment51,571,650,52850,908,455,350
Investment in other equity instrument2,857,273,0423,009,428,066
Other non-current financial assets1,000,0001,000,000
Investment real estate2,894,0573,211,856
Fixed assets151,476,020155,838,530
Construction in progress12,704,2049,517,518
Productive biological asset00
Oil and gas asset00
Right-of-use assets13,480,47216,988,825
Intangible assets62,737,62265,316,066
Including: Data resources00
Development expenses00
Including: Data resources00
Goodwill00
Long-germ expenses to be amortized684,218859,478
Deferred income tax asset00
Other non-current asset615,767615,758
Total of non-current assets54,872,281,79754,366,787,282
Total of assets55,830,028,87655,241,095,991
Current liabilities
Short-term loans1,801,055,2781,400,905,972
Transactional financial liabilities00
Derivative financial liabilities00
Notes payable00
Account payable1,018,2121,695,429
Advance receipts00
Contract Liabilities872,464104,963
Employees' wage payable122,613,785146,613,413
Tax payable646,2819,202,636
Other account payable140,751,68441,736,245
Including: Interest payable00
Dividend payable105,005,6800
Liabilities held for sales00
Non-current liability due within 1 year6,886,861,1564,293,530,164
Other current liability00
Total of current liability8,953,818,8605,893,788,822
Non-current liabilities:
Long-term loan6,054,225,3009,818,725,300
Bond payable12,683,561,34811,782,624,637
Including: preferred stock00
Sustainable debt00
Lease liability5,732,5619,970,350
Long-term payable00
Long-term remuneration payable to staff245,701,966245,701,966
Expected liabilities00
Deferred income1,310,4111,310,410
Deferred income tax liability472,587,999510,428,489
Other non-current liabilities00
Total non-current liabilities19,463,119,58522,368,761,152
Total of liability28,416,938,44528,262,549,974
Owners' equity
Share capital5,250,283,9865,250,283,986
Other equity instruments00
Including: preferred stock00
Sustainable debt00
Capital reserves4,872,713,3414,861,549,687
Less: Shares in stock00
Other comprehensive income1,461,084,6531,576,172,968
Special reserve34,003,12748,826,625
Surplus reserves8,903,515,1358,903,515,135
Retained profit6,891,490,1896,338,197,616
Total of owners’ equity27,413,090,43126,978,546,017
Total of liabilities and owners’ equity55,830,028,87655,241,095,991

3.Consolidated Income statement

In RMB

ItemThe first half year of 2026The first half year of 2025
I. Income from the key business26,333,085,62423,141,441,943
Incl: Business income26,333,085,62423,141,441,943
Interest income00
Insurance fee earned00
Fee and commission received00
II. Total business cost27,512,047,59023,303,908,273
Incl: Business cost25,330,875,07821,088,563,492
Interest expense00
Fee and commission paid00
Insurance discharge payment00
Net claim amount paid00
Net amount of withdrawal of insurance contract reserve00
Insurance policy dividend paid00
Reinsurance expenses00
Business tax and surcharge174,667,812143,216,314
Sales expense45,135,16943,731,677
Administrative expense642,517,426606,233,009
R & D costs173,308,351321,041,294
Financial expenses1,145,543,7541,101,122,487
Including: Interest expense1,178,549,8541,141,097,530
Interest income39,291,53447,640,150
Add: Other income10,269,79223,899,477
Investment gain (“-”for loss)555,647,455413,769,521
Incl: investment gains from affiliates432,794,674263,056,887
Financial assets measured at amortized cost cease to be recognized as income00
Gains from currency exchange00
Net exposure hedging income00
Changing income of fair value00
Credit impairment loss-7,177,292-7,044,073
Impairment loss of assets16,133-104
Assets disposal income25,316,29941,534
III. Operational profit (“-”for loss)-594,889,579268,200,025
Add: Non-operational income202,692,178140,098,498
Less: Non-operating expense112,679,99085,732,233
IV. Total profit(“-”for loss)-504,877,391322,566,290
Less: Income tax expenses187,723,646225,270,964
V. Net profit-692,601,03797,295,326
(I) Classification by business continuity
1.Net continuing operating profit-692,601,03797,295,326
2.Termination of operating net profit00
(II) Classification by ownership
1.Net profit attributable to the owners of parent company-545,781,40632,474,158
2.Minority shareholders’ equity-146,819,63164,821,168
VI. Net after-tax of other comprehensiveincome-115,088,31519,085,240
Net of profit of other comprehensive income attributable to owners of the parent company.-115,088,31519,099,190
(I) Other comprehensive income items that will not be reclassified into gains/losses in the subsequent accounting period-114,116,26819,465,091
1.Re-measurement of defined benefit plans of changes in net debt or net assets0-125,551
2.Other comprehensive income under the equity method investee can not be reclassified into profit or loss.0-61,100,510
3. Changes in the fair value of investments in other equity instruments-114,116,26880,691,152
4. Changes in the fair value of the company's credit risks00
5.Other00
(II)Other comprehensive income that will be reclassified into profit or loss.-972,047-365,901
1.Other comprehensive income under the equity method investee can be reclassified into profit or loss.-972,047-365,901
2. Changes in the fair value of investments in other debt obligations00
3. Other comprehensive income arising from the reclassification of financial assets00
4.Allowance for credit impairments in investments in other debt obligations00
5. Reserve for cash flow hedges00
6.Translation differences in currency financial statements00
7.Other00
Net of profit of other comprehensive income attributable to Minority shareholders' equity0-13,950
VII. Total comprehensive income-807,689,352116,380,566
Total comprehensive income attributable to the owner of the parent company-660,869,72151,573,348
Total comprehensive income attributable minority shareholders-146,819,63164,807,218
VIII. Earnings per share
(I) Basic earnings per share-0.1040.0062
(II)Diluted earnings per share-0.1040.0062

As for the enterprise combined under the same control, net profit of 0 Yuan achieved by the merged party before combination while 0 Yuan achieved last period.

Legal representative :Zheng Yunpeng

Person-in-charge of the accounting work:Liu Wei

Person-in -charge of the accounting organ:Meng Fei

4. Income statement of the Parent Company

ItemThe first half year of 2026The first half year of 2025
I. Income from the key business30,371,55124,361,404
Incl: Business cost13,858,25216,728,421
Business tax and surcharge1,577,140528,901
Sales expense00
Administrative expense54,402,44051,498,383
R & D expense1,731,587552,778
Financial expenses336,638,419320,088,325
Including: Interest expenses334,769,555317,935,487
Interest income666,125492,014
Add: Other income87,679210,705
Investment gain (“-”for loss)1,037,467,7491,369,732,100
Including: investment gains from affiliates400,279,670260,834,563
Financial assets measured at amortized cost cease to be recognized as income00
Net exposure hedging income00
Changing income of fair value00
Credit impairment loss-22,454-15,532
Impairment loss of assets00
Assets disposal income00
II. Operational profit (“-”for loss)659,696,6871,004,891,869
Add: Non-operational income37,93093,312
Less: Non -operational expenses1,238,09829,419
III. Total profit(“-”for loss)658,496,5191,004,955,762
Less: Income tax expenses198,2660
IV. Net profit658,298,2531,004,955,762
1.Net continuing operating profit658,298,2531,004,955,762
2.Termination of operating net profit00
V. Net after-tax of other comprehensive income-115,088,31542,132,430
(I) Other comprehensive income items that will not be reclassified into gains/losses in the subsequent accounting period-114,116,26842,498,331
1.Re-measurement of defined benefit plans of changes in net debt or net assets00
2.Other comprehensive income under the equity method investee can not be reclassified into profit or loss.0-38,192,821
3. Changes in the fair value of investments in other equity instruments-114,116,26880,691,152
4. Changes in the fair value of the company’s credit risks00
5.Other00
(II)Other comprehensive income that will be reclassified into profit or loss-972,047-365,901
1.Other comprehensive income under the equity method investee can be reclassified into profit or loss.-972,047-365,901
2. Changes in the fair value of investments in other debt obligations00
3. Other comprehensive income arising from the reclassification of financial assets00
4.Allowance for credit impairments in investments in other debt obligations00
5. Reserve for cash flow hedges00
6. Translation differences in currency financial statements00
7. Other00
VI. Total comprehensive income543,209,9381,047,088,192
VII. Earnings per share
(I) Basic earnings per share0.12540.1914
(II) Diluted earnings per share0.12540.1914

5. Consolidated Cash flow statement

In RMB

ItemThe first half year of 2026The first half year of 2025
I.Cash flows from operating activities
Cash received from sales of goods or rending of services30,332,701,40826,187,889,810
Net increase of customer deposits and capital kept for brother company00
Net increase of loans from central bank00
Net increase of inter-bank loans from other financial bodies00
Cash received against original insurance contract00
Net cash received from reinsurance business00
Net increase of client deposit and investment00
Cash received from interest, commission charge and commission00
Net increase of inter-bank fund received00
Net increase of repurchasing business00
Net cash received by agent in securities trading00
Tax returned61,996,573258,723,297
Other cash received from business operation254,123,624473,613,398
Sub-total of cash inflow30,648,821,60526,920,226,505
Cash paid for purchasing of merchandise and services21,378,044,39319,484,610,430
Net increase of client trade and advance00
Net increase of savings in central bank and brother company00
Cash paid for original contract claim00
Net increase in financial assets held for trading purposes00
Net increase for Outgoing call loan00
Cash paid for interest, processing fee and commission00
Cash paid to staffs or paid for staffs1,421,115,0451,383,468,198
Taxes paid1,030,519,112854,209,156
Other cash paid for business activities860,115,445841,817,123
Sub-total of cash outflow from business activities24,689,793,99522,564,104,907
Net cash generated from /used in operating activities5,959,027,6104,356,121,598
II. Cash flow generated by investing
Cash received from investment retrieving00
Cash received as investment gains129,695,899142,392,458
Net cash retrieved from disposal of fixed assets, intangible assets, and other long-term assets110,016,81715,892,116
Net cash received from disposal of00
subsidiaries or other operational units
Other investment-related cash received846,238,699101,226,000
Sub-total of cash inflow due to investment activities1,085,951,415259,510,574
Cash paid for construction of fixed assets, intangible assets and other long-term assets3,019,468,3065,928,555,799
Cash paid as investment0327,000,000
Net increase of loan against pledge00
Net cash received from subsidiaries and other operational units00
Other cash paid for investment activities190,000,00012,501,732
Sub-total of cash outflow due to investment activities3,209,468,3066,268,057,531
Net cash flow generated by investment-2,123,516,891-6,008,546,957
III.Cash flow generated by financing
Cash received as investment2,075,492,000142,865,000
Including: Cash received as investment from minor shareholders2,075,492,000142,865,000
Cash received as loans10,503,607,03518,506,711,250
Other financing –related cash received00
Sub-total of cash inflow from financing activities12,579,099,03518,649,576,250
Cash to repay debts12,266,703,03014,256,275,736
Cash paid as dividend, profit, or interests1,414,299,6771,547,861,180
Including: Dividend and profit paid by subsidiaries to minor shareholders273,308,163307,347,918
Other cash paid for financing activities1,069,591,983494,783,610
Sub-total of cash outflow due to financing activities14,750,594,69016,298,920,526
Net cash flow generated by financing-2,171,495,6552,350,655,724
IV. Influence of exchange rate alternation on cash and cash equivalents-18511,783
V.Net increase of cash and cash equivalents1,664,014,879698,242,148
Add: balance of cash and cash equivalents at the beginning of term12,342,414,94711,831,504,924
VI ..Balance of cash and cash equivalents at the end of term14,006,429,82612,529,747,072

6. Cash Flow Statement of the Parent Company

In RMB

ItemThe first half year of 2026The first half year of 2025
I.Cash flows from operating activities
Cash received from sales of goods or rending of services21,934,16121,483,209
Tax returned02,082,018
Other cash received from business operation32,534,9878,533,350
Sub-total of cash inflow54,469,14832,098,577
Cash paid for purchasing of merchandise and services5,306,1051,564,942
Cash paid to staffs or paid for staffs65,937,93972,980,276
Taxes paid8,793,0661,136,683
Other cash paid for business activities63,176,37529,893,490
Sub-total of cash outflow from business activities143,213,485105,575,391
Net cash generated from /used in operating activities-88,744,337-73,476,814
II. Cash flow generated by investing
Cash received from investment retrieving4,800,556290,000,000
Cash received as investment gains639,902,5491,102,427,948
Net cash retrieved from disposal of fixed assets, intangible assets, and other long-term assets015,000
Net cash received from disposal of subsidiaries or other operational units00
Other investment-related cash received00
Sub-total of cash inflow due to investment activities644,703,1051,392,442,948
Cash paid for construction of fixed assets, intangible assets and other long-term assets4,203,7871,308,877
Cash paid as investment457,121,000832,135,000
Net cash received from subsidiaries and other operational units00
Other cash paid for investment activities00
Sub-total of cash outflow due to investment activities461,324,787833,443,877
Net cash flow generated by investment183,378,318558,999,071
III. Cash flow generated by financing
Cash received as investment00
Cash received as loans1,950,000,0001,904,000,000
Other financing –related ash received00
Sub-total of cash inflow from financing activities1,950,000,0001,904,000,000
Cash to repay debts1,899,500,0001,624,402,540
Cash paid as dividend, profit, or interests256,635,984359,349,831
Other cash paid for financing activities4,089,7115,198,686
Sub-total of cash outflow due to financing activities2,160,225,6951,988,951,057
Net cash flow generated by financing-210,225,695-84,951,057
IV. Influence of exchange rate alternation on cash and cash equivalents-18511,783
V.Net increase of cash and cash equivalents-115,591,899400,582,983
Add: balance of cash and cash equivalents at the beginning of term764,409,926265,969,222
VI ..Balance of cash and cash equivalents at the end of term648,818,027666,552,205

7. Consolidated Statement on Change in Owners’ Equity Amount in this period

In RMB

ItemThe first half year of 2026
Owner's equity Attributable to the Parent CompanyMinor shareholders' equityTotal of owners' equity
Share CapitalOther Equity instrumentCapital reservesLess: Shares in stockOther Comprehensive IncomeSpecialized reserveSurplus reservesCommon risk provisionRetained profitOtherSubtotal
Preferred stockSustainable debtOther
I.Balance at the end of last year5,250,283,9860005,028,330,12501,533,837,24790,467,0338,903,515,13502,637,923,692023,444,357,21818,018,298,45941,462,655,677
Add: Change of accounting policy000000000000000
Correcting of previous errors000000000000000
Other000000000000000
II.Balance at the beginning of current year5,250,283,9860005,028,330,12501,533,837,24790,467,0338,903,515,13502,637,923,692023,4,444,357,21818,018,298,45941,462,655,677
III.Changed in the current year000011,163,6540-115,088,31563,972,02600-650,787,0860-690,739,7211,681,155,119990,415,398
(1) Total comprehensive income000000-115,088,315000-545,781,4060-660,869,721-146,819,631-807,689,352
(II) Investment or decreasing of capital by owners000011,163,654000000011,163,6542,075,492,0002,086,655,654
1. Ordinary Shares invested by shareholders00000000000002,075,492,0002,075,492,000
2. Holders of other equity instruments invested capital000000000000000
3. Amount of shares paid and accounted as owners' equity000000000000000
4. Other000011,163,654000000011,163,654011,163,654
(III) Profit allotment0000000000-105,005,6800-105,005,680-273,099,807-378,105,487
1. Providing of surplus reserves000000000000000
2. Providing of common risk provisions000000000000000
3. Allotment to the owners (or shareholders)0000000000-105,005,6800-105,005,680-273,099,807-378,105,487
4. Other000000000000000
(IV) Internal transferring of owners' equity000000000000000
1. Capitalizing of capital reserves (or to capital shares)000000000000000
2. Capitalizing of surplus reserves (or to capital shares)000000000000000
3. Making up losses by surplus reserves.000000000000000
4. Change amount of defined benefit plans that carry forward Retained earnings00000000000000
5. Other comprehensive income carry-over retained earnings00000000000000
6. Other00000000000000
(V). Special reserves000000063,972,026000063,972,02625,582,557
1. Provided this year0000000190,232,1400000190,232,14068,409,823
2. Used this term0000000-126,260,1140000-126,260,114-42,827,266
(VI) Other00000000000000
IV. Balance at the end of this term5,250,283,9860005,039,493,77901,418,748,932154,439,0598,903,515,13501,987,136,606022,753,617,49719,699,453,578

Amount in last year

In RMB

ItemThe first half year of 2025
Owner's equity Attributable to the Parent CompanyMinor shareholders' equityTotal of owners' equity
Share CapitalOther Equity instrumentCapital reservesLess: Shares in stockOther Comprehensive IncomeSpecialized reserveSurplus reservesCommon risk provisionRetained profitOtherSubtotal
Preferred stockSustainable debtOther
I.Balance at the end of last year5,250,283,9860005,203,250,38301,331,876,09362,769,1668,903,515,13502,142,987,033022,894,681,79613,067,149,58635,961,831,382
Add:Change of accounting policy000000000000000
Correcting of previous errors000000000000000
Other000000000000000
II.Balance at the beginning of current year5,250,283,9860005,203,250,38301,331,876,09362,769,1668,903,515,13502,142,987,033022,894,681,79613,067,149,58635,961,831,382
III.Changed in the current year00009,321,762019,099,19074,474,14600-72,531,522030,363,576-67,018,787-36,655,211
(1) Total comprehensive income00000019,099,19000032,474,158051,573,34864,807,218116,380,566
(II) Investment or decreasing of capital by owners00009,321,76200000009,321,762142,865,000152,186,762
1. Ordinary Shares invested by shareholders0000000000000142,865,000142,865,000
2. Holders of other equity instruments invested capital000000000000000
3. Amount of shares paid and accounted as owners'equity000000000000000
4. Other00009,321,76200000009,321,76209,321,762
(III)Profit allotment0000000000-105,005,6800-105,005,680-309,002,447-414,008,127
1.Providing of surplus reserves000000000000000
2.Providing of common risk provisions000000000000000
3. Allotment to the owners (or shareholders)0000000000-105,005,6800-105,005,680-309,002,447-414,008,127
4. Other000000000000000
(IV)Internal transferring of owners' equity000000000000000
1.Capitalizing of capital reserves (or to capital shares)000000000000000
2.Capitalizing of surplus reserves (or to capital shares)000000000000000
3. Making up losses by surplus reserves.000000000000000
4.Change amount of definedbenefit plans that carry forward Retained earnings000000000000000
5. Other comprehensive income carry-over retained earnings000000000000000
6. Other000000000000000
(V). Special reserves000000074,474,146000074,474,14634,311,442108,785,588
1. Provided this year0000000212,340,8440000212,340,84486,483,343298,824,187
2. Used this term0000000-137,866,6980000-137,866,698-52,171,901-190,038,599
(VI) Other000000000000000
IV. Balance at the end of this term5,250,283,9860005,212,572,14501,350,975,283137,243,3128,903,515,13502,070,455,511022,925,045,37213,000,130,79935,925,176,171

8.Statement of change in owner’s Equity of the Parent Company

Amount in this period

In RMB

ItemThe first half year of 2026
Share capitalOther Equity instrumentCapital reservesLess: Shares in stockOther Comprehensive IncomeSpecialized reserveSurplus reservesRetained profitOtherTotal of owners' equity
Preferred stockSustainable debtOther
I.Balance at the end of last year5,250,283,9860004,861,549,68701,576,172,96848,826,6258,903,515,1356,338,197,616026,978,546,017
Add: Change of accounting policy000000000000
Correcting of previous errors000000000000
Other000000000000
II.Balance at the beginning of current year5,250,283,9860004,861,549,68701,576,172,96848,826,6258,903,515,1356,338,197,616026,978,546,017
III.Changed in the current year000011,163,6540-115,088,315-14,823,4980553,292,5730434,544,414
(I) Total comprehensive income000000-115,088,31500658,298,2530543,209,938
(II) Investment or decreasing of capital by owners000011,163,65400000011,163,654
1. Ordinary Shares invested by shareholders000000000000
2. Holders of other equity instruments invested capital000000000000
3.Amount of shares paid and accounted as owners' equity000000000000
4. Other000011,163,65400000011,163,654
(III) Profit allotment000000000-105,005,6800-105,005,680
1.Providing of surplus reserves000000000000
2. Allotment to the owners (or shareholders)000000000-105,005,6800-105,005,680
3. Other000000000000
(IV) Internal transferring of owners' equity000000000000
1. Capitalizing of capital reserves (or to capital shares)000000000000
2. Capitalizing of surplus reserves (or to capital shares)000000000000
3. Making up losses by surplus reserves.000000000000
4.Change amount of defined benefit plans that carry forward Retained earnings000000000000
5. Other comprehensive income carry-over retained earnings000000000000
6. Other000000000000
(V) Special reserves0000000-14,823,498000-14,823,498
1. Provided this year0000000693,433000693,433
2. Used this term0000000-15,516,931000-15,516,931
(VI) Other000000000000
IV. Balance at the end of this term5,250,283,9860004,872,713,34101,461,084,65334,003,1278,903,515,1356,891,490,189027,413,090,431

Amount in last year In RMB

ItemThe first half year of 2025
Share CapitalOther Equity instrumentCapital reservesLess: Shares in stockOther Comprehensive IncomeSpecialized reserveSurplus reservesRetained profitOtherTotal of owners' equity
Preferred stockSustainable debtOther
I.Balance at the end of last year5,250,283,9860004,849,472,20501,345,335,53338,111,2548,903,515,1355,701,301,782026,088,019,895
Add: Change of accounting policy000000000000
Correcting of previous errors000000000000
Other000000000000
II.Balance at the beginning of current year5,250,283,9860004,849,472,20501,345,335,53338,111,2548,903,515,1355,701,301,782026,088.019,895
III.Changed in the current year00009,343,464042,132,43000899,950,0820951,425,976
(I) Total comprehensive income00000042,132,43001,004,955,76201,047,088,192
(II) Investment or decreasing of capital by owners00009,343,4640000009,343,464
1. Ordinary Shares invested by shareholders000000000000
2. Holders of other equity instruments invested capital000000000000
3.Amount of shares paid and accounted as owners' equity000000000000
4. Other00009,343,4640000009,343,464
(III) Profit allotment000000000-105,005,6800-105,005,680
1.Providing of surplus reserves000000000000
2. Allotment to theowners (or shareholders)000000000-105,005,6800-105,005,680
3. Other000000000000
(IV) Internal transferring of owners' equity000000000000
1. Capitalizing of capital reserves (or to capital shares)000000000000
2. Capitalizing of surplus reserves (or to capital shares)000000000000
3. Making up losses by surplus reserves.000000000000
4. Change amount of defined benefit plans that carry forward Retained earnings000000000000
5. Other comprehensive income carry-over retained earnings000000000000
6. Other000000000000
(V) Special reserves000000000000
1. Provided this year0000000260,781000260,781
2. Used this term0000000-260,781000-260,781
(VI) Other000000000000
IV. Balance at the end of this term5,250,283,9860004,858,815,66901,387,467,96338,111,2548,903,515,1356,601,251,864027,039,445,871

III.Basic Information of the Company

Guangdong Electric Power Development Co., Ltd. (hereinafter “Guangdong Electric Power”, “the Company”) is a limited liability company jointly established by Guangdong Electric Power Holding Company, China Construction Bank, Guangdong Province Trust Investment Company, Guangdong Power Development Co., Ltd., Guangdong International Trust, and China Guangfa Bank (currently named as Guangdong Guangkong Group Co., Ltd.). The address of the Company's registered office and head office is F33-F36 South Tower Building of Yudean Square on 2nd Tianhe East Road, Guangzhou, Guangdong Province, the People's Republic of China ("the PRC"). The Company's parent company is Guangdong Energy Group Co., Ltd. ("GEGC") and its ultimate controlling shareholder is the State-owned Assets Supervision and Administration Commission of the People's Government of Guangdong Province.

The Company’s issuing RMB ordinary shares (“A-share”) and domestic listed foreign shares (“B-share”) are listed for transactions in Shenzhen Stock Exchange respectively on 26 November 1993 and 28 June 1995. On 30 June 2025, the total share capital of the Company is RMB 5,250,283,986 with par value of RMB 1 each.

The Company and its subsidiaries (collectively referred to as "the Group") are principally engaged in the businesses of developing and operating electric power projects in Guangdong Province, Yunnan Province, Xinjiang Uygur Autonomous Region, Hunan Province, Guangxi Zhuang Autonomous Region and Inner Mongolia Autonomous Region.

The financial statement has been approved for issue by the Company’s Board of Directors on August 24,20 26.

For the Consolidation scope changed of the Group, please refer to IX and X(Equity in other entities

IV.Basis for the preparation of financial statements

1.Basis for the preparation

The financial statements are prepared in accordance with the Accounting Standards for Business Enterprises and corresponding application guidance, interpretations and other related provisions issued by the Ministry of Finance (collectively, "Accounting Standards for Business Enterprises"). In addition, the Company also disclosed the relevant financial information in accordance with the Explanatory Announcement No. 15 on Information Disclosure for Companies Offering Their Securities to the Public —General Requirements for Financial Reporting (2023 version) issued by the China Securities Regulatory Commission.

The financial statements are prepared on a going concern basis. The Company adopts the accrual basis of accounting. Except for certain financial instruments, the financial statements are prepared under the historical cost. In the event that impairment of assets occurs, a loss allowance is made accordingly in accordance with the relevant regulations.

2. Continuous operation.

This financial statement is prepared on a going-concern basis.

When preparing the financial statements for this year, the Board of Directors of the Company made a full evaluation on the Company's going-concern ability for 12 months from the end of the reporting period, and the evaluation results showed no major doubts about its going-concern ability.

V. Significant accounting policies and accounting estimates

Specific accounting policies and accounting estimates tips:

The Company determines specific accounting policies and accounting estimates based on the characteristics of production and operation, which are mainly reflected in the measurement of expected credit losses(“ECL”) of receivables and contract assets, costing of inventory, depreciation of fixed assets, amortization of intangible assets and right-of-use assets. Specific accounting policies are detailed in Notes V.11, Notes V.17, Notes V.24, Notes V.29, Notes V.30, Notes V.37, Notes V.40, and Notes V.41.

Details of the Group’s critical judgements, critical accounting estimates and key assumptions used in determining significant accounting policies are set forth in Note V.42.

1.Complying with the statements in Accounting Standards for Business Enterprises

The financial Report and statements are prepared with compliance to the requirement of the Enterprise Accounting Standard. They reflect the financial position as of June 30, 2025 as well as the business performance and cash flow situation in the first half of 2026 of the Company frankly and completely.

2. Accounting period

Fiscal year is dated from Gregorian calendar Jan., 1 to Gregorian calendar December, 31.

The accounting of the financial statements during the period starts from January 1, 2026 to 6 months ended June 30,2026.

3.Operating cycle

The business cycles for principal activities are usually less than 12 months.

4.Standard currency for bookkeeping

The Company and domestic subsidiaries use Renminbi (RMB) as their recording currency. The currency used by the Company in preparing these financial statements is Renminbi (RMB).

5.Determination method and selection basis of importance standard

<sup></sup>Applicable □Not applicable

ItemCriterion of importance
Significant long-term equity investmentThe Group determines significant long-term equity investments by taking into account factors such as the book value of joint ventures and associated enterprises, the proportion of long-term equity investment income calculated by equity method to the consolidated net profit of the Group.
Significant Fixed assetsThe Group recognizes fixed asset items with signs of impairment and asset balances greater than RMB 500 million as important fixed asset items.
Significant Construction in progressThe Group determines major construction in progress in consideration of the proportion of construction in progress to the total construction in progress of the Group.
Subsidiaries with significant minority interestsThe Group determines the subsidiaries with significant minority shareholders' equity in consideration of the proportion of minority shareholders' equity of subsidiaries to the total minority shareholders' equity of the Group.
Basic information of important joint ventures and associated enterprisesThe Group determines significant long-term equity investments by taking into account factors such as the book value of joint ventures and associated enterprises, the proportion of important joint ventures and associated enterprises income calculated by equity method to the consolidated net profit of the Group.

6. Accounting process method of enterprise consolidation under same and different controlling.

(1) Business combinations involving enterprises under common control

The consideration paid and net assets obtained by the Company in a business combination are measured at the carrying amount. If the acquiree is acquired from a third party by the ultimate controlling party in a prior year, the consideration paid and net assets obtained by the Company are measured based on the carrying amounts of the acquiree’s assets and liabilities (including the goodwill arising from the acquisition of the acquiree by the ultimate controlling party) presented in the consolidated financial statements of the ultimate controlling party. The difference between the carrying amount of the net assets obtained from the combination and the carrying amount of the consideration paid for the combination is treated as an adjustment to capital surplus (share premium). If the capital surplus (share premium) is not sufficient to absorb the difference, the remaining balance is adjusted against retained earnings

Realize business combinations under the same control through multiple transactions in stages

The assets and liabilities acquired by the acquirer from the acquiree in the merger are measured at the book value in the consolidated financial statements of the ultimate controlling party on the merger date. The difference between the sum of the book value of the investments held before the merger and the book value of the newly paid consideration on the merger date, and the book value of the net assets acquired in the merger, is adjusted to the capital reserves. If the capital reserves are insufficient to offset, the retained earnings are adjusted. For long-term equity investments held by the acquirer before obtaining control of the acquiree, the related profits and losses, other comprehensive income, and other changes in owner's equity recognized between the date of acquiring the original equity and the later of the dates when both the acquirer and the acquiree are under the same ultimate control, and up to the merger date, should be offset against the beginning retained earnings or current profits and losses during the comparative reporting period.

(2) Business combinations not involving enterprises under common control

For business combinations involving enterprises not under common control, the Company adopts concentration test to judge whether the acquired production and operation activities or asset groups constitute a business. If the concentration test is passed, the Company conducts accounting treatment according to the relevant asset purchase principle; if the concentration test fails, the Company will further judge whether it constitutes a business based on whether the relevant groups obtained in the merger have at least one input and one substantive processing process, and the combination of the two has a significant contribution to the output capacity.

The cost of combination and identifiable net assets obtained by the Group in a business combination are measured at fair value at the acquisition date. Where the cost of the combination exceeds the Group’s interest in the fair value of the acquiree’s identifiable net assets, the difference is recognised as goodwill; where the cost of combination is lower than the Group’s interest in the fair value of the acquiree’s identifiable net assets, the difference is recognised in profit or loss for the current period.

Realize business combinations not under common control through multiple transactions and steps

The cost of combination is the sum of the consideration paid on the acquisition date and the fair value of the equity already held by the acquirer in the acquiree on the acquisition date. For the equity already held by the acquirer in the acquiree before the acquisition date, it is remeasured at its fair value on the acquisition date, and the difference between the fair value and its book value is recognized in the current investment income. The equity already held by the acquirer in the acquiree before the acquisition date involving other comprehensive income and other changes in owner's equity is transferred to the current income on the acquisition date, except for other comprehensive income arising from the remeasurement of net liabilities or net assets of the defined benefit plan by the investee and other comprehensive income related to non-trading equity instrument investments originally designated to be measured at fair value with changes recognized in other comprehensive income.

(3) Handling of transaction costs in business combinations

The intermediary fees incurred for auditing, legal services, evaluation and consultation, as well as other related management expenses for the purpose of corporate mergers, are recorded profit or loss profit or loss for the current period. When they are incurred. The transaction costs of equity securities or debt securities issued as merger consideration are included in the initial recognition amount of the equity securities or debt securities.

7. Judgment criteria for control and method for preparing consolidated financial statements

(1) Judgment criteria for control

The scope of consolidation for consolidated financial statements is determined on a control basis. Control refers to the power that the Company has over the invested entity, the variable returns it enjoys through participating in the relevant activities of the invested entity, and the ability to use its power over the invested entity to affect its return amount. When changes in relevant facts and circumstances lead to changes in the relevant elements involved in the definition of control, the Company will conduct a reassessment.

(2) Preparation of consolidated financial statements

The consolidated financial statements are prepared by the Company based on the financial statements of the Company and its subsidiaries and other relevant information. When preparing the consolidated financial statements, the accounting policies and accounting periods of the subsidiaries shall be consistent with those established by the Company. All significant intra-company balances and transactions shall be eliminated.

Where a subsidiary or business was acquired during the reporting period, through a business combination involving entities under common control, the financial performance and the cash flows of the subsidiary are included in the consolidated income statement and consolidated cash flow statement of the Company as if the combination had occurred at the date that the ultimate controlling party first obtained control.

Where a subsidiary or business was acquired during the reporting period, through a business combination involving entities not under common control, its revenue, expenses and profit from the acquisition date to the end of the reporting period are included in the consolidated income statement and its cash flows are included in the consolidated cash flow statement.

Minority interests of the subsidiary that is not attributable to the Company are presented separately in the shareholders’ equity section within the consolidated balance sheet. Net profit or loss attributable to noncontrolling shareholders is presented separately as minority interests below the net profit within the consolidated income statement. When the amount of loss for the current period attributable to the non controlling shareholders of a subsidiary exceeds the non-controlling shareholders’ share of the opening owners equity of the subsidiary, the excess is adjusted to minority interests

(3) Acquire the subsidiaries’ non-controlling interests

Where the Company acquires a non-controlling interest from a subsidiary’s non-controlling shareholders or disposes of a portion of an interest in a subsidiary without a change in control, the difference between the proportion interests of the subsidiary’s net assets being acquired or disposed and the amount of the consideration paid or received is adjusted to the capital reserve in the consolidated balance sheet, with any excess adjusted to retained earnings.

(4) Handling of losing control over a subsidiary

When the Company loses control over a subsidiary due to partial disposal of equity investment or other reasons, the remaining equity interests is re-measured at its fair value at the date when the control is lost. The resulting gain or loss is the total of consideration received from the disposal of equity investment and the remaining equity investment at its fair value, deducted the total of proportion interests of the subsidiary’s net asset and goodwill calculated based on the original shareholding ratio since the acquisition date. Any resulting gain or loss is recognized as investment income for the current period

Other comprehensive income related to the equity investment in the original subsidiary is accounted for on the same basis as the direct disposal of related assets or liabilities by the original subsidiary upon the loss of control. All other changes in owner's equity related to the original subsidiary and accounted for using the equity method are transferred to the current period profit or loss upon the loss of control.

8. Classification and Accounting Treatment for Joint Arrangement

A joint arrangement is an arrangement of which two or more parties have joint control. The Company classifies joint arrangements into joint operations and joint ventures.

(1) Joint operation

A joint operation is a joint arrangement whereby the Company has rights to the assets, and obligations for the liabilities, relating to the arrangement. The Company is not involved in joint operations.

(2) Joint venture

A joint venture is a joint arrangement whereby the Company has rights to the net assets of the arrangement. The Company adopts equity method of long-term equity investment to account for its investment in joint venture.

9. Cash and cash equivalents

Cash and cash equivalents comprise cash on hand, deposits that can be readily drawn on demand, and short term and highly liquid investments that are readily convertible to known amounts of cash and which are subject to an insignificant risk of changes in value.

10.Foreign currency transactions

Foreign currency transactions are translated to the functional currency of the Company at the spot exchange rates on the dates of the transactions.

Monetary items denominated in foreign currencies are translated at the spot exchange rate at the balance sheet date. The resulting exchange differences between the spot exchange rate at balance sheet date and the spot exchange rate at initial recognition or at the previous balance sheet date are recognized in profit or loss. Nonmonetary items that are measured at historical cost in foreign currencies are translated to functional currency using the spot exchange rate at the transaction date. Non-monetary items that are measured at fair value in foreign currencies are translated using the spot exchange rate at the date when the fair value is determined. The resulting exchange differences are recognized in profit or loss or other comprehensive income according to the nature of the non-monetary items.

11.Financial instruments

A financial instrument is any contract that gives rise to a financial asset of one entity and a financial liability or an equity instrument of another entity.

(1) Recognition and derecognition of financial instruments

A financial asset or a financial liability is recognized when the Company becomes a party to the contractual provisions of a financial instrument.

A financial asset is derecognised when one of the following criteria is met:

The contractual rights to the cash flows from the financial asset expire; or

The financial asset has been transferred and met the following conditions for derecognition.

A financial liability (or partially) is derecognized when its contractual obligation (or partially) is ceased. When the Company (debtor) enters into an agreement with the creditor to replace the existing financial liability with a new assumed financial liability, and contractual terms are different in substance, the existing financial liability is derecognized while a new financial liability is recognized.

Conventionally traded financial assets are recognized and derecognized at the transaction date.

(2) Classification and measurement of financial assets

Based on the Company’s business model for managing the financial assets and the contractual cash flow characteristics of the financial assets, financial assets are classified as: financial assets measured at amortized cost, financial assets measured at fair value through other comprehensive income and financial assets measured at fair value through profit or loss.

At initial recognition, the financial assets are measured at fair value. For financial assets measured at fair value through profit or loss, the transaction costs are expensed in profit or loss for the current period. For other types of financial assets, the transaction costs are included in the initially recognised amounts. Accounts receivable arising from sale of products or rendering of services (excluding or without regard to significant financing components), the Company recognizes the amount of consideration that it is expected to be entitled to receive as the initially recognised amounts.

Financial assets measured at amortized cost

The Company classifies financial assets that meet all of the following conditions and are not designated as financial assets at fair value through profit or loss as financial assets measured at amortized cost:

The objective of the Company’s business model is to hold the financial assets to collect the contractual cash flows;

The contractual terms of the financial asset stipulate that the cash flows generated on specific dates are solely payments on the principal and interest based on the outstanding principal amount.

After initial recognition, such financial assets are measured at amortized cost using the effective interest method. Gains or losses arising from financial assets measured at amortized cost that are not part of any hedging relationship are recognized in the current period profit or loss when they are derecognized, amortized using the effective interest method, or recognized as impaired.

Financial assets measured at fair value through other comprehensive income

The Company classifies financial assets that meet all of the following conditions and are not designated as financial assets measured at fair value through profit or loss, as financial assets measured at fair value through in other comprehensive income:

The business model of our company for managing this financial asset aims both at collecting contractual cash flows and at selling the financial asset;

The contractual terms of the financial asset stipulate that the cash flows generated on specific dates are solely payments on the principal and interest based on the outstanding principal amount. After initial recognition, subsequent measurements of such financial assets are measured at fair value. Interests calculated using the effective interest method, impairment losses or gains, and exchange gains or losses are recognized in the current period profit or loss, while other gains or losses are recorded in other comprehensive income. Upon derecognition, the cumulative gains or losses previously recorded in other comprehensive incomeare transferred out of other comprehensive income and recognized in the current period profit or loss.

Financial assets measured at fair value through profit or loss

In addition to the financial assets at amortized cost and those measured at fair value through other comprehensive income as mentioned above, the Company categorizes all other financial assets as those measured at fair value through profit or loss. Upon initial recognition, in order to eliminate or significantly reduce accounting mismatches, the Company irrevocably designates some financial assets that should be measured at amortized cost or at fair value through in other comprehensive income as financial assets measured at fair value through profit or loss.

After initial recognition, subsequent measurements of such financial assets are measured at fair value, and any gains or losses (including interest and dividend income) arising therefrom are recorded in the current period profit or loss, unless the financial asset is part of a hedging relationship.

However, for non-trading equity instrument investments, the Company irrevocably designates them as financial assets measured at fair value through other comprehensive income upon initial recognition. This designation is made on an individual investment basis, and the relevant investments meet the definition of equity instruments from the perspective of the issuer.

After initial recognition, subsequent measurements of such financial assets are measured at fair value. Dividend income that meets the criteria is recorded in profit or loss, while other gains or losses and changes in fair value are recorded in other comprehensive income. Upon derecognition, the cumulative gains or losses previously recorded in other comprehensive income are transferred out of other comprehensive income and recorded in retained earnings.

The business model for managing financial assets refers to how the company manages its financial assets to generate cash flows. The business model determines whether the source of cash flows from the financial assets managed by the company is from the collection of contractual cash flows, the sale of financial assets, or a combination of both.

The company determines its business model for managing financial assets based on objective facts and the specific business objectives for managing financial assets determined by key management personnel. The Company evaluates the contractual cash flow characteristics of financial assets to determine whether the contractual cash flows generated by the relevant financial assets on a specific date are solely payments of principal and interest based on the outstanding principal amount. The principal refers to the fair value of the financial asset at initial recognition; interest includes consideration for the time value of money, credit risk associated with the outstanding principal amount during a specific period, as well as other basic borrowing risks, costs, and profits. In addition, the Company evaluates contract terms that may lead to changes in the time distribution or amount of contractual cash flows of financial assets to determine whether they meet the requirements of the aforementioned contractual cash flow characteristics.

Only when the company changes its business model for managing financial assets, all affected relevant financial assets will be reclassified on the first day of the first reporting period following the change in business model. Otherwise, financial assets shall not be reclassified after initial recognition.

(3) Classification and measurement of financial liabilities

The financial liabilities of the Company are classified at initial recognition as either financial liabilities measured at fair value through profit or loss, or financial liabilities measured at amortized cost. For financial liabilities not classified as measured at fair value through profit or loss, the transaction costs are included in their initially recognised amounts.

Financial liabilities measured at fair value through profit or loss

Financial liabilities measured at fair value through profit or loss include trading financial liabilities and financial liabilities designated at initial recognition as measured at fair value through profit or loss. For such financial liabilities, subsequently measured at fair value, and gains or losses arising from changes in fair value, as well as dividend and interest expenses related to these financial liabilities, are recognized in current profit or loss.

Financial liabilities measured at amortized cost

Other financial liabilities are subsequently measured at amortized cost using the effective interest method, and gains or losses arising from derecognition or amortization are recognized in the current period profit or loss.

Distinction between financial liabilities and equity instruments

A financial liability is recognized if one of the following conditions is satisfied::

① A contractual obligation to deliver cash or another financial asset to another entity;

② A contractual obligation to exchange financial assets or financial liabilities with another entity under potentially unfavorable conditions;

② A non-derivative instrument contract that will or may be settled in the Company’s own equity instruments and the Company is obliged to deliver a variable number of the Company’s own equity instruments;

④ A derivative instrument contract that will or may be settled in the Company’s own equity instruments in the future, except for a derivative instrument contract that is settled by the exchange of a fixed number of the Company’s own equity instruments for a fixed amount of cash or other financial assets.

An equity instrument is a contract that evidences a residual interest in the assets of the Company after deducting all of its liabilities.

If the Company does not have an unconditional right to avoid delivering cash or another financial asset to settle a contractual obligation, the obligation meets the definition of a financial liability.

If a financial instrument will or may be settled by the Company’s own equity instruments, classification of the instrument depends on whether the Company’s own equity instruments work as the replacement of cash or other financial instrument, or represent the investor’s residual interest in the Company’s assets after deducting all its liabilities. In the former case, the instrument is classified as a financial liability; in the latter case, the instrument is classified as an equity instrument.

(4) Fair value of financial instruments

For the determination of fair value of financial assets and financial liabilities, please refer to Note III.12.

(5) Impairment of financial assets

Based on ECL, the Company performs impairment accounting treatment on the following items and recognizes loss provisions:

Financial assets measured at amortized cost;

Receivables and debt instrument investments measured at fair value through other comprehensive income;

Contract assets as defined in "Accounting Standards for Business Enterprises No. 14 - Revenue"; Lease receivables;

Financial guarantee contract (except for those measured at fair value through profit and loss, the transfer of financial assets does not meet the conditions for derecognition or continue to involve in the transferred financial assets)

Measurement of ECL

ECL refers to the weighted average of credit losses for financial instruments, calculated by weighting the risk of default occurring. Credit loss is defined as the difference between all contractual cash flows receivable by the entity under the agreement and all expected cash flows to be collected, discounted at the original effective interest rate. This represents the present value of all cash shortfalls.

The Company measures the expected credit losses of financial instruments at different stages separately. The financial instrument is at the first stage when there is no significant increase in credit risk since initia recognition. The Company measures the loss allowance according to the expected credit losses in the next 12 months. The financial instrument is at the second stage when there is significant increase in credit risk since initial recognition and credit loss is not yet occurred. The Company then measures the loss allowance according to expected credit losses over the lifetime of a financial instrument. The financial instrument is at the third stage when there is significant increase in credit risk since initial recognition and credit loss occurred. The Company then measures the loss allowance according to expected credit losses over the lifetime of a financial instrument. For financial instrument that has low credit risk at the balance sheet date, the Company assumes there is no significant increase in its credit risk since initial recognition. The Company measures the loss allowance according to the expected credit losses in the next 12 months.

Lifetime expected credit losses are the expected credit losses that result from all possible default events over the expected life of a financial instrument. Expected credit losses in the next 12 months are the portion of expected losses that result from default events that are possible within the 12 months after the balance sheet date (or a shorter period if the expected life of the instrument is less than 12 months).

The maximum period considered when estimating expected credit losses is the maximum contractual period (including extension options) over which the Company is exposed to credit risk. For the financial instruments at the first and second stage as well as financial instruments that have low credit risk, the Company calculates the interest income based on the book value without loss allowance deducted and effective interest rate. While for the financial instruments at the third stage, the Company calculates the interest income based on the amortized cost of the book value less loss allowance and effective interest rate. For accounts receivable such as notes receivable, accounts receivable, accounts receivable financing, other receivables, and contract assets, if the credit risk characteristics of a particular customer are significantly different from those of other customers in the group, or if there is a significant change in the credit risk characteristics of that customer, the company will individually accrue bad debt reserves for that account receivable. Apart from the account receivables for which bad debt reserves are individually accrued, the company divides account receivables into groups based on credit risk characteristics and calculates bad debt reserves on a group basis.

Notes receivable, accounts receivable, contract assets, and other receivables

For notes receivable, accounts receivable, and contract assets, regardless of whether there is a significant financing component, the Company consistently measures their loss provisions at an amount equivalent to the ECL over the entire duration.

For various financial assets whose ECL are calculated on an individual basis, their credit risk characteristics are significantly different from those of other financial assets within the same category. When it is not possible to assess the ECL of an individual financial asset at a reasonable cost, the Company categorizes accounts receivable into several groups based on credit risk characteristics. The ECL are calculated on a group basis, and the basis and method for determining the group are as follows:

CombinationCombination name
Group of Notes receivableNotes receivable
Group of account receivableReceivables from sale of electricity
Group of Account receivableReceive of renewable energy subsidies
Group 3 of account receivableReceivables from related parties
Group 4 of account receivableReceivables from steam sales and others
Group 1 of contract assetsReceivables from related parties
Group 2 of contract assetsOther contract assets
Group 1 of other receivablesReceivables from business units, reserves receivable and other receivables

For notes receivable and contract assets classified as groups, the Company calculates ECL by referencing historical credit loss experience, considering current conditions, and forecasting future economic conditions, based on the exposure to default risk and the expected credit loss rate over the entire duration.

For accounts receivable classified into groups, the Company calculates ECL by referring to historical credit loss experience, combining current conditions with predictions of future economic conditions, and using default risk exposure and expected credit loss rate over the entire duration. For other receivables classified into portfolios, the Company calculates ECL by referring to historical credit loss experience, combining current conditions with predictions of future economic conditions, and using default risk exposure and expected credit loss rate within the next 12 months or over the entire duration.

The Company recognises the loss provision made or reversed into profit or loss for the current period.

Debt investment, other debt investments

For debt investments and other debt investments, the Company calculates ECL based on the nature of the investment, various types of counterparties and risk exposures, through default risk exposures and expected credit loss rates within the next 12 months or throughout the entire duration

Assessment of significant increase in credit risk

In assessing whether the credit risk of a financial instrument has increased significantly since initial recognition, the Company compares the risk of default occurring on the financial instrument assessed at the balance sheet date with that assessed at the date of initial recognition. When determining whether the credit risk has increased significantly since initial recognition, the Company considers the reasonable and supportable information that is available without undue cost or effort, including forward-looking information. In particular, the following information is taken into account:

Debtors fail to make payments of principal or interest on their contractually due dates;

An actual or expected significant deterioration in a financial instrument’s external or internal credit rating (if available);

An actual or expected significant deterioration in the operating results of the debtor; and Existing or anticipated changes in the technological, market, economic or legal environment that have a significant adverse effect on the debtor’s ability to meet its obligation to the Company.

Depending on the nature of the financial instruments, the Company assesses whether there is a significant increase in credit risk on either an individual basis or a collective basis. When the assessment is performed on a collective basis, the financial instruments are classified into groups based on shared credit risk characteristics, such as past due status and credit risk ratings.

If the overdue period exceeds 30 days, the Company determines that the credit risk of the financial instrument has significantly increased.

Credit-impaired financial assets

At each balance sheet date, the Company assesses whether financial assets measured at amortized cost and debt investments measured at fair value through other comprehensive income are creditimpaired. A financial asset is credit-impaired when one or more events that have adverse impact on the expected future cash flows of financial asset have occurred. Evidence that a financial asset is creditimpaired includes the following observable information:

Significant financial difficulty of the debtor or issuer;

A breach of contract by the debtor, such as default or overdue in interest or principal payments; For economic or contractual reasons relating to the debtor’s financial difficulty, the Company having granted to the debtor a concessions that would not otherwise consider;

It is probable that the debtor will enter into bankruptcy or other financial restructuring;

The disappearance of an active market for that financial asset because of issuer’s or debtor’s financial difficulties.

Presentation of allowance for expected credit losses

In order to reflect the change of the credit risk of financial instruments since the initial recognition, the Company re-measures the expected credit losses at each balance sheet date. Any increase or recovered amount of the loss allowance which generated shall be recognized as loss allowance or gain in the profit or loss for the current period. For financial asset measured at amortized cost, the loss allowance shall offset against the carrying amount of the financial asset as stated in the balance sheet; for the debt investment measured at fair value through other comprehensive income, the Company recognizes its loss allowance in other comprehensive income and does not offset against the carrying amount of the financial asset.

Write-off

The gross carrying amount of a financial asset is written off (either partially or entirely) to the extent that there is no realistic prospect of recovery of the contractual cash flows. A write-off constitutes a derecognition event. This is generally the case when the Company determines that the debtor does not have assets or sources of income that could generate sufficient cash flows to repay the amounts subject to the write-off. However, financial assets that are written off could still be subject to enforcement activities in order to comply with the Company’s procedures for recovery of amounts due.

Subsequent recoveries of an asset that was previously written off are recognized as a reversal of impairment in profit or loss in the period when the recovery occurs.

(6) Transfer of financial assets

Transfer of financial assets is the transfer or delivery of financial assets to another party (the transferee) other than the issuer of financial assets.

A financial asset is derecognized if the Company transfers substantially all the risks and rewards of ownership of the financial asset to the transferee. A financial asset is not derecognized if the Company retains substantially all the risks and rewards of ownership of the financial asset.

The Company neither transfers nor retains substantially all the risks and rewards of ownership of the financial asset, the accounting treatments are as following: if control over the financial assets is surrendered, the Company derecognizes the financial assets and recognizes any assets and liabilities arose; if the Company retains the control of the financial assets, financial assets to the extent of the continuing involvement in the transferred financial assets by the Company as well as any relating liability.

(7) Offset between financial assets and financial liabilities

When the Company has an enforceable legal right to offset the recognized financial assets against the financial liabilities, and the Company plans to settle by net amount or realize the financial assets and settle the financial liabilities, the amount after being offset will be presented in the balance sheet. Otherwise, financial assets and financial liabilities are presented separately in the balance sheet and not allowed to offset against each other.

12.Note receivable

See Note V (11) Financial Instruments for details.

13.Account receivable

See Note V (11) Financial Instruments for details.

14.Financing receivable

Not applicable

15.Other account receivable

Determination method of expected credit loss of other receivables and accounting treatment method See Note V (11) Financial Instruments for details.

16.Contract assets

See Note V (11) Financial Instruments for details.

17.Inventories

18.Held-for-sale assets Not applicable

19.Creditor's rights investment Not applicable

20.Other Creditor's rights investment Not applicable

21.Long-term account receivable

See Note V (11) Financial Instruments for details.

22.Long-term equity investments

Long-term equity investments comprise the Company’s long-term equity investments in its subsidiaries, and the Company’s long-term equity investments in its joint ventures and associates. If the Company is able to exert significant influence over the invested entity, it is considered as the Company's associated enterprise.

(1) Determination of initial investment cost

For long-term equity investments acquired through a business combination involving enterprises under common control, the investment cost shall be the absorbing party’s share of the carrying amount of owners’ equity of the party being absorbed in the consolidated financial statements of the ultimate controlling party at the combination date; for long-term equity investments acquired through a business combination involving enterprises not under common control, the investment cost shall be the combination cost.

For long-term equity investments acquired not through a business combination: for long-term equity investments acquired by payment in cash, the initial investment cost shall be the purchase price actually paid; for long-term equity investments acquired by issuing equity securities, the initial investment cost shall be the fair value of the equity securities issued.

(2)Subsequent measurement and recognition of profit or loss

Investments in subsidiaries are accounted for using the cost method, unless the investment meets the conditions for held-for-sale; investments in associates and joint ventures are accounted for using the equity method.

For long-term equity investments accounted for using the cost method, except for the actual payment made at the time of investment or the cash dividends or profits included in the consideration that have been declared but not yet distributed, the cash dividends or profits declared and distributed by the investee are recognized as investment income in profit or loss for the current period.

For long-term equity investments accounted for using the equity method, where the initial investment cost exceeds the Company’s share of the fair value of the investee’s identifiable net assets at the time of acquisition, the investments is initially measured at that cost; where the initial investment cost is less than the Company’s share of the fair value of the investee’s identifiable net assets at the time of acquisition, the difference is included in profit or loss for the current period and the cost of the long-term equity investment is adjusted upwards accordingly

When accounting using the equity method, investment income and other comprehensive income are recognized based on the share of net profit or loss and other comprehensive income realized by the invested entity that should be enjoyed or shared, and the book value of the long-term equity investments is adjusted accordingly. The portion of profits or cash dividends declared and distributed by the invested entity that should be enjoyed is calculated, and the book value of the long-term equity investments is correspondingly reduced. For other changes in the owner's equity of the invested entity other than net profit or loss, other comprehensive income, and profit distribution, the book value of the long-term equity investment is adjusted and included in capital reserves (other capital reserves). When recognizing the share of net profit or loss of the invested entity that should be enjoyed, the fair value of the identifiable assets and other items of the invested entity at the time of investment acquisition is used as the basis, and the net profit of the invested entity is adjusted according to the accounting policies and accounting periods of the company before recognition.

If, due to reasons such as additional investments, the investor is able to exert significant influence or joint control over the investee but does not constitute control, on the transition date, the sum of the fair value of the original equity and the newly added investment cost shall be regarded as the initial investment cost accounted for using the equity method. If the original equity is classified as a nontrading equity instrument investment measured at fair value with changes recognized in other comprehensive income, the cumulative fair value changes previously recognized in other comprehensive income related to it shall be transferred to retained earnings when accounting for it using the equity method.

If joint control or significant influence over the investee is lost due to reasons such as the disposal of a portion of equity investment, the remaining equity after disposal shall be accounted for in accordance with "Accounting Standards for Business Enterprises No. 22 - Recognition and Measurement of Financial Instruments" on the date when joint control or significant influence is lost. The difference between fair value and book value shall be recorded in the profit or loss for the current period. For other comprehensive income recognized from the original equity investment accounted for using the equity method, accounting treatment shall be conducted on the same basis as the direct disposal of related assets or liabilities by the investee when the equity method is no longer used for accounting. All other changes in owner's equity related to the original equity investment shall be transferred to the profit or loss for the current period.

If control over the invested entity is lost due to reasons such as the disposal of a portion of equity investment, and the remaining equity after disposal can jointly control or exert significant influence over the invested entity, the equity method shall be adopted for accounting, and the remaining equity shall be adjusted as if it had been accounted for using the equity method from the time of acquisition. If the remaining equity after disposal cannot jointly control or exert significant influence over the invested entity, accounting treatment shall be conducted in accordance with the relevant provisions of "Accounting Standards for Business Enterprises No. 22 - Recognition and Measurement of Financial Instruments", and the difference between its fair value and book value at the date of loss of control shall be recognized in profit or loss for the current period.

If the Company's shareholding ratio decreases due to capital increases by other investors, resulting in the loss of control but still enabling joint control or significant influence over the invested entity, the Company shall recognize its share of the net assets increased by the invested entity due to the capital increase based on the new shareholding ratio. The difference between this share and the original book value of the long-term equity investment corresponding to the decreased shareholding ratio shall be recorded in profit or loss for the current period. Subsequently, adjustments shall be made using the equity method as if the new shareholding ratio had been applied from the time of investment acquisition.

The unrealized internal transaction losses and gains between the Company and its associated enterprises and joint ventures are calculated based on the shareholding ratio and attributed to the Company. The investment losses and gains are recognized on an offset basis. Any losses resulting from transactions between the Company and its investees, which are attributable to asset impairment losses are not eliminated.

(1) Basis for determining existence of control, joint control or significant influence over investees

Joint control is the agreed sharing of control over an arrangement, and the decision of activities relating to such arrangement requires the unanimous consent of the Company and other parties sharing control. In determining whether joint control exists, the first step is to assess whether all participating parties or a combination of participating parties collectively control the arrangement. The second step is to determine whether decisions regarding the relevant activities of the arrangement must be unanimously agreed upon by these collectively controlling parties. If all participating parties or a group of participating parties must act in unison to decide on the relevant activities of an arrangement, it is considered that all participating parties or a group of participating parties collectively control the arrangement. If there are two or more combinations of participating parties capable of collectively controlling an arrangement, it does not constitute joint control. When determining whether joint control exists, protective rights enjoyed are not considered.

Significant influence is the power to participate in making the decisions on financial and operating policies of the investee, but is not control or joint control over making those policies. When determining whether the investor can exert significant influence on the invested entity, the consideration includes the voting shares directly or indirectly held by the investor in the invested entity, as well as the impact of the current executable potential voting rights held by the investor and other parties after assuming that they are converted into equity in the invested entity, including the impact of the current convertible warrants, share options, and convertible corporate bonds issued by the invested entity.

When the Company directly or indirectly, through its subsidiaries, holds more than 20% (inclusive) but less than 50% of the voting shares of the invested entity, it is generally considered to have significant influence over the invested entity, unless there is clear evidence indicating that it cannot participate in the production and operation decisions of the invested entity in such circumstances and does not exert significant influence. When the Company holds less than 20% (exclusive) of the voting shares of the invested entity, it is generally not considered to have significant influence over the invested entity, unless there is clear evidence indicating that it can participate in the production and operation decisions of the invested entity in such circumstances and exert significant influence.

(2) Impairment testing method and impairment provision method

The method for calculating asset impairment for investments in subsidiaries, associates, and joint ventures is provided in the Note V. 30.

23. Investment properties

The measurement mode of investment property

The measurement by the cost method

Depreciation or amortization method

Investment property refers to real estate held for the purpose of generating rentals or capital appreciation, or both. The investment properties of the Company include land use rights that have been leased out, land use rights held for transfer after appreciation, and buildings that have been leased out.

The investment properties of the Company are initially measured at their acquisition costs and are subject to depreciation or amortization on a regular basis in accordance with the relevant provisions for fixed assets or intangible assets. The estimated useful lives, the net residual values that are expressed as a percentage of cost and the annual depreciation (amortization) rates of investment properties are as follows:

CategoryEstimated useful livesEstimated net residual values (%)Annual depreciation (amortization) rates (%)
House and building20 to 40 years54.75 to 2.38
Land-use rights50 to 60 years02 to1.67

The investment property’s estimated useful life, estimated net residual value and depreciation (amortization) method applied are reviewed and adjusted as appropriate at each year-end.

When an investment property is transferred to owner-occupied property, it is reclassified to fixed asset and intangible assets with the carrying amounts determined at the carrying amounts of the investment property at the date of the transfer. An investment property is derecognised on disposal or when the investment property is permanently withdrawn from use and no future economic benefits are expected from its disposal. The net amount of proceeds from sale, transfer, retirement or damage of an investment property after its carrying amount and related taxes and expenses is recognised in profit or loss for the current period.

For investment properties measured using the cost model, the method for calculating asset impairment is provided in Note V.30

24.Fixed assets

(1) Recognition and initial measurement of fixed assets

The fixed assets of the company refer to tangible assets held for the purpose of producing goods, providing services, leasing, or business management, with a service life exceeding one accounting year, including buildings, power generation equipment, motor vehicles, and other equipment.

Fixed assets are recognised when it is probable that the related economic benefits will flow into the Group and the costs can be reliably measured.

Fixed assets purchased or constructed by the Group are initially measured at cost at the time of acquisition. The fixed assets contributed by the State shareholders at the reorganization of the Company into a corporation entity are recognised based on the evaluated amounts approved by the state-owned assets administration department.

Subsequent expenditures incurred for a fixed asset are included in the cost of the fixed asset when it is probable that the associated economic benefits will flow to the Group and the related cost can be reliably measured. The carrying amount of the replaced part is derecognised. All the other subsequent expenditures are recognised in profit or loss for the period in which they are incurred.

(2) Depreciation methods

CategoryThe method for depreciationExpected useful life (Year)Estimated residual valueDepreciation
House and buildingStraight-line method10 to 50 years5%9.50% to 1.90%
Generation equipmentStraight-line method5 to 30 years0% to 5%20% to 3.17%
Transportation equipmentStraight-line method5 to 10 years0% to 5%20% to 9.50%
Other equipmentStraight-line method5 to 22 years0% to 5%20% to4.32%

The Company adopts the straight-line method for depreciation accrual. Depreciation is accrued for fixed assets from the time they reach their intended usable condition and ceases when they are derecognized or classified as non-current assets held for sale.

Except for fixed assets purchased using work safety funds, other fixed assets are depreciated using the straightline method to allocate the cost of the assets to their estimated net residual values over their estimated useful lives. For the fixed assets that have been provided for impairment loss, the related depreciation charge is prospectively determined based upon the adjusted carrying amounts over their remaining useful lives.

The impairment test method and impairment provision method for fixed assets are described in Note V.30. At the end of each year, the Company reviews the useful life, estimated net residual value, and depreciation method of its fixed assets.

Disposals of fixed assets

A fixed asset is derecognised on disposal or when no future economic benefits are expected from its use or disposal. The amount of proceeds from disposals on sale, transfer, retirement or damage of a fixed asset net of its carrying amount and related taxes and expenses is recognised in profit or loss for the current period.

25.Construction in progress

26.Borrowing costs

(1) Recognition principle for capitalization of borrowing costs

The borrowing costs incurred by the Company, which can be directly attributed to the acquisition, construction, or production of assets eligible for capitalization, shall be capitalized and included in the cost of the relevant assets. Other borrowing costs shall be recognized as expenses based on their actual amount at the time of occurrence and included in profit or loss for the current period. Borrowing costs that meet the following conditions shall commence capitalization:

① Asset expenditure has already occurred, which includes expenditure incurred in the form of cash payments, transfers of non-cash assets, or the assumption of interest-bearing debts for the acquisition, construction, or production of assets eligible for capitalization;

② The borrowing costs have already been incurred;

③ The acquisition, construction, or production activities necessary to prepare the asset for its intended use or sale have commenced.

(2) Capitalization period of borrowing costs

When the assets eligible for capitalization acquired, constructed, or produced by the company reach the expected usable or marketable state, the capitalization of borrowing costs ceases. Borrowing costs incurred after the assets eligible for capitalization reach the expected usable or marketable state are recognized as expenses based on their actual amount at the time of occurrence and recorded profit or loss for the current period.

Capitalization of borrowing costs is suspended during periods in which the acquisition or construction of an asset is interrupted abnormally and the interruption lasts for more than 3 months, until the acquisition or construction is resumed; borrowing costs incurred during normal interruptions shall continue to be capitalized.

(3) Calculation method for capitalization rate and capitalization amount of borrowing costs

The amount of interest expenses actually incurred on special borrowings in the current period, after deducting the interest income earned on the unused borrowing funds deposited in the bank or the investment income earned from temporary investments, shall be capitalized. For general borrowings, the capitalization amount shall be determined by multiplying the weighted average of asset expenditures exceeding the special borrowings by the capitalization rate of the general borrowings used. The capitalization rate shall be calculated and determined based on the weighted average interest rate of the general borrowings.

During the capitalization period, the exchange differences on foreign currency specific borrowings are fully capitalized; the exchange differences on foreign currency general borrowings are recorded profit or loss for the current period.

During the capitalization period, the exchange differences on foreign currency specific borrowings are fully capitalized; the exchange differences on foreign currency general borrowings are recorded profit or loss for the current period.

27.Biological Assets

Not applicable

28.Oil & Gas assets

Not applicable

29. Intangible assets

(1) Service life and its determination basis, estimation, amortization method or review procedure

The intangible assets of the company primarily comprise land use rights, sea area use rights, rights to use supporting power transmission and transformation projects, software, non-patented technology, and others.

Intangible assets are initially measured at cost, and their useful lives are assessed upon acquisition. If the useful life is finite, an amortization method that reflects the expected realization of economic benefits related to the asset is adopted, starting from the point when the intangible asset is ready for use, and amortization is carried out over the expected useful life. If the expected realization method cannot be reliably determined, the straightline method is used for amortization. Intangible assets with an uncertain useful life are not amortized. The amortization method for intangible assets with limited service life is as follows:

CategoryExpected useful lives (years)Amortization methodNotes
Land-use rights20 to 70 yearsStraight line methodIf the cost of purchasing land and buildings cannot be reasonably allocated between the land use rights and the buildings, the entire amount shall be treated as fixed assets. For allocated land with an uncertain useful life, no amortization shall be accrued.
Sea use rights25 to 50 yearsStraight line method
Other intangible assets2 to 60 yearsStraight line method

At the end of each year, the Company reviews the useful life and amortization method of intangible assets with a limited useful life. If the review results in a difference from previous estimates, the original estimates are adjusted and treated as a change in accounting estimates.

If it is estimated on the balance sheet date that an intangible asset can no longer bring future economic benefits to the enterprise, the entire book value of the intangible asset shall be transferred to profit or loss for the current period.

The method for calculating asset impairment for intangible assets is provided in Note V.30.

(2)Collection scope of R&D expenditure and related accounting treatment methods

The expenditure on an internal research and development project is classified into expenditure on the research phase and expenditure on the development phase based on its nature and whether there is material uncertainty that the research and development activities can form an intangible asset at the end of the project.

Expenditure on the research phase is recognised in profit or loss in the period in which it is incurred. Expenditure on the development phase is capitalized only if all of the following conditions are satisfied:

management intends to complete the intangible asset, and use or sell it;

it can be demonstrated how the intangible asset will generate economic benefits: products with the application of intangible assets or the intangible assets themselves can prove to have market value, intangible assets for internal use application can prove to be of usefulness;

there are adequate technical, financial and other resources to complete the development and the ability to use or sell the intangible asset;

it is technically feasible to complete the intangible asset so that it will be available for use or sale; and

the expenditure attributable to the intangible asset during its development phase can be reliably measured.

Other development expenditures that do not meet the conditions above are recognised in profit or loss in the period in which they are incurred. Development costs previously recognised as expenses are not recognised as an asset in a subsequent period. Capitalized expenditure on the development phase is presented as development costs in the balance sheet and transferred to intangible assets at the date that the asset is ready for its intended use.

30. Impairment of long-term assets

The impairment of assets such as long-term equity investments in subsidiaries, associates, and joint ventures, investment properties measured using the cost model, fixed assets, construction in progress, right-of-use assets, intangible assets, goodwill, etc. (excluding inventories, deferred tax assets, and financial assets) shall be determined according to the following methods:

On the balance sheet date, we assess whether there are any indications that assets may be impaired. If there are such indications, the company will estimate their recoverable amounts and conduct an impairment test. Impairment tests are conducted annually for goodwill formed through business combinations, intangible assets with uncertain useful lives, and intangible assets that have not yet reached their intended use, regardless of whether there are any indications of impairment.

The recoverable amount is determined based on the higher of the net amount after deducting disposal expenses from the fair value of the asset and the present value of the expected future cash flows of the asset. The Company estimates the recoverable amount of an individual asset; if it is difficult to estimate the recoverable amount of an individual asset, the recoverable amount of the asset group to which the asset belongs is determined. The identification of an asset group is based on whether the main cash inflows generated by the asset group are independent of the cash inflows of other assets or asset groups.

When the recoverable amount of an asset or asset group is lower than its carrying amount, the Company will reduce its carrying amount to the recoverable amount, and the reduced amount will be recorded profit or loss for the current period. At the same time, a corresponding provision for asset impairment will be made.

Regarding the impairment test of goodwill, the carrying value of goodwill formed through business combinations is amortized to the relevant asset groups using a reasonable method from the acquisition date. If it is difficult to allocate to the relevant asset groups, it is amortized to the relevant combinations of asset groups. The relevant asset groups or combinations of asset groups are those that can benefit from the synergistic effects of business combinations and are not larger than the reporting segments determined by the company.

During impairment testing, if there are signs of impairment in the asset group or combination of asset groups related to goodwill, the impairment test is first conducted on the asset group or combination of asset groups excluding goodwill. The recoverable amount is calculated, and the corresponding impairment loss is recognized. Then, the impairment test is conducted on the asset group or combination of asset groups including goodwill. The book value is compared with the recoverable amount. If the recoverable amount is lower than the book value, the impairment loss of goodwill is recognized.

Once the asset impairment loss is recognized, it will not be reversed in subsequent accounting periods.

31. Long-term prepaid expenses

The long-term deferred expenses incurred by the company are priced at actual cost and amortized evenly over the expected benefit period. For long-term deferred expense items that do not benefit future accounting periods, their amortized value is fully recorded in profit or loss for the current period.

32.Constract Liabilities

See Note V (37) Revenue for details.

33. Employee benefits

(1) Short-term employee benefits

Short-term employee benefits include wages or salaries, bonus, allowances and subsidies, staff welfare, premiums or contributions on medical insurance, work injury insurance and maternity insurance, housing funds, union running costs and employee education costs and short-term paid absences. The short-term employee benefits actually occurred are recognised as a liability in the accounting period in which the service is rendered by the employees, with a corresponding charge to the profit or loss for the current period or the cost of relevant assets.

(2) Post-employment benefits

The Company classifies post-employment benefit plans as either defined contribution plans or defined benefit plans. Defined contribution plans are post-employment benefit plans under which the Company pays fixed contributions into a separate fund and will have no obligation to pay further contributions; and defined benefit plans are post-employment benefit plans other than defined contribution plans. During the reporting period, the Company’s post-employment benefits mainly include basic pensions, unemployment insurance and supplementary pensions, and all of them belong to the defined contribution plans; non-planned expenses provided to retired employees fall under defined benefit plans.

Basic pensions

The Group’s employees participate in the basic pension plan set up and administered by local authorities of Ministry of Human Resource and Social Security. Monthly payments of premiums on the basic pensions are calculated according to the bases and percentage prescribed by the relevant local authorities. When employees retire, the relevant local authorities are obliged to pay the basic pensions to them

Supplementary pensions

The Company purchases supplementary pensions for employees, and pays insurance premium according to the policies of the parent company, Guangdong Energy Group. The amounts based on the above calculations are recognised as liabilities in the accounting period in which the service has been rendered by the employees, with a corresponding charge to the profit or loss for the current period or the cost of relevant assets.

Defined benefit plan

For defined benefit plan, the Company uses the projected unit credit method and includes the obligation of the defined benefit plan in the accounting period in which the service has been rendered by the employees, with a corresponding charge to the profit or loss for the period. The cost of employee benefits arising from defined benefit plans are classified into the following parts: Service costs (including current service costs and settlement gains and losses);

Net interest on net liabilities of defined benefit plans (including interest expenses on defined benefit plan obligations); as well as remeasure the changes arising from the net liability of the defined benefit plan.

Service costs and net interest on net liabilities of defined benefit plans are recorded in profit or loss for the current period. Changes arising from the remeasurement of net liabilities of defined benefit plans, including actuarial gains or losses, are recorded in other comprehensive income.

(3) Termination benefits

The Company recognises a liability arising from compensation for termination of the employment relationship with employees, with a corresponding charge to profit or loss for the current period at the earlier of the following dates: when the Company cannot unilaterally withdraw an employment termination plan or a curtailment proposal; or when the Company recognises costs or expenses for a restructuring that involves the payment of termination benefits.

For the implementation of internal employee retirement plans, the economic compensation before the official retirement date is considered as a dismissal benefit. From the date when the employee ceases to provide services until the normal retirement date, the proposed payment of wages for early retired employees and social insurance premiums are included in profit or loss for the current period on a onetime basis. The economic compensation after the official retirement date (such as normal pension benefits) is treated as post-employment benefits.

(4)Other long-term benefits

Early retirement benefits:

The Company offers early retirement benefits to those employees who accept early retirement arrangements. The early retirement benefits refer to the salaries and social security contributions to be paid to and for the employees who accept voluntary retirement before the normal retirement date prescribed by the State, as approved by the management. The Group pays early retirement benefits to those early retired employees from the early retirement date until the normal retirement date. The Group accounts for the early retirement benefits in accordance with the treatment for termination benefits, in which the salaries and social security contributions to be paid to and for the early retired employees from the off-duty date to the normal retirement date are recognised as liabilities with a corresponding charge to the profit or loss for the current period. The differences arising from the changes in the respective actuarial assumptions of the early retirement benefits and the adjustments of benefitstandards are recognised in profit or loss in the period in which they occur. The termination benefits expected to be paid within one year from the balance sheet date are presented as Employee benefits payable.

34. Provisions

If the obligations related to contingencies simultaneously meet the following conditions, the Company will recognize them as provisions:

(1) This obligation is a present obligation undertaken by the Company;

(2) It is probable that an outflow of economic benefits will be required to settle the obligation;

(3) The amount of the obligation can be reliably measured.

A provision is initially measured at the best estimate of the expenditure required to settle the related present obligation. Factors surrounding a contingency, such as the risks, uncertainties and the time value of money, are taken into account as a whole in reaching the best estimate of a provision. Where the effect of the time value of money is material, the best estimate is determined by discounting the related future cash outflows. The carrying amount of provisions is reviewed at each balance sheet date and adjusted to reflect the current best estimate.

If the expenditure required to settle the confirmed provisions is expected to be fully or partially compensated by a third party or other parties, the compensation amount can only be separately recognized as an asset when it is virtually certain that it will be received. The recognized compensation amount shall not exceed the book value of the confirmed liability.

35. Share payment

Not applicable

36. Other financial instruments such as preferred stocks and perpetual bonds

Not applicable

37. Revenue

Accounting policies adopted for income recognition and measurement

(1) General principles

The Company recognizes revenue when it has fulfilled its performance obligations under the contract, that is, when the customer obtains control over the relevant goods or services.

If a contract contains two or more performance obligations, the Company, on the contract start date, allocates the transaction price to each individual performance obligation based on the relative proportion of the separate selling prices of the goods or services promised under each individual performance obligation, and measures revenue based on the transaction price allocated to each individual performance obligation.

When one of the following conditions is met, it is considered fulfilling the performance obligation within a certain time period; otherwise, it is considered fulfilling the performance obligation at a certain point in time:

①Customers obtain and consume the economic benefits brought by the company's performance while the company is fulfilling its contract. ② Customers have the ability to control the goods that are in progress during the company's fulfillment process. ③ The goods produced by the company during the performance of the contract have irreplaceable uses, and the company has the right to collect payments for the accumulated performance completed to date throughout the contract period.

For performance obligations that are fulfilled within a certain period, the Company recognizes revenue based on the progress of fulfillment during that period. When the progress of fulfillment cannot be reasonably determined, if the costs already incurred by the Company are expected to be compensated, revenue is recognized at the amount of the costs already incurred until the progress of fulfillment can be reasonably determined.

For performance obligations that are fulfilled at a certain point in time, the Company recognizes revenue at the point when the customer obtains control over the relevant goods or services. In determining whether the customer has obtained control over the goods or services, the Company considers the following indicators:

①The company has a current right to receive payment for the goods or services, which means the customer has a current obligation to pay for the goods.

② The company has transferred the legal ownership of the product to the customer, meaning that the customer now holds the legal ownership of the product.

③ The company has transferred the physical possession of the product to the customer, meaning that the customer has physically taken possession of the product.

④ The company has transferred the significant risks and rewards of ownership of the goods to the customer, meaning that the customer has assumed the significant risks and rewards of ownership of the goods.

⑤ The customer has accepted the product or service.

⑥ Other signs indicating that the customer has obtained control over the goods.

(2) Specific methods

When the customer obtains control over the relevant goods or services, the company recognizes revenue based on the expected amount of consideration it is entitled to receive.

①Revenue from sale of electricity and heat energy Revenue is recognised when electricity and heat energy are supplied to grid companies or customers, and they obtain control over electricity. ② Revenue from sale of byproducts

Revenue from the sale of goods is recognised when the Company transfers by-products (such as coal ash) produced by electricity generations to the designated delivery place pursuant to the contract or agreement, the resource utilization enterprise confirms receipt and obtains control over the by-products.

③ Provision of electric power transaction service

For the electric power transaction service provided by the Company to external parties, upon the receipt of the service, revenue is recognised based on the difference between the purchase price and the selling price of electricity

④ Rendering of services

The Company provides maintenance services to external clients, and recognizes revenue over a period of time based on the progress of the services completed. The progress of the completed services is determined by the proportion of incurred costs to the estimated total costs. On the balance sheet date, the company re-estimates the progress of the completed services to reflect changes in performance.

When recognizing revenue based on the progress of completed labor services, the Company recognizes the portion for which it has obtained unconditional rights to receive payment as accounts receivable, and the remaining portion as contract assets. Loss provisions are recognized for accounts receivable and contract assets based on expected credit losses ,for details, please refer to(Note V5 (11)). If the contract price received or receivable by the Company exceeds the labor services completed, the excess is recognized as contract liabilities. The Company presents contract assets and contract liabilities under the same contract on a net basis.

Contract costs include contract performance costs and contract acquisition costs. The costs incurred by the Company for providing maintenance services are recognized as contract performance costs, and are carried forward and included in the main business costs based on the progress of the completed services when revenue is recognized.

38. Contract Costs

Contract costs include incremental costs incurred for obtaining the contract and contract performance costs.

Incremental costs incurred to obtain a contract refer to costs that would not have been incurred if the company did not obtain the contract (such as sales commissions). If such costs are expected to be recoverable, the company recognizes them as contract acquisition costs and recognizes them as an asset. Other expenses incurred by the company to obtain a contract, other than the incremental costs expected to be recoverable, are recognized in profit or loss for the period when they are incurred.

For costs incurred in the performance of a contract, if they do not fall within the scope of other enterprise accounting standards such as inventories and simultaneously meet the following conditions, the company recognizes them as contract performance costs and recognizes them as an asset:

① The costs are directly attributable to a contract or an anticipated contract, including direct labor, direct materials, overheads (or similar expenses), costs that are explicitly chargeable to the customer, and other costs that are incurred solely in connection with the contract;

② The costs enhance the Company's future resources for fulfilling its performance obligations; ③ The costs are expected to be recovered.

Assets recognized for costs of obtaining a contract or costs to fulfill a contract (hereinafter referred to as "assets related to contract cost") shall be amortized on the same basis as revenue recognition of goods or services related to such assets and recognized into profit or loss for the current period when incurred.

When the carrying amount of an asset related to contract costs exceeds the difference between the following two items, the Company makes an impairment provision for the excess and recognizes it as an asset impairment loss:

① The remaining consideration that the Company expects to receive in exchange for the goods or services to which the asset relates;

② The costs to be incurred for the transfer of the relevant goods or services

39. Government grants

Government subsidies are recognized when the conditions attached to the subsidies are met and the subsidies can be received. For government subsidies for monetary assets, they are measured at the received or receivable amount.

For government subsidies for non-monetary assets, they are measured at fair value; if the fair value cannot be reliably obtained, they are measured at a nominal amount of 1 yuan.

Government subsidies related to assets refer to those obtained by the company and used for the acquisition, construction, or formation of long-term assets through other means; otherwise, they are considered government subsidies related to income.

For government documents that do not explicitly specify the recipients of subsidies, if the subsidy can form long-term assets, the portion of the government subsidy corresponding to the asset value shall be regarded as government subsidies related to assets, and the remaining portion shall be regarded as government subsidies related to income; if it is difficult to distinguish, the entire government subsidy shall be regarded as government subsidies related to income.

Government subsidies related to assets are recognized as deferred income and are recorded in profit or loss over the useful life of the relevant assets using a reasonable and systematic method.

Government subsidies related to income, which are used to compensate for related costs or losses already incurred, are recorded in the current profit or loss. Those used to compensate for related costs or losses in future periods are recorded in deferred income and are recorded in the current profit or loss during the period when the related costs or losses are recognized.

Government subsidies measured at their nominal amounts are directly recorded in the current profit or loss. The Company adopts a consistent approach to handling the same or similar government subsidy transactions. Government subsidies related to daily activities are recorded in other income based on the substance of the economic transaction. Government subsidies unrelated to daily activities are recorded in no operating income.

When confirmed government subsidies need to be returned, if the book value of the relevant assets was offset during initial recognition, the book value of the assets should be adjusted. If there is a balance of related deferred income, the book balance of the related deferred income should be offset, and the excess should be recorded in profit or loss for the current period. In other cases, it should be directly recorded in t profit or loss for the current period.

40. Deferred tax assets and deferred tax liabilities

Income tax comprises current income tax and deferred income tax. Except for the adjusted goodwill arising from business combinations or the deferred income tax related to transactions or events directly recognized in owner's equity, which is recorded in owner's equity, all other income taxes are recognized as income tax expenses and recorded in profit or loss for the current period.

The Company recognizes deferred income tax using the balance sheet liability method based on the temporary differences between the carrying amount of assets and liabilities at the balance sheet date and their tax bases.

The deferred income tax liabilities are recognized for all taxable temporary differences, unless the taxable temporary difference arises from the following transactions:

(1) Initial recognition of goodwill, or initial recognition of assets or liabilities arising from transactions that meet the following criteria: the transaction is not a business combination, and at the time of occurrence, it neither affects accounting profit nor affects taxable income (except for individual transactions where the initially recognized assets and liabilities result in equal amounts of taxable temporary differences and deductible temporary differences);

(2) For taxable temporary differences related to investments in subsidiaries, joint ventures, and associated enterprises, the timing of the reversal of such temporary differences can be controlled, and it is likely that such temporary differences will not reverse in the foreseeable future.

For deductible temporary differences, deductible losses that can be carried forward to future years, and tax credits, the Company recognizes the resulting deferred tax assets to the extent that it is likely to obtain future taxable income that can be used to offset the deductible temporary differences, deductible losses, and tax credits, unless the deductible temporary differences arise from the following transactions:

(1) The transaction is not a business combination, and at the time of transaction, it neither affects accounting profit nor affects taxable income (except for individual transactions where the initial recognition of assets and liabilities results in equal amounts of taxable temporary differences and deductible temporary differences);

(2) For deductible temporary differences related to investments in subsidiaries, joint ventures, and associated enterprises, corresponding deferred tax assets are recognized when both of the following conditions are met: the temporary differences are likely to be reversed in the foreseeable future, and it is likely that future taxable income will be available to offset the deductible temporary differences.

On the balance sheet date, the Company measures deferred tax assets and deferred tax liabilities at the tax rate applicable during the expected period of asset recovery or liability settlement, and reflects the income tax impact of the expected asset recovery or liability settlement method on the balance sheet date.

On the balance sheet date, the Company reviews the carrying amount of deferred tax assets. If it is likely that sufficient taxable income will not be available in future periods to offset the benefit of the deferred tax asset, the carrying amount of the deferred tax asset is reduced. When sufficient taxable income is likely to be available, the reduced amount is reversed.

On the balance sheet date, deferred tax assets and deferred tax liabilities are presented at the net amount after offsetting when both of the following conditions are met:

(1) The taxable entity within the company has the statutory right to settle current income tax assets and current income tax liabilities on a net basis;

(2) Deferred tax assets and deferred tax liabilities are related to income taxes levied by the same tax authority on the same taxable entity within the company.

41. Leases

(1) The Group as the lessee

At the lease commencement date, the Company recognises the right-of-use asset and measures the lease liability at the present value of the lease payments that are not paid at that date. Lease payments include fixed payments, the exercise price of a purchase option or termination penalty if the lessee is reasonably certain to exercise that option etc. Variable lease payments in proportion to sales are excluded from lease payments and recognised in profit or loss as incurred. Lease liabilities that are due within one year (inclusive) as from the balance sheet date are included in the current portion of noncurrent liabilities. Right-of-use assets of the Group comprise leased land use rights, buildings, machinery and equipment, and motor vehicles.

Right-of-use assets are measured initially at cost which comprises the amount of the initial measurement of lease liabilities, any lease payments made at or before the commencement date and any initial direct costs, less any lease incentives received. If there is reasonable certainty that the Group will obtain ownership of the underlying asset by the end of the lease term, the asset is depreciated over its remaining useful life; otherwise, the asset is depreciated over the shorter of the lease term and its remaining useful life. The carrying amount of the right-of-use asset is reduced to the recoverable amount when the recoverable amount is below the carrying amount. .For details,please refer to NoteIII.30.

For short-term leases with a term of 12 months or less and leases of an individual asset (when new) of low value, the Company chooses to include the lease payments in the cost of the underlying assets or in the profit or loss for the current period on a straight-line basis over the lease term, instead of recognizing right-of-use assets and lease liabilities.

The Group accounts for a lease modification as a separate lease if both:

① The modification increases the scope of the lease by adding the right to use one or more underlying assets;

② The consideration for the lease increases by an amount commensurate with the stand-alone price for the increase in scope and any appropriate adjustments to that stand-alone price to reflect the circumstances of the contract.

When lease modifications are not accounted for as a separate lease, except for contract modifications that can adopt a simplified method as stipulated by the Ministry of Finance, the company redetermines the lease term on the effective date of the lease modification, and uses the revised discount rate to discount the lease payment amount after modification, thereby remeasuring the lease liability. If the lease modification results in a reduction in the scope of the lease or a shortened lease term, the company correspondingly reduces the book value of the right-to-use asset and includes the related gains or losses from partial or complete termination of the lease in profit or loss for the current period.

For other lease modifications that result in a remeasurement of the lease liability, the company correspondingly adjusts the book value of the right-to-use asset. For eligible rent reductions agreed upon in existing lease contracts, the Company opts to adopt a simplified approach. Upon reaching an agreement to terminate the original payment obligation, the undiscounted amount of the reduction is recorded in profit or loss for the current period, and the lease liability is adjusted accordingly.

(2)The Group as the lessor

Leases that have essentially transferred almost all risks and rewards related to the ownership of the leased asset are classified as financial leases. Other leases are classified as operating leases. Operating leases Where the Company leases out self-owned buildings and land use rights under operating leases, rental income there from is recognised on a straight-line basis over the lease term. Variable rental that is linked to a certain percentage of sales is recognised in rental income as incurred.

For the qualified rent concessions agreed on existing lease contracts, the Company applies the practical expedient to account for the concessions as variable lease payments and record the concessions in profit or loss during the waiving period

Except that the above changes in qualified contract which are accounted for by applying the practical expedient, for a lease modification, the Company accounts for it as a new lease from the effective date of the modification, and considers any lease payments received in advance and receivable relating to the lease before modification as receivables of the new lease

42. Other significant accounting policies and estimates

(1)Work safety funds

In accordance with relevant regulations, the Company allocates work safety funds in accordance with the "Administrative Measures for the Allocation and Use of Work Safety Expenses in Enterprises" (Cai Zi [2022] No. 136). Subsidiaries engaged in power generation business shall appropriate work safety funds based on the actual revenue in the previous year and at the following percentages:

 3% for the proportion of revenue up to RMB 10 million in the previous year;

 1.5% for the proportion of revenue between RMB 100 million and RMB 1 billion in the previous year;

 1% for the proportion of revenue between RMB 100 million and RMB 1 billion in previous year;

 0.8% for the proportion of revenue between RMB 1 billion and RMB 5 billion in the previous year;

• 0.6% for the proportion of revenue between RMB5,000 million and RMB10,000 million in the previous year;

 0.2% for the proportion of revenue exceeding RMB 10 billion in the previous year.

Work safety funds are recognised in profit or loss as the "Specific reserve" item for the current period when appropriated.

When using the special reserve, if the expenditures are expenses in nature, the expenses incurred are offset against the specific reserve directly when incurred. If they result in the formation of fixed assets, the incurred expenditures shall first be collected under the "Construction in Progress" account. Once the safety project is completed and reaches its intended usable state, the fixed assets shall be recognized. Simultaneously, the special reserves shall be offset against the cost of forming the fixed assets, and the accumulated depreciation of the same amount shall be recognized. No further depreciation shall be accrued for this fixed asset in subsequent periods.

(2)Carbon emission use rights

Categorized as an Enterprise with High Emissions, the Group needs to fulfill its emission reduction obligations and recognise carbon emission related assets and expenditures per relevant regulations:

(i) The present obligations incurred by the Group in fulfilling its emission reduction obligations are measured at the best estimate of the expenditure required and recognised as other payables and non-operating expenses.

(ii) The Group purchases carbon emission allowances and recognises related carbon emission rights assets based on the cost paid or payable at the acquisition date, and the balance is included in other current assets; the Group makes no accounting treatment for carbon emission allowances purchased at nil consideration;

(iii) The Group uses the purchased carbon emission allowances to fulfill its emission reduction obligations and recognises the book balance of the allowances used as a reduction of carbon emission rights assets; the Group makes no accounting treatment if it uses carbon emission allowances purchased at nil consideration to fulfill its obligations;

(iv) The Group sells carbon emission allowances and recognises related non-operating income or nonoperating expenses based on the difference between the amount received or receivable at the date of sale and the book balance of the allowances sold

(3)Segment information

The Group identifies operating segments based on the internal organisation structure, management requirements and internal reporting system, and discloses segment information of reportable segments which is determined on the basis of operating segments.

An operating segment is a component of the Group that satisfies all of the following conditions: (a) the component is able to earn revenue and incur expenses from its ordinary activities; (b) whose operating results are regularly reviewed by the Group’s management to make decisions about resources to be allocated to the segment and to assess its performance, and (c) for which the information on financial position, operating results and cash flows is available to the Group. Two or more operating segments that have similar economic characteristics and satisfy certain conditions can be aggregated into one single operating segment.

(4)Critical accounting estimates and judgements

The Group continually evaluates the critical accounting estimates and key judgements applied based on historical experience and other factors, including expectations of future events that are believed to be reasonable under the circumstances.

(a)Critical judgements in applying the accounting policies

(i) Classification of financial assets

Significant judgements made by the Group in the classification of financial assets include analysis on business models and contractual cash flow characteristics.

The Group determines the business model for financial asset management at the level of different groups, and factors to be considered include the methods of evaluation on financial asset performance and reporting of financial asset performance to key management personnel, risks affecting financial asset performance and management methods for such risks, the ways in which related business management personnel are remunerated, etc.

When assessing whether contractual cash flow characteristics of financial assets are consistent with basic lending arrangement, key judgements made by the Group include: the possibility of changes in timing or amount of the principal during the duration due to reasons such as early repayment; whether interest only include time value of money, credit risks, other basic lending risks and considerations for costs and profits. For example, whether the amount of prepayment only reflects the principal outstanding and the interest based on the principal outstanding, as well as the reasonable compensation due to the early termination of the contract.

(ii) Determination of significant increase in credit risk

When the Group classifies financial instruments into different stages, its criteria for significant increase in credit risk and credit-impaired are as follows:

Judgement of the Group for significant increase in credit risk is mainly based on whether one or more of the following indicators changed significantly: business environment of the debtor, internal and external credit rating, significant changes in actual or expected operating results, significant decrease in value of collateral or credit rate of guarantor, etc.

Judgement of the Group on the occurred credit impairment is mainly based on whether it meets one or more of the following conditions: the debtor is suffering significant financial difficulties, engaged in other debt restructuring, or it is probable that the debtor will enter bankruptcy, etc.

(iii) Timing of revenue recognition

With regard to sale of electricity to grid companies, the Group supplies electricity to grid companies in accordance with the contract. Thereafter, the grid companies have the right to sell electricity and the discretion in pricing, and take the risks of any price fluctuation or loss of the products. The Group believes that the grid companies obtain control over electric power upon the receiving of the electric power. Therefore, revenue is recognised upon the receiving of the electric power of grid companies.

(b) Critical accounting estimates and key assumptions

(i) Assessment on impairment of fixed assets

A fixed asset is tested for impairment by the Group if there is any indication that it may be impaired at the balance sheet date by calculating and comparing the recoverable amount of the fixed asset with its carrying amount to check the difference. If the result of the impairment test indicates that the recoverable amount of an asset is less than its carrying amount, a provision for impairment and an asset impairment loss are recognised for the amount by which the asset’s carrying amount exceeds its recoverable amount. The recoverable amount is the higher of an asset’s fair value less costs to sell and the present value of the future cash flows expected to be derived from the asset. The determination of the recoverable amount involves accounting estimates.

When assessing whether the above assets are impaired, management mainly evaluates and analyses: (i) whether events affecting asset impairment occurred; (ii) whether the present value of expected cash flows arising from the continuing use or disposals of the asset is lower than its carrying amount; and (iii) whether the significant assumptions used in the calculation of the present value of the estimated cash flows are appropriate

The calculation of the present value of future cash flows involves management’s significant estimates and judgements, including the discount rate, the growth rate of the estimated on-grid electricity price, the growth rate of the estimated electricity sale and the variability rate of the estimated price of coal used in power generation. Changes in these assumptions may have material impact on the present value used in the impairment test, and cause impairment in the above-mentioned long-term assets of the Group

(ii) Measurement of ECL

The Group calculates ECL through exposure at default and ECL rates, and determines the ECL rates based on probability of default and loss given default. In determining the ECL rates, the Group uses data such as internal historical credit loss experience, etc., and adjusts historical data based on current conditions and forward-looking information.

When considering forward-looking information, the Group considered different macroeconomic scenarios. Significant macroeconomic assumptions and parameters related to the estimation of ECL include the risk of economic downturn, external market environment, technological environment, changes in customer conditions, Gross Domestic Product (“GDP”) and Consumer Price Index (“CPI”), etc. The Group regularly monitors and reviews assumptions and parameters related to the calculation of ECL

(iii) Income taxes and deferred income taxes

The Group is subject to income taxes in numerous jurisdictions. There are some transactions and events for which the ultimate tax determination is uncertain during the ordinary course of business. Significant judgement is required from the Group in determining the provision for income tax in each of these jurisdictions. Where the final tax outcomes of these matters are different from the amounts that were initially recorded, such differences will impact the income tax and deferred income tax provisions in the period in which such determination is made.

As stated in Note 6, some subsidiaries of the Group are high-tech enterprises. The high-tech enterprise certificate is effective for three years. Upon expiration, application for high-tech enterprise identification should be submitted again to the relevant government authorities. Based on the historical experience of reassessment for high-tech enterprise upon expiration and the actual condition of the subsidiaries, the Group considers that the subsidiaries are able to obtain the qualification for high-tech enterprises in future years, and therefore a preferential tax rate of 15% is used to calculate the corresponding deferred income tax. If some subsidiaries cannot obtain the qualification for high-tech enterprise upon expiration, then the subsidiaries are subject to a statutory tax rate of 25% for the calculation of the income tax, which further influences the recognised deferred tax assets, deferred tax liabilities and income tax expenses.

A deferred tax asset is recognised for the carry forward of unused deductible losses to the extent that it is probable that future taxable profits will be available against which the deductible losses can be utilised. Future taxable profits include taxable profits that can be achieved through normal operations and the increase in taxable profits due to the reversal of taxable temporary differences arising from previous period in future period. The Group determines the future taxable profits based on the future financial forecast, which requires management’s significant estimates and judgements, including the estimated electricity sale, estimated on-grid electricity price, the estimated price of coal used in power generation and other operating expenses. If there is any difference between the actual and the estimates, adjustment may be made to the carrying amount of deferred tax assets.

43.Change of main accounting policies and estimations

(1)Change of main accounting policies

□Applicable <sup></sup>Not applicable

(2) Change of main accounting estimations

√Applicable□ Not applicable In RMB

Contents and reasons for changes in accounting estimatesNames of significantly affected financial statement itemsEffective date of applicationImpact amount
Pursuant to the provisions of the "Accounting Standards for Business Enterprises No. 4 – Fixed Assets", an enterprise shall, at least at the end of each annual year, review the useful lives, estimated residual values, and depreciation methods of its fixed assets. In order to more objectively and accurately reflect the Company's asset usage conditions and operating results, and to meet the needs of the Company's business development and fixed asset management, the Company, based on the current usage status and designed useful lives of its fixed assets, and taking into account industry conditions, reviewed and reassessed the estimated useful lives of its natural gas turbines andrelated equipment. Given that, compared with the depreciation policies of comparable listed companies in the industry, and in light of the actual usage of the Company's assets, the current depreciation lives of the Company's natural gas turbines and related equipment are relatively low. Therefore, in order to more fairly and accurately reflect the impact of fixed assets on the Company's operating results, the Company plans to adjust the depreciation lives of its natural gas turbines and related equipment.Fixed assetApril 1,2026119,011,499
Business costApril 1,2026-119,011,499
Income tax expenseApril 1,202610,576,766
Net profit attributable to shareholders of the parent companyApril 2,202671,665,679

The specific depreciation lives before and after the change are as follows:

Fixed asset categoryDepreciation life before adjustment (years)Depreciation life after adjustment (years)
Natural gas turbines and related equipment1320

(3)The information of the adjusting items related to the financial statements at the beginning of the year of first implementation due to the first implementation of new accounting standards from 2026.Adjustment description

□Applicable√ Not applicable

44.Other

Not applicable

VI. Taxation

1. Main categories and rates of taxes

Class of taxTax basisTax rate
VATTaxable value-added amount (Tax payable is calculated using the taxable sales amount multiplied by the applicable tax rate less deductible VAT input of the current period) Revenue from hydropower sales3%,5%,6%,9% and 13%
City maintenance and construction taxAmount of VAT paid5% to7%
Corporate income taxTaxable income12.5%,15%,20% and 25%
Education surchargesAmount of VAT paid3%
Local education surchargesAmount of VAT paid2%
House property taxProperty's rental income or the residual value from original value less the deducting proportion12% and 1.2%
Environmental protection taxCalculated and paid based on the pollution equivalent values or the discharge of taxable pollutants multiplied by the applicable tax amountsCalculated and paid based on the applicable tax amounts of different pollutants
In case there exist any taxpayer paying corporate income tax at different tax rates, disclose the information
Name of taxpayerIncome tax rates
Guangdong Yudean Zhanjiang Biomass Power Generation Co., Ltd.15%
Guangdong Wind Power Generation Co., Ltd.15%

2. Tax preference

Corporate income tax incentives

Pursuant to the approval documents (Cai Shui [2008] No. 46 and Guo Shui Fa [2009] No. 80), the Company and several subsidiaries are approved to engage in wind power projects and photovoltaic projects since 1 January 2008 and are exempted from enterprise income tax in the first three years counting from the year when revenue from production and operations of those projects is recorded for the first time, and can enjoy half rate reduction in the following three years (“three-year exemptions and three-year halves”).

Pursuant to the Supplementary Notice on Issues Concerning the Preferential Enterprise Income Tax Policies for Public Infrastructure Projects (Cai Shui [2014] No. 55), enterprises invest and operate public infrastructure projects in compliance with the List of Public Infrastructure Projects Enjoying Enterprise Income Tax Preferential, those which adopt one-off approval and are subject to construction in batches (such as terminals, berths, airport terminals, runways, sections, generator units, etc.) are subject to income tax calculated in units of each batch and enjoy the tax preferential policy of “three-year exemptions and three-year halves” when the following conditions are satisfied: (i) different batches are space-independent; (ii) each batch has its own revenue function; (iii) they are accounted for in units of each batch and are subject to income tax individually, while the period expenses are allocated rationally.

The subsidiaries which enjoy this tax preference as listed as below

NameProject nameThe first year of generating operating income
Guangdong Yudean Qujie Wind Power Generation Co., LtdQujiewai Luo Hai Wind Power Project Phase II2021
Guangdong Yudean Qujie Wind Power Generation Co., LtdXinliao Offshore Wind Power Project2021
Guangdong Yudean Pingyuan Wind Power Co., LtdPingyuan Sishui Project2021
Guangdong Yudean Zhanjiang Wind Power Generation Co., LtdZhanjiang Linfen Hongdong Photovoltaic Project2023
LaiShui LiNeng New Energy Technology Co., LtdLaishui 80MW Photovoltaic Power Generation Project2024
Lan Shan Yue Feng New Energy Co., LtdAgricultural-Photovoltaic Complementary Photovoltaic Project in Lanshannan City2024
Xiangzhou Yunjiang New Energy Co., LtdXiangzhou Yunjiang Wind-Solar-Storage Integrated Project Phase III2025
Xiangzhou Hangjing New Energy Co., LtdXiangzhou Hangjing Photovoltaic Integrated Project Phase II2025
Guangneng Toksun New Energy Power Co., Ltd.Guangdong Energy Toksun County 1,000 MW Wind Power Project2025
Baiyin Yuefeng New Energy Co., Ltd.Jingyuan 100,000 KW Wind Power Project2026

In 2022, the Group's subsidiaries, Zhanjiang Wind Power and Biomass Power Generation, obtained the "Hightech Enterprise Certificate" (certificate numbers GR202244006758 and GR202244008597) jointly issued by the Guangdong Provincial Department of Science and Technology, the Guangdong Provincial Department of Finance, and the Guangdong Tax Service under the State Taxation Administration. The certificate is valid for 3 years and was issued on December 22, 2022. According to Article 28 of the "Enterprise Income Tax Law of the People's Republic of China", the applicable enterprise income tax rate for Zhanjiang Wind Power and Biomass Power Generation from 1 January 2026 to 30 June 2026 is 15%.

In 2024, the Group's subsidiary, Guangdong Wind Power, obtained the "High-tech Enterprise Certificate" (Certificate No. GR202444008116) jointly issued by the Guangdong Provincial Department of Science and Technology, the Guangdong Provincial Department of Finance, and the Guangdong Provincial Tax Service of the State Taxation Administration. The certificate is valid for 3 years and was issued on December 11, 2024. According to Article 28 of the "Enterprise Income Tax Law of the People's Republic of China", the applicable enterprise income tax rate for Guangdong Wind Power from 1 January 2026 to June 2026 is 15%.

According to the approval provided in Announcement No. 6 of 2023 by the State Taxation Administration, Announcement of the Ministry of Finance and the State Taxation Administration on Preferential Income Tax Policies for Small and Micro Enterprises and Self-Employed Individuals, for small and micro-profit enterprises with annual taxable income not exceeding 1 million yuan, the taxable income shall be calculated at a reduced rate of 25%, and the enterprise income tax shall be paid at a rate of 20%. The aforementioned small and micro enterprises refer to those engaged in industries not restricted or prohibited by the state, and simultaneously meeting three conditions: (1) annual taxable amount do not exceed RMB 3 million, (2) number of employees do not exceed 300 staffs, and (3) total assets do not exceed RMB50 million. Certain subsidiaries of the Company enjoy the above tax benefits from 1 January 2026 to June 2026.

According to the Notice on Issues Concerning the Implementation of the Preferential Income Tax Catalogue for Enterprises Engaged in Comprehensive Resource Utilization (Cai Shui [2008] No. 47), from January 1, 2008, enterprises that use resources listed in the Preferential Income Tax Catalogue for Enterprises Engaged in Comprehensive Resource Utilization as their main raw materials to produce products that meet relevant national or industry standards within the aforementioned catalogue will have their income calculated at a reduced rate of 90% for the total income of the enterprise for the current year. The subsidiaries of our group, Zhanjiang Electric Power Co., Ltd. and Guangdong Huizhou Pinghai Power Generation Co., Ltd., use fly ash to produce commercial fly ash, which meets the aforementioned preferential income tax conditions for comprehensive resource utilization and will enjoy the aforementioned tax benefits from 1 January 2026 to June 2026.

According to the "Notice of the Ministry of Finance and the State Administration of Taxation on Issues Concerning the Implementation of the Preferential Income Tax Catalogue for Enterprises Using Specialized Equipment for Environmental Protection, the Preferential Income Tax Catalogue for Enterprises Using Specialized Equipment for Energy and Water Conservation, and the Preferential Income Tax Catalogue for Enterprises Using Specialized Equipment for Safe Production" (Cai Shui [2008] No. 48), enterprises that purchase and actually use specialized equipment for environmental protection, energy and water conservation, and safe production within the scope of the "Preferential Income Tax Catalogue for Enterprises Using Special

In RMB

Equipment for Environmental Protection", the "Preferential Income Tax Catalogue for Enterprises Using Special Equipment for Energy and Water Conservation", and the "Preferential Income Tax Catalogue for Enterprises Using Specialized Equipment for Safe Production" from January 1, 2008, can offset 10% of the investment amount in specialized equipment against the current year's enterprise income tax payable. If the current year's enterprise income tax payable is less than 10% of the investment amount, it can be carried forward to future years but the carry-forward period shall not exceed five taxable years. Some subsidiaries of the group enjoy the above tax benefits from 1 January 2026 to June 2026.

 VAT tax incentives

Pursuant to Announcement No. 10 in 2025 of the State Taxation Administration, the "Announcement on Adjusting Value-Added Tax Policies for Wind Power Generation, etc.", a policy of immediate VAT refund at 50% is applied to the sale of self-produced electricity generated from offshore wind power by taxpayers. The Group's subsidiaries, Guangdong Energy Qingzhou Offshore Wind Power Co., Ltd., Guangdong Yuedean Zhuhai Offshore Wind Power Co., Ltd., and Guangdong Yuedean Yangjiang Offshore Wind Power Co., Ltd., enjoyed the above tax incentives from January to June 2026.

3.Other

Not applicable

VII. Notes on major items in consolidated financial statements

1. Monetary funds

In RMB

ItemYear-end balanceYear-beginning balance
Cash on hand31,70036,244
Cash at bank1,655,900,5251,537,957,020
Other cash balance30,192,65425,738,324
Deposit funds from the financial company14,170,100,21413,275,888,592
Total15,856,225,09314,839,620,180
Including: total overseas deposits00

Other note

As of June 30, 2026, the Group had no funds deposited overseas (December 31, 2025: None).

As of June 30, 2026, Other monetary funds amounted to RM30,192,654 (On December 31, 2025: RMB25,738,324), which mainly are deposits such as ecological protection deposits and performance guarantee deposits.

2. Transactional financial assets

ItemYear-end balanceYear-beginning balance
Including :
Including :
Total00

3. Derivative financial assets

In RMB

ItemYear-end balanceYear-beginning balance
Total00

4. Notes receivable

(1) Notes receivable listed by category

In RMB

ItemYear-end balanceYear-beginning balance
Bank acceptance700,0000
Total700,0000

(2)By accrual of bad debt provision

In RMB

CategoryAmount in year-endBalance Year-beginning
Book BalanceBad debt provisionBook valueBook BalanceBad debt provisionBook value
AmountProportion (%)AmountProportion (%)AmountProportion (%)AmountProportion (%)
Of which
Notes receivable for bad debt provision by portfolio700,000100%00%700,00000%00%0
Of which
Note receivable portfolio700,000100%00%700,00000%00%0
Total700,000100%00%700,00000%00%0

Name of bad debt provision by portfolio: portfolio of notes receivable

In RMB

NameYear-end balance
Book BalanceBad debt provisionProportion(%)
Portfolio of notes receivable700,00000%
Total700,0000

Note:

None

If the provision for bad debts of notes receivable is made in accordance with the general model of expected credit losses, please refer to the disclosure of other account receivable to disclose related information about baddebt provisions:

□Applicable <sup></sup>Not applicable

(3) Bad debt provision accrual, collected or reversal in the period

Accrual of bad debt provision in the period:

None

Including important amount of bad debt provision collected or reversal in the period:

□Applicable <sup></sup>Not applicable

(4) Note receivable pledged at period-end

None

(5) Note receivable which have endorsed and discount at period-end and has not expired on balance sheet date

None

(6) Note receivable actually written-off in the period

None

5. Account receivable

(1) Accounts receivable disclosed by category

In RMB

AgingAmount in year-endBalance Year-beginning
Within 1 year (Including 1 year)7,561,269,1157,369,698,391
1-2 years1,379,441,5111,457,893,486
2-3 years880,705,778570,345,518
Over 3 year695,112,288228,531,999
3-4 years531,550,61891,034,702
4-5 years56,301,68672,734,446
Over 5 years107,259,98464,762,851
Total10,516,528,6929,626,469,394

(2) According to the bad debt provision method classification disclosure

In RMB

CategoryAmount in year-endBalance Year-beginning
Book BalanceBad debt provisionBook valueBook BalanceBad debt provisionBook value
AmountProportion(%)AmountProportion(%)AmountProportion(%)AmountProportion(%)
Of which
Accrual of bad debt provision by portfolio10,516,528,692100%47,586,0280.45%10,468,942,6649,626,469,394100%43,284,4890.45%9,583,184,905
Of which
Electricity sales receivable10,333,909,57798.26%39,922,7230.39%10,293,986,8549,481,647,76598.50%35,903,2820.38%9,445,744,483
Related party receivable40,874,9830.39%00%40,874,98348,322,0280.50%00%48,322,028
Steam sale and other receivable141,744,1321.35%7,663,3055.41%134,080,82796,499,6011%7,381,2077.65%89,118,394
Total10,516,528,692100%47,586,0280.45%10,468,942,6649,626,469,394100%43,284,4890.45%9,583,184, 905

Accrual of bad debt provision by portfolio::Electricity sales receivable

In RMB

NameClosing balance
Book balanceBad debt provisionProportion%
Electricity sales receivable10,333,909,57739,922,7230.39%
Total10,333,909,57739,922,723

Note:

Portfolio 1.As at 30 June 2026, the Group’s receivables from sale of electricity amounted to RMB 10,333,909,577 (31 December 2025:RMB 9,481,647,765), which mainly comprised receivables of RMB 10,173,762,353 from China Southern Power Grid Co., Ltd. and its subsidiaries (collectively referred to as “China Southern Power Grid”) and RMB 153,040,515 from State Grid Corporation of China (“State Grid”) and its subsidiaries. Considering the favorable credit history of China Southern Power Grid and State Grid, is the amount that should be collected from Inner Mongolia Electric Power (Group) Co., Ltd.

Receivables for electricity sales, including general electricity sales proceeds and receivables for renewable energy subsidies;

Considering the favorable credit history of China Southern Power Grid and State Grid, the Group held that there was no significant credit risk arising from receivables from sale of electricity. Since the possibility of material losses due to the default by China Southern Power Grid and State Grid was extremely low, the Group made no provision for the ECL of the receivables from sale of electricity (31 December 2025: Nil)

For the receivables of renewable energy subsidies, the Group has made provision for bad debts based on the expected credit loss model, the balance of which is RMB39,922,723 as of June 30, 2026(31 December 2025: RMB35,903,282)

On 30 June 2026, the right to collect electric charges of the Group’s certain subsidiaries, was pledged to banks to obtain long-term borrowings with a principal of RMB3,606,305,646, including current portion of longterm borrowings with a principal of RMB373,905,838. (December 31, 2025: longterm borrowings with a principal of RMB3,935,009,425, including current portion of long-term borrowings with a principal of RMB456,142,964.).

Accrual of bad debt provision by portfolio: Related party receivable

In RMB

NameClosing balance
Book balanceBad debt provisionProportion%
Related party receivable40,874,98300%
Total40,874,9830

Note:

Portfolio 2:- Related party receivable:As at 30 June 2026, the amount of receivables from related parties of the Group was RMB40,874,983(December 31,2025:RMB48,322,028) , and the historical loss rate was extremely low. Therefore, The Group believes that there is no significant credit risk in the receivables from related parties, and the possibility of significant losses due to their default is extremely low. The Group's expected credit loss rate for receivables from related parties is 0%. (December 31,2025:0%).

Accrual of bad debt provision by portfolio: Steam sale and other receivable

In RMB

NameClosing balance
Book balanceBad debt provisionProportion%
Steam sale and other receivable141,744,1327,663,3055.41%
Total141,744,1327,663,305

Note:

Portfolio 3- For other fund receivable except Portfolio 1 and Portfolio 2, Bad provision according to the expected credit loss mode

Relevant information of the provision for bad debts will be disclosed with reference to the disclosure method of other receivables if the provision for bad debts of bills receivable is accrued according to the general model of expected credit loss:

□Applicable <sup></sup>Not applicable

(3) Accounts receivable withdraw, reversed or collected during the reporting period

The withdrawal amount of the bad debt provision:

In RMB

CategoryOpening balanceAmount of change in the current periodClosing balance
AccrualReversed or collected amountWrite-offOther
Account receivable43,284,4894,338,37036,8310047,586,028
Total43,284,4894,338,37036,8310047,586,028

Including important amount of bad debt provision collected or reversal in the period:

None

(4) Account receivables actually write-off during the reporting period

None

(5) Accounts receivable and contract assets of the top five ending balances collected by debtor

In RMB

Unit nameEnding balance of accounts receivableEnding balance of contract assetsEnding balance of accounts receivable and contract assetsProportion of total ending balance of accounts receivable and contract assetsEnding balance of bad debt provision for accounts receivable and impairment provision for contract assets
GPGC10,051,344,821010,051,344,82196.01%39,666,713
Shenzhen Power supply Bureau100,474,0280100,474,0280.96%0
State Grid Xinjiang Electric Power Co., Ltd.74,918,749074,918,7490.72%0
ExxonMobil (Huizhou) Chemical Co., Ltd34,833,813034,833,8130.33%348,338
State Grid Henan Electric Power Co., Ltd.27,372,849027,372,8490.26%256,010
Total10,288,944,260010,288,944,26098.28%40,271,061

6.Contract assets

(1) Contract asset

In RMB

ItemsClosing balanceOpening balance
Book balanceProvision for inventory impairmentBook valueBook balanceProvision for inventory impairmentBook value
Accounts receivable from related parties214,2700214,270874,7680874,768
Other contract asset payments15,9843515,94926,3451,26725,078
Total230,25435230,219901,1131,267899,846

(2) The significant amount change in book value during the reporting period and its reason

None

(3) By accrual of bad debt provision

In RMB

CategoryClosing balanceOpening balance
Book balanceBad debt provisionBook valueBook balanceBad debt provisionBook value
AmountProportion %AmountProportion %AmountProportion %AmountProportion %
Of which
Accrual of bad debt provision by portfolio230,254100%350.02%230,219901,113100%1,2670.14%899,846
Of which
Related party receivable214,27093.06%00%214,270874,76897.08%00%874,768
Other contract asset payments15,9846.94%350.22%15,94926,3452.92%1,2674.81%25,078
Total230,254100%350.02%230,219901,113100%1,2670.14%899,846

Accrual of bad debt provision by portfolio: Related party receivable

In RMB

NameClosing balance
Book balanceBad debt provisionProportion%
Related party receivable214,27000%
Total214,2700

Note:

Portfolio 1:- Related party receivable:As at 30 June 2026, the amount of receivables from related parties of the Group was RMB214,270(December 31,2025:RMB874,768) , and the historical loss rate was extremely low. Therefore, The Group believes that there is no significant credit risk in the receivables from related parties, and the possibility of significant losses due to their default is extremely low. The Group's expected credit loss rate for receivables from related parties is 0%. (December 31,2025:0%).

Accrual of bad debt provision by portfolio: Other contract asset payments

In RMB

NameClosing balance
Book balanceBad debt provisionProportion%
Other contract asset payments15,984350.22%
Total15,98435

Note Portfolio 2- For other contract asset payments except Contract assets other than portfolio 1.

Provision for bad debts is made according to the general model of expected credit losses

□Applicable <sup></sup>Not applicable

(4) Bad debt provision accrual, collected or reversal in the period

In RMB

ItemAccrualCollected or reversalWrite offReason
Other contract asset payments01,2320Partial receipts in the current period
Total01,2320

Thereinto, the important amount of bad debt provision recovered or reversed in the current period: None

(5) Contract assets actually written off in the current periodNone None

6、Contract assets

(1) Classification of receivables financing

None

(2) According to the bad debt provision method classification disclosure None

(3) Bad debt provision accrual, collected or reversal in the period None

(4)Financing of accounts receivable pledged by the Company at the end of the period None

(5)Financing of accounts receivable that have been endorsed or discounted by the Company at the end of the period and have not yet matured on the balance sheet date

None

(6) Financing situation of accounts receivable actually written off in this period None

(7) Changes in accounts receivable financing and fair value changes in the current period None

(8)Other note

None

8. Other account receivable

In RMB

ItemsClosing balanceOpening balance
Interest receivable00
Dividend receivable195,124,9640
Other accounts receivable509,273,455527,513,970
Total704,398,419527,513,970

(1) Interest receivable

1) Category

None

2) Important overdue interest

None

3) Accrual of bad debt provision

□Applicable <sup></sup>Not applicable

4) Bad debt provision accrual, collected or reversal in the period

None

5)Interest receivable actually written off in the current period

None

(2) Dividend receivable

1) Category

In RMB

Item (or the invested entity)Closing balanceOpening balance
Guangdong Guohua Yudean Taishan Power Generation Co., Ltd.100,480,9290
Sunshine insurance66,500,0000
Shenneng Co., Ltd25,544,8350
Shenzhen Energy Group2,419,2000
GMGITC180,0000
Total195,124,9640

2) Important dividend receivable with over one year aged

None

3) Accrual of bad debt provision

□Applicable <sup></sup>Not applicable

4) Bad debt provision accrual, collected or reversal in the period

None

5) Dividends receivable actually written off in the current period

None

(3) Other accounts receivable

1) Other accounts receivable classified by the nature of accounts

In RMB

NatureClosing book balanceOpening book balance
Land receivable deposit124,994,352129,994,352
Related party receivable104,027,971149,546,884
Supplementary medical insurance fund receivable94,156,113107,422,266
Land receivable deposit27,178,68027,178,680
Compensation receivable for electricity charges during the demolition and construction period14,198,40014,198,400
Current account93,870,87173,550,152
Other118,828,39890,728,812
Less: Bad-debt provision-67,981,330-65,105,576
Total509,273,455527,513,970

2) Disclosure by aging

AgingClosing book balanceOpening book balance
Within 1 year(Including 1 year)191,377,048208,124,629
1-2 years40,990,04972,391,679
2-3 years68,370,78634,402,258
Over 3 years276,516,902277,700,980
3-4 years15,819,36628,042,645
Total27,300,12771,672,003
233,397,409177,986,332
577,254,785592,619,546

In RMB

3)According to the bad debt provision method classification disclosure Bad-debt provision

<sup></sup>Applicable □Not applicable

In RMB

CategoryClosing balanceOpening balance
Book balanceBad debt provisionBook valueBook balanceBad debt provisionBook value
AmountProportion %AmountProportion %AmountProportion %AmountProportion %
Accrual of bad debt provision by single430,150,36874.52%40,803,7349.49%389,346,634487,881,38282.33%40,803,7348.36%447,077,648
Of which
Accrual of bad debt provision by portfolio147,104,41725.48%27,177,59618.48%119,926,821104,738,16417.67%24,301,84223.20%80,436,322
Of which
Other Portfolio147,104,41725.48%27,177,59618.48%119,926,821104,738,16417.67%24,301,84223.20%80,436,322
577,254,785100%67,981,33011.78%509,273,455592,619,546100%65,105,57610.99%527,513,970

Accrual of bad debt provision by portfolio: Accrual of bad debt provision by single In RMB

NameOpening balanceClosing balance
Book balanceBad debt provisionBook balanceBad debt provisionProportion%Reason
Land withdrawal receivable129,994,3520124,994,35200%The counterparty is a government unit and the risk of ECL is extremely low
Receivables from related parties149,546,8840104,027,97100%The other party is an affiliated party. The historical loss rate is 0, and the risk of ECL is extremely low.
Supplementary medical insurance fund receivable107,422,266094,156,11300%The counterparty is Taikang Pension, which mainly provides custody services for the Group's supplementary medical insurance fund. The historical loss rate is 0, and the risk of ECL is extremely low
Land deposits receivable27,178,680027,178,68000%The counterparty is a government unit and the risk of ECL is extremely low
Compensation receivable for electricity charges during the demolition and construction period14,198,400014,198,40000%The demolition and construction project is initiated by the government-owned industrial park, which pays compensation expenses, and the risk of ECL is extremely low.
Other government payments receivable18,737,066024,791,11800%The counterparty is a government uni, The historical loss rate is 0, and the risk of ECL is extremely low.
Other40,803,73440,803,73440,803,73440,803,734100%Due to the financial difficulties of the other party, it is expected that the funds cannot be recovered.
Total487,881,38240,803,734430,150,36840,803,734

Accrual of bad debt provision by portfolio: Other portfolio

In RMB

NameClosing balance
Book balanceBad debt provisionProportion%
Other portfolio147,104,41727,177,59618.48%
Total147,104,41727,177,596

Note:

Provision for bad debts is made according to the general model of expected credit losses

In RMB

Bad Debt ReservesStage 1Stage 2Stage 3Total
Expected credit losses over the next 12 monthsExpected credit loss over life (no credit impairment)Expected credit losses for the entire duration (credit impairment occurred)
Balance as at January 1, 202624,301,84240,803,73465,105,576
Balance as at January 1, 2026 in current
Provision in Current Year2,991,7052,991,705
Reversal in Current Year-115,951-115,951
Balance as at 30 June. 202627,177,59640,803,73467,981,330

Basis for division of each stage and accrual ratio for bad-debt provision Loss provision changes in current period, change in book balance with significant amount □ Applicable √Not applicable

4) Accounts receivable withdraw, reversed or collected during the reporting period

The withdrawal amount of the bad debt provision:

In RMB

CategoryOpeningAmount of change in the current periodClosing balance
balanceAccrualReversed or collected amountWrite-offOther
Other receivable65,105,5762,991,705115,9510067,981,330
Total65,105,5762,991,705115,9510067,981,330

Important amount of bad debt provision switch-back or collection in the period: None

5) Other account receivables actually write-off during the reporting period

None

6)Top 5 of the closing balance of the other accounts receivable collected according to the arrears party In RMB

NameNatureYear-end balanceAgingPortion in total other receivables(%)Bad debt provision of year-end balance
Meixian Chengjiangzhen People's Government of Meizhou CityLand withdrawal receivable121,885,400Over 5 years21.11%
Taikang PensionSupplementary medical insurance fund receivable94,156,113Within 5 years16.31%
Guangdong Electric Power Industry Fuel Co., Ltd.Accounts Receivable for Coal Settlements45,721,636Within 3 years7.92%
Guangdong Yudean Environmental Protection Co., Ltd.Receivables from sale of by-products to related parties29,024,166Within 1 year5.03%
Guangdong Hongyu Smart Energy Co., Ltd.Accounts Receivable from Units28,000,000Within 1 year4.85%
Total318,787,31555.22%

7) Other receivables reported due to centralized management of funds

Other note:None

9. Accounts paid in advance

(1) Accounts paid in advance by ageing

In RMB

Account ageEnding balanceOpening balance
AmountRatioAmountRatio
Within 1 year1,677,318,53297.33%938,091,78296.30%
1-2 years16,065,4350.93%32,732,2013.36%
2-3 years28,132,4131.63%1,864,0920.19%
Over 3 years1,867,1020.11%1,436,8780.15%
Total1,723,383,482974,124,953

Notes of the reasons of the prepayment ages over 1 year with significant amount but failed settled in time As at June 30,2026, advances to suppliers aged more than 1 year were RMB46,064,950( December 31,2025, RMB36,033,171) , mainly including prepayments for spare parts and materials.

(2)The ending balance of Prepayments owed by the imputation of the top five parties

NameRelationship with the companyAmountProportion %
Guangdong Electric Power Industry Fuel Co., Ltd.Related party780,750,00045.30%
China National Petroleum Corporation (CNPC) Natural Gas Sales Guangdong BranchThird party236,581,17813.73%
Guangdong Zhutou Electric Power fuel Co., Ltd.Third party108,056,4986.27%
Hubei Carbon Emission Rights Trading Center Co., Ltd.Third party64,100,6673.72%
Carbon Emission Rights Registration and Settlement (Wuhan) Co., Ltd.Third party62,289,4833.61%
Total1,251,777,82672.63%

10. Inventories

Whether the company need to comply with the disclosure requirements of the real estate industry No

(1)Category of Inventory

In RMB

ItemClosing book balanceOpening book balance
Book balanceProvision for inventory impairmentBook valueBook balanceProvision for inventory impairmentBook value
Raw materials3,999,806,27266,124,6273,933,681,6452,361,946,44669,179,1862,292,767,260
Other415,161415,1611,052,5351,052,535
Total4,000,221,43366,124,6273,934,096,8062,362,998,98169,179,1862,293,819,795

(2)Data resources recognized as inventory

In RMB

ItemsInventory ofoutsourced data resourcesInventory of selfprocessed data resourcesInventory of dataresources obtained by other meansTotal
1. Ending book value0
2. Beginning book value0

(3) Inventory depreciation reserve

In RMB

Item Raw materials msBeginning of termIncreased in current periodDecreased in current periodYear-end balance
ProvisionOtherTransferred backOther
Raw materials69,179,1863,054,55966,124,627
Total69,179,1863,054,55966,124,627

Provision for inventory price decline that is made on a portfolio basis

None

(4) The explanation of the ending balance of the inventory contains the capitalized amount of borrowing costs

Not applicable

(5) Explanation of the amortization amount of contract performance costs for the current period

11. Assets held for sale

None

12. Non-current asset due within one year

None

(1) Debt investment due within one year

□Applicable <sup></sup>Not applicable

(2)Other Debt investment due within one year

□Applicable <sup></sup>Not applicable

13. Other current assets

In RMB

ItemsYear-end balanceYear-beginning balance
Contract acquisition cost00
Cost of returned goods receivable00
Compensatory assets00
VAT to be deducted2,324,121,1502,354,384,466
Advance tax payment16,626,28471,607,948
Carbon emission rights assets13,573,1932,218,624
Other165,6612,121
Total2,354,486,2882,428,213,159

Other note:None

14. Debt investment

(1)Debt investment

None

(2) Important debt investment

None

(3) Accrual of impairment provision

None

(4) Information of debt investment actually written off in the current period

None

Information of write-off of important debt investments thereinto.

Debt Investment Write-off Explanation:

Change of book balance of loss provision with amount has major changes in the period

□Applicable <sup></sup>Not applicable

15. Other debt investment

None

16. Other equity instruments investment In RMB

Item nameBeginning balanceGains included in other comprehensive income in the current periodLosses included in other comprehensive income in the current periodGains accumulated in other comprehensive income at the end of the current periodLosses accumulated in other comprehensive income at the end of the current periodDividend income recognized in the current periodEnding balanceReason designated as being measured at fair value and change being included in other comprehensive income
Shenneng Co., Ltd432,040,90652,755,6370248,958,555025,544,835484,796,543The Group has not participated in or influenced the financial and business decisions of the above-mentioned investee in any way. Therefore, the Group has no significant impact on the above-mentioned investee, and uses it as other equity instruments for investment accounting.
Sunshine Insurance Group Co., Ltd.1,226,572,7600192,998,260677,574,500066,500,0001,033,574,500The Group has not participated in or influenced the financial and business decisions of the above-mentioned investee in any way. Therefore, the Group has no significant impact on the above-mentioned investee, and uses it as other equity instruments for investment accounting.
Shenzhen Capital Group Co., Ltd.1,232,000,00000903,966,000028,208,7461,232,000,000The Group has not participated in or influenced the financial and business decisions of the above-mentioned investee in any way. Therefore, the Group has no significant impact on the above-mentioned investee, and uses it as other equity instruments for investment accounting.
Other119,076,222011,912,40184,873,19302,599,200107,163,821The Group has not participated in or influenced the financial and business decisions of the above-mentioned investee in any way. Therefore, the Group has no significant impact on the above-mentioned investee, and uses it as

Guangdong Electric Power Development Co., Ltd. The Semi-annual Report 2026

other equity instruments for investment accounting.
Total3,009,689,88852,755,637204,910,6611,915,372,2480122,852,7812,857,534,864

Derecognition incurred in the current period

None

Itemized disclosure of the current non - trading equity instrument investment In RMB

NameRecognized dividend incomeAccumulating gainsAccumulating lossesAmount of other comprehensive income transferred to retained earningReasons for being measured at fair value and whose changes are included in other comprehensive incomeReasons for other comprehensive income transferred to retained earnings
Shenneng Co., Ltd25,544,835248,958,55500Consideration of strategic investmentsNot applicable
Sunshine Insurance Group Co., Ltd.66,500,000677,574,50000Consideration of strategic investmentsNot applicable
Shenzhen Capital Group Co., Ltd.28,208,746903,966,00000Consideration of strategic investmentsNot applicable
Other2,599,20084,873,19300Consideration of strategic investmentsNot applicable

Not Applicable

18. Long-term equity investment In RMB

Invested enterpriseBeginning balanceImpairment provision begin- year balanceChanges in Current periodEnding balanceBalance at year-end of impairment
Additional investmentDisinvestmentInvestment profit and loss confirmed by equity methodOther comprehensive income adjustmentOther changes of equityDeclaration of cash dividends or profitsProvision for impairmentOther
I. Joint ventures
Guangdong Electric Industrial Fuel Co., Ltd.1,406,595,154000115,658,49803,421,68218,821,800001,506,853,5340
Zhonghang Shenxin172,808,867000-69,71700000172,739,1500
Yuexin Eenergy1,307,114000-2,556,19200000-1,249,0780
Subtotal1,580,711,135000113,032,58903,421,68218,821,800001,678,343,6060
II. Associates
Shanxi Yudean Energy4,182,897,544000110,730,9310915,8120004,294,544,2870
Taishan Power Generation2,073,641,46800077,777,54704,141,772100,480,929002,055,079,8580
Energy Group Finance Company1,807,009,66000083,944,1210056,883,689001,834,070,0920
Guangdong Energy Financing Leasing Co., Ltd.844,967,2780009,793,39900000854,760,6770
Yudean Captive321,210,1850004,582,8370230,3881,729,74000324,293,6700
Yueqian Electric Power276,842,07800011,309,42002,262,65724,022,38300266,391,7720
Yudean Shipping146,631,60700017,800,215-972,047191,343000163,651,1180
Weixin Yuntou0122,614,153000000000122,614,153
South Offshore Wind Power Joint Development Co., Ltd.220,232,8580004,146,23600000224,379,0940
Guangdong Energy Enterprise Services27,032,82400027,1310029,5420027,030,4130
Other62,279,58220,819,28000-349,7520000061,929,83020,819,280
Subtotal9,962,745,084143,433,43300319,762,085-972,0477,741,972183,146,2830010,106,130,811143,433,433
Total11,543,456,219143,433,43300432,794,674-972,04711,163,654201,968,0830011,784,474,417143,433,433

The recoverable amount is determined on the basis of the net amount of fair value less disposal costs □Applicable <sup></sup>Not applicable

The recoverable amount is determined by the present value of the projected future cash flows □Applicable <sup></sup>Not applicable

19. Other non-current financial assets

None

20. Investment property

(1) Investment property adopted the cost measurement mode √Applicable □ Not applicable In RMB

ItemsHouse, BuildingLand use rightConstruction in processTotal
I. Original price
1. Balance at period-beginning477,406,09946,042,801523,448,900
2.Increase in the current period0000
(1) Purchase0000
(2)Inventory\Fixed assets\ Transferred from construction in progress0000
(3)Increased of Enterprise Combination0000
3.Decreased amount of the period0000
(1) Dispose0000
(2) Other out0000
4.Balance at period-end477,406,09946,042,8010523,448,900
II.Accumulated amortization
1.Opening balance184,913,91614,757,5000199,671,416
2.Increased amount of the period3,646,457452,06804,098,525
(1) Withdrawal3,646,457452,06804,098,525
3.Decreased amount of the period0000
(1) Dispose0000
(2) Other out0000
4.Balance at period-end188,560,37315,209,568203,769,941
III. Impairment provision
1.Balance at period-beginning0000
2.Increased amount of the period0000
(1) Withdrawal0000
3.Decreased amount of the period0000
(1) Dispose0000
(2) Other out0000
4.Balance at period-end000
IV.Book value
1.Book value at period-end288,845,72630,833,2330319,678,959
2.Book value at period-beginning292,492,18331,285,3010323,777,484

The recoverable amount is determined on the basis of the net amount of fair value less disposal costs

□Applicable <sup></sup>Not applicable

The recoverable amount is determined by the present value of the projected future cash flows

□Applicable <sup></sup>Not applicable

The reason for the obvious discrepancy between the foregoing information and the information used in the impairment test of previous years or the external information

The reason for the obvious discrepancy between the information used in the Company's impairment test in previous years and the actual situation in the current year

Other note

(2) Investment real estate measured at fair value

□Applicable <sup></sup>Not applicable

(3) Converted to investment real estate and measured at fair value

None

(4)Investment real estate without property rights certificate

None

21. Fixed assets

In RMB

ItemClosing balanceOpening balance
Fixed assets100,862,040,63585,751,864,102
Disposal of fixed assets147,932,046144,693,413
Total101,009,972,68185,896,557,515

(1) List of Fixed assets

In RMB

ItemHouse and buildingGeneration equipmentTransportationsOther equipmentTotal
I. Original price
1. Balance at period-beginning41,255,569,042123,998,563,796817,979,9962,286,594,330168,358,707,164
2.Increase in the current period885,722,87717,738,416,37319,352,95820,953,36218,664,445,570
(1) Purchase5,057,273101,885,3816,531,93714,094,552127,569,143
(2) Transferred from construction in progress880,665,60417,636,530,99212,821,0216,858,81018,536,876,427
(3)Increased of Enterprise Combination00000
3.Decreased amount of the period44,929,222253,103,8561,287,37655,663,232354,983,686
(1) Dispose44,929,222253,103,8561,287,37655,663,232354,983,686
4. Balance at period-end42,096,362,697141,483,876,313836,045,5782,251,884,460186,668,169,048
II. Accumulated depreciation
1.Opening balance15,307,376,28563,081,025,774530,852,8901,355,546,39180,274,801,340
2.Increased amount of the period533,135,5952,719,285,84524,630,32073,016,0193,350,067,779
(1) Withdrawal533,135,5952,719,285,84524,630,32073,016,0193,350,067,779
3.Decreased amount of the period25,924,01358,528,721928,73045,599,622130,981,086
(1) Dispose25,924,01358,528,721928,73045,599,622130,981,086
4.Closing balance15,814,587,86765,741,782,898554,554,4801,382,962,78883,493,888,033
III. Impairment provision
1.Opening balance945,250,0381,381,539,3011,212,4654,039,9182,332,041,722
2.Increase in the reporting period00000
(1) Withdrawal00000
3.Decreased amount of the period640,75218,617,8770542,71319,801,342
(1) Dispose640,75218,617,8770542,71319,801,342
4. Closing balance944,609,2861,362,921,4241,212,4653,497,2052,312,240,380
IV. Book value
1.Book value of the period-end25,337,165,54474,379,171,991280,278,633865,424,467100,862,040,635
2.Book value of the period-begin25,002,942,71959,535,998,721285,914,641927,008,02185,751,864,102

(2) Fixed assets temporary idle

None

((3) Fixed assets leasing-out by operational lease

None

(4) Fixed assets without property rights certificate

ItemBook valueReasons for failing to complete the

In RMB

property rights certificate
House building4,013,450,346Temporarily in the government approval stage

Other note

After consulting the Group's legal advisers, the management believed that there would be no substantive legal obstacles to the handling of these property certificates and would not have a significant adverse impact on the normal operation of the Group.

(5) Information of impairment test of fixed assets

□Applicable <sup></sup>Not applicable

(6) liquidation of fixed assets

In RMB

ItemClosing balanceOpening balance
Generation equipment129,122,642132,906,108
Other equipment18,809,40411,787,305
Total147,932,046144,693,413

Other note

Not Applicable

22. Construction in progress

In RMB

ItemClosing balanceOpening balance
Construction in progress15,196,583,02931,568,774,393
Engineering Material93,092,01313,703,777
Total15,289,675,04231,582,478,170

(1) List of construction in progress

In RMB

ItemClosing balanceOpening balance
Book balanceProvision for impairmentBook valueBook balanceProvision for impairmentBook value
Qingzhou offshore wind power project3,966,128,01903,966,128,01913,075,502,556013,075,502,556
Bohe Power Plant Phase II Project0002,485,625,43102,485,625,431
Hongdong County100MW centralized photovoltaic power generation project000473,434,5010473,434,501
Guidian Potou120MW photovoltaic project273,276,2100273,276,210270,692,3860270,692,386
100MW Fishery-Photovoltaic Complementary Project in Qiantang, Potou, Zhanjiang City260,662,0820260,662,082257,852,6600257,852,660
Dananhai cogeneration project1,330,825,91901,330,825,9191,256,758,86301,256,758,863
Laishui Lineng Laishui County 80MW affordable on-grid price photovoltaic power generation project341,510,1260341,510,126331,106,3080331,106,308
Yunhe natural gas cogeneration project1,511,853,66701,511,853,6671,471,413,55901,471,413,559
Yahua New Energy 150MW agriculture and photovoltaic complementary new energy photovoltaic power station project333,329,3500333,329,350330,564,2400330,564,240
Wuhua Huangnizhai project241,616,1130241,616,113211,131,0190211,131,019
Jinghai Power Plant Unit 5 and 6 expansion project1,159,814,61355,389,0931,104,425,5206,339,282,46155,389,0936,283,893,368
Huadu cogeneration project13,846,520013,846,52091,404,023091,404,023
Tuokexun County 1 million kilowatt wind power project689,486,5900689,486,590831,706,9060831,706,906
Honghaiwan Unit 5 and 6 construction project1,451,111,05726,446,4471,424,664,610919,562,60226,446,447893,116,155
Huibo 100MW photovoltaic composite project296,629,8040296,629,804292,040,7450292,040,745
100MW wind power project in Wangxian Township, Wanrong County310,970,0750310,970,075304,064,8090304,064,809
ingyuan 100,000 kilowatt wind power project431,879,9290431,879,929379,930,3660379,930,366
Jinghai No. 3 and No. 4 steam turbine flow transformation project231,752,6110231,752,611165,354,9250165,354,925
Yehai Yuefeng Lingao Bohou Town 100MW Agrivoltaic Power Generation Project144,698,0270144,698,027132,801,5990132,801,599
Huizhou Advanced Materials Industrial Park Cogeneration and Cooling Project401,864,1150401,864,115320,071,7100320,071,710
Karamay Silk Road New Cloud Intelligent Computing Center Supporting Renewable Energy Project390,915,7650390,915,765377,365,2290377,365,229
Other infrastructure projects1,769,931,092273,683,1151,496,247,9771,628,275,581295,332,5461,332,943,035
Total15,552,101,684355,518,65515,196,583,02931,945,942,479377,168,08631,568,774,393

(2) Changes of significant construction in progress

In RMB

NameBudgetAmount at year beginningIncrease at this periodTransferred to fixed assetsOther decreaseBalance in year-endProportion(%)Progress of workCapitalization of interest accumulated balanceIncluding: Current amount of capitalization of interestCapitalization of interest ratio (%)Source of funds
Qingzhou offshore wind power project17,107,250,00013,075,502,55692,852,0289,202,226,56503,966,128,01981.81%99.5%702,372,41353,643,2141.81%Financial institution loan and Other
Bohe Power Plant Phase II Project7,483,510,0002,485,625,43117,293,9662,502,919,3970084.12%100%95,786,5903,015,2632.24%Financial institution loan and Other
Hongdong County100MW centralized photovoltaic power generation project516,560,000473,434,5016,837,474480,271,9750094.54%100%25,124,4721,877,9482.43%Financial institution loan and Other
Guidian Potou 120MW photovoltaic project589,200,000270,692,3862,583,82400273,276,21051.01%51.01%12,868,5061,836,1003.45%Financial institution loan and Other
100MW Fishery-Photovoltaic Complementary Project in Qiantang, Potou, Zhanjiang City500,232,000257,852,6602,809,42200260,662,08250.91%55%16,145,5592,169,7782.36%Financial institution loan and Other
Dananhai CogenerationProject2,855,450,0001,256,758,86374,067,056001,330,825,91946.90%46.90%67,427,56315,503,6461.92%Financial institutionloan and Other
Laishui Lieneng Laishui County 80MW Gridconnected Photovoltaic Power Generation Project at Parity Pricing385,279,200331,106,30810,403,81800341,510,12693.83%98%19,394,2713,528,8622.20%Financial institution loan and Other
Yunhe Natural Gas Thermal Power Cogeneration Project2,809,700,0001,471,413,55940,440,108001,511,853,66767.09%92.38%55,917,76215,583,3172.72%Financial institution loan and Other
Yahua New Energy 150MW Agrivoltaic Renewable Energy Photovoltaic Power Station Project500,000,000330,564,2402,765,11000333,329,35067%50%12,099,3431,562,2143.53%Financial institution loan and Other
Wuhua Huangni Village Project336,020,000211,131,01930,485,09400241,616,11373.61%73.61%12,360,6041,992,0523.38%Financial institution loan and Other
Expansion project of Units 5 and 6 at Jinghai Power Plant8,049,770,0006,339,282,461753,680,4295,933,148,27701,159,814,61389.18%90%132,722,44513,532,3692.50%Financial institution loan and Other
Huadu Combined3,536,710,00091,404,0234,340,95681,898,459013,846,52071.50%90%77,118,51600%Financial institution
Heat and Power Generation Projectloan and Other
1,000,000 kW Wind Power Project in Tuokexun County1,460,000,000831,706,90613,176,273155,396,5890689,486,59057.87%90%20,827,9686,673,8192.48%Financial institution loan and Other
Infrastructure construction project for units 5 and 6 at Honghai Bay7,820,820,000919,562,602532,366,069817,61401,451,111,05717.52%50%70,356,75924,634,6542.27%Financial institution loan and Other
Huibo 100MW Photovoltaic Hybrid Project651,393,000292,040,7454,589,05900296,629,80437.09%45%16,491,4352,758,3802%Financial institution loan and Other
100MW Wind Power Project in Wangxian Township, Wanrong County610,594,600304,064,8096,905,26600310,970,07551.17%73%10,344,1413,046,9692.31%Financial institution loan and Other
Jingyuan 100,000 kW Wind Power Project681,220,000379,930,36651,949,56300431,879,92963.16%98%12,857,3084,926,2832.54%Financial institution loan and Other
Flow passage renovation project for Jinghai No. 3 and No. 4 steam turbines373,000,000165,354,92566,397,68600231,752,61162.13%62.13%1,133,598626,6132.50%Financial institution loan and Other
Yehai Yuefeng Lingao BohouTown 100MW Agrivoltaic Power Generation Project560,030,000132,801,59911,896,42800144,698,02726.01%38.53%2,937,0161,724,3562.85%Financial institution loan andOther
Huizhou Advanced Materials Industrial Park Cogeneration and Cooling Project2,626,090,000320,071,71081,792,40500401,864,11515.30%25.41%4,330,4162,720,3362.92%Financial institution loan and Other
Karamay Silk Road New Cloud Intelligent Computing Center Supporting Renewable Energy Project970,000,000377,365,22913,550,53600390,915,76549.42%90%11,069,9055,390,5882.58%Financial institution loan and Other
Total60,422,828,80030,317,666,8981,821,182,57018,356,678,876013,782,170,5921,379,686,590166,746,761

(3) List of the withdrawal of the impairment provision of the construction in progress In RMB

ItemOpening balanceIncreaseDecreaseEnding balanceReason
Humen Power Plant 2*1000MW Unit Project137,373,04000137,373,040Cease construction
Impairment of projects under construction in the early stage of Jinghai unit55,389,0930055,389,093Project stagnation
Impairment of projects under construction in the early stage of Guangqian Power Phase II46,630,4540046,630,454Project stagnation
Impairment of early-stage wind power projects under construction in the province1,192,434001,192,434Project stagnation
Impairment of the Shibei Mountain Wind Turbine Project13,927,8880013,927,888Reconstruction of wind turbines
Shaoguan Nanxiong Distributed Wind Power Project2,725,732002,725,732Project stagnation
Yuehua Natural Gas Cogeneration Project – Supporting Heat Network Engineering71,428,8380071,428,838The relocation and loss of surrounding enterprises near the plant area led to a reduction in heat supply customers, resulting in the suspension of project construction
Xinhui Taishan Guanghai Bay Gas-Fired Power Project403,30200403,302Project stagnation
Bijie City Dafang County New Energy Project1,435,952001,435,952Project stagnation
Dafang County Changshi Town Shanba 80MW Agrivoltaic Power Station Project523,44700523,447Project stagnation
Qiming Natural Gas PowerGeneration Project10,513,2270010,513,227Cease construction
Other engineering projects35,624,679021,649,43113,975,248Project stagnation
Total377,168,086021,649,431355,518,655--

(4) Information of impairment test of construction in progress

□Applicable <sup></sup>Not applicable

(5) Engineering materials

In RMB

ItemsEnd of termBeginning of term
Book balanceProvision for impairmentBook valueBook balanceProvision for impairmentBook value
Engineering material93,092,01393,092,01313,703,77713,703,777
Total93,092,01393,092,01313,703,77713,703,777

23. Productive biological assets

(1) Productive biological assets measured at cost methods □ Applicable √ Not applicable

(2) Productive biological assets measured at fair value □ Applicable √ Not applicable

(3) Productive biological assets measured by fair value

□Applicable<sup></sup>Not applicable

24. Oil & Gas Assets

□ Applicable √ Not applicable

25. Right-of-use assets

(1) Right-of-use assets

In RMB

ItemLand use rightHouse and buildingsMachinery equipmentTransportation equipmentTotal
I. Original price
1.Opening balance865,357,753108,251,09812,853,342,75124,303,99113,851,255,593
2.Increased amount of the period12,260,1206,414,702224,125,9270242,800,749
(1) New lease contracts12,260,1206,414,702224,125,9270242,800,749
3. Decreased amount of the period12,389,3819,738248,859,2880261,258,407
(1) Modification of leases12,389,3819,738248,859,2880261,258,407
4.Closing balance865,228,492114,656,06212,828,609,39024,303,99113,832,797,935
II. Accumulated depreciation
1.Opening balance101,158,41349,739,3292,492,743,76611,155,6252,654,797,133
2.Increased amount of the period17,403,00113,630,830333,206,3081,747,477365,987,616
(1) Withdrawal17,403,00113,630,830333,206,3081,747,477365,987,616
3.Decreased amount of the period6,545,378013,767,513020,312,891
(1)Disposal6,545,378013,767,513020,312,891
4.Closing balance112,016,03663,370,1592,812,182,56112,903,1023,000,471,858
III. Impairment provision
1.Opening balance00000
2.Increased amount of the period00000
(1) Withdrawal00000
3.Decreased amount of the period00000
(1)Disposal00000
4.Closing balance
IV. Book value
1.Closing book value753,212,45651,285,90310,016,426,82911,400,88910,832,326,077
2.Opening book764,199,34058,511,76910,360,598,98513,148,36611,196,458,460

(2) Information of impairment test of right-of-use assets

□Applicable <sup></sup>Not applicable

Other note:

Not applicable

26. Intangible assets

(1) Information

In RMB

ItemsLand use rightPatentNon-patent TechnologySea use rightTransmission and Transformation Supporting ProjectSoftwareOtherTotal
I. Original price
1. Balance at period-beginning4,022,206,5106,717,3449,739,909552,042,028260,331,315323,493,52999,245,5605,273,776,195
2.Increase in the current period11,851,51217,500000628,5163,462,61715,960,145
(1) Purchase11,851,51217,500000628,5163,462,61715,960,145
(2) Internal R & D
(3) Increased of Enterprise Combination
3.Decreased amount of the period58,088,47100007,566,404065,654,875
(1)Dispose58,088,47100007,566,404065,654,875
4. Balance at period-end3,975,969,5516,734,8449,739,909552,042,028260,331,315316,555,641102,708,1775,224,081,465
II.Accumulated amortization
1. Balance at period-beginning860,648,5073,591,5866,085,68682,260,478260,331,315206,577,73761,646,3391,481,141,648
2. Increase in the current period43,595,622237,473298,8839,961,854010,859,1103,323,32568,276,267
(1) Withdrawal43,595,622237,473298,8839,961,854010,859,1103,323,32568,276,267
3.Decreased amount of the period15,297,90700005,772,401021,070,308
(1)Dispose15,297,90700005,772,401021,070,308
4. Balance at period-end888,946,2223,829,0596,384,56992,222,332260,331,315211,664,44664,969,6641,528,347,607
III. Impairment provision
1. Balance at period-beginning56,502,37302,460,16100448,34133,675,07693,085,951
2. Increase in the current period00000000
(1) Withdrawal00000000
3.Decreased amount of the period00000000
(1)Dispose00000000

Guangdong Electric Power Development Co., Ltd. The Semi-annual Report 2026 The intangible assets by the end of the formation of the company's internal R & D accounted of the proportion of the balance of intangible assets

4. Balance at period-end56,502,37302,460,16100448,34133,675,07693,085,951
4. Book value
1.Book value at period -end3,030,520,9562,905,785895,179459,819,6960104,442,8544,063,4373,602,647,907
2.Book value at period-beginning3,105,055,6303,125,7581,194,062469,781,5500116,467,4513,924,1453,699,548,596

(2) Data resources recognized as intangible assets

In RMB

ItemIntangible assets of outsourced data resourcesIntangible assets of self processed data resourcesIntangible assets of data resources obtained by other meansTotal
1. Ending book value0
2. Beginning book value0

(3)Details of Land use right failed to accomplish certification of property

In RMB

ItemBook valueReason
Land use right32,155,846The procedures have not been completed

Other note

(4)Information of impairment test of intangible assets

□Applicable <sup></sup>Not applicable

27. Goodwill

(1) Original book value of goodwill

In RMB

Name of the investees or the events formed goodwillOpening balanceIncreaseDecreaseClosing balance
The merger of enterprisesdisposition
Tumushuke Thermal Power Co., Ltd.119,488,67200119,488,672
Guangdong Guangye Nanhua New Energy Co., Ltd6,158,995006,158,995
Other39,372,2640039,372,264
Total165,019,93100165,019,931

(2)Impairment provision of goodwill

In RMB

Name of the investees or the events formed goodwillOpening balanceIncreaseDecreaseClosing balance
Provisiondisposition
Tumushuke Thermal Power Co., Ltd.119,488,67200119,488,672
Guangdong Guangye Nanhua New Energy Co., Ltd6,158,995006,158,995
Other36,922,3780036,922,378
Total162,570,04500162,570,045

(3)Information about the asset group or asset group portfolio to which the goodwill belongs

None

(4) The specific method of determining the recoverable amount

The recoverable amount is determined on the basis of the net amount by fair value less disposal costs □Applicable <sup></sup>Not applicable

The recoverable amount is determined by the present value of the projected future cash flows

□Applicable <sup></sup>Not applicable

The reason for the obvious discrepancy between the foregoing information and the information used in the impairment test of previous years or the external information

The reason for the obvious discrepancy between the information used in the Company's impairment test in previous years and the actual situation in the current year

(5) Status of completion of performance commitment and corresponding goodwill impairment

When goodwill is formed, there is a performance commitment and the reporting period or the previous period in the reporting period is within the performance commitment period

□Applicable <sup></sup>Not applicable

28.Long-term amortization expenses

In RMB

ItemsBalance in year-beginIncrease at this periodAmortization balanceOther decreaseBalance in year-end
Improvement of use right assets2,548,564651,5182,117,96801,082,114
Road use right28,703,7160844,613027,859,103
Capacity usage fee for step-up substation14,307,9880286,160014,021,828
Other16,668,48701,130,702015,537,785
Total62,228,755651,5184,379,443058,500,830

29.Deferred income tax assets/deferred income tax liabilities

(1)Details of the un-recognized deferred income tax assets

In RMB

ItemBalance in year-endBalance in year-begin
Deductible temporary differenceDeferred income tax assetsDeductible temporary differenceDeferred income tax assets
Provision for asset impairments714,168,000178,542,000808,442,956202,110,740
Intra-group transactions451,633,856112,908,464469,222,255117,305,564
Deductible losses1,424,887,572356,221,8931,359,766,199339,941,550
Lease Liabilities2,387,527,752596,881,9382,223,936,509555,984,127
Employee benefits payable245,427,02461,356,756244,159,14861,039,787
Depreciation of fixed assets283,751,50070,937,875283,862,48470,965,621
Other104,452,33626,113,084108,242,48327,060,621
Total5,611,848,0401,402,962,0105,497,632,0341,374,408,010

(2)Details of the un-recognized deferred income tax liabilities

In RMB

ItemsBalance in year-endBalance in year-begin
Temporarily Deductable or Taxable DifferenceDeferred Income Tax liabilitiesTemporarily Deductable or Taxable DifferenceDeferred Income Tax liabilities
Non-same control enterprise mergerassets evaluation and appreciation0000
Changes in fair value of other creditor's rights Investment0000
Changes in fair value of other equity instruments1,915,910,428478,977,6072,068,065,452517,016,363
Right to use assets1,694,633,496423,658,3741,621,870,673405,467,669
Depreciation of fixed assets48,993,78012,248,44552,543,95113,135,988
Amortization of land use rights14,565,6603,641,41514,152,6633,538,166
Interest receivable170,12042,530170,11842,530
Other00
Total3,674,273,484918,568,3713,756,802,857939,200,716

(3) Deferred income tax assets or liabilities listed by net amount after off-set

In RMB

ItemsTrade-off between the deferred income tax assets and liabilitiesEnd balance of deferred income tax assets or liabilities after off-setTrade-off between the deferred income tax assets and liabilities at period-beginOpening balance of deferred income tax assets or liabilities after off-set
Deferred income tax assets393,445,6361,009,516,374415,346,567959,061,443
Deferred income liabilities393,445,636525,122,735415,346,567523,854,149

(4)Details of income tax assets not recognized

In RMB

ItemsBalance in year-endBalance in year-begin
Deductible temporary difference4,623,187,2814,980,694,234
Deductible loss9,550,704,20612,018,511,952
Total14,173,891,48716,999,206,186

(5)Deductible losses of the un-recognized deferred income tax asset will expire in the following years

In RMB

YearBalance in year-endBalance in year-beginRemark
20262,844,742,0642,844,742,064
20274,580,717,2534,580,717,253
20281,070,179,3461,070,179,346
20291,564,369,8651,564,369,865
20301,958,503,4241,958,503,424
2031809,392,810
Total12,827,904,76212,018,511,952

Other note None

30. Other non-current assets

In RMB

ItemBalance in year-endBalance in year-begin
Book balanceProvision for devaluationBook valueBook balanceProvision for devaluationBook value
Prepayments for equipment fund3,205,950,67303,205,950,6733,261,450,67903,261,450,679
Input VAT to be deducted3,625,151,98703,625,151,9873,574,552,04703,574,552,047
Prepayment for equity acquisition124,200,0000124,200,000124,200,0000124,200,000
Prepayment for land use rights128,269,0340128,269,034126,611,6290126,611,629
Other263,6800263,68024,353,695024,353,695
Total7,083,835,37407,083,835,3747,111,168,05007,111,168,050

31. Assets with restricted ownership or right to use

In RMB

ItemEnd of periodBeginning of period
Book balanceBook balanceBook valueRestricted typeBook balanceBook balanceBook valueRestricted type
Monetary funds30,192,65430,192,654Deposit, etcRestricted25,738,32425,738,324DepositRestricted
Account receivable927,066,699927,066,699power bill collection right pledgeRestricted958,517,625958,517,625Pledge of electricity fee charge rightRestricted
Total957,259,353957,259,353984,255,949984,255,949

Other note: None

32. Short-term borrowings

(1) Category of short-term borrowings

ItemsClosing balanceOpening balance
Credit loans9,830,784,4949,741,011,157
Total9,830,784,4949,741,011,157

Explanation on short-term loans category:

(2) Overdue outstanding short-term loans

Total 0 Yuan overdue outstanding short-term loans at period-end, including the followed significant amount: None

33. Transactional financial liabilities

None

34. Derivative financial liability

None

35.Notes payable

In RMB

ItemClosing balanceOpening balance
Bank acceptance bills955,701,088650,000,000
LC1,776,461,437869,972,657
Total2,732,162,5251,519,972,657

36. Accounts payable

(1) List of accounts payable

In RMB

ItemClosing balanceOpening balance
Fuel payable5,255,560,3123,030,399,013
Payment for electricity trading service fees1,478,677,806
Materials and spare parts payable374,157,262387,842,726
Repair expenses payable485,187,769234,655,323
Contracted operation expenses payable331,768,995314,416,207
Carbon emission allowances payable72,434,96854,374,084
Management fees payable for frequency modulation and energy storage10,201,98818,984,762
Other270,162,131254,094,788
Total8,278,151,2314,294,766,903

(2)Significant accounts payable that aged over one year

In RMB

ItemClosing balanceOpening balance
Fuel payable and freight payable65,640,150Not yet settled
Total65,640,150

37.Other payable

In RMB

ItemClosing balanceOpening balance
Interest payable00
Dividend payable105,171,5550
Other payable17,230,318,74918,806,427,609
Total17,335,490,30418,806,427,609

(1) Interest payable

None

(2) Dividend Payable

In RMB

ItemClosing balanceOpening balance
Common stock dividend105,171,555
Total105,171,5550

Note: Including significant unpaid dividends payable over one year, the unpaid reason shall be disclosed:

(3)Other payable

1)Disclosure by nature

In RMB

ItemClosing balanceOpening balance
Construction and equipment expenses payable16,166,131,24617,625,958,012
Engineering quality guarantee payable451,915,094395,767,744
Carbon emission allowances payable346,324,662256,889,119
Advances payable to third parties8,878,6054,969,109
Environmental restoration cost108,749,400111,415,825
Other148,319,742411,427,800
Total17,230,318,74918,806,427,609

2) Other payables with large amount and aging of over one year

In RMB

ItemClosing balanceReason
Construction and equipment expenses payable, Engineering quality guarantee payable8,950,045,390Failure to meet payment terms
Total8,950,045,390

Other note

As at 31 June 30, 2026, other payables of RMB 8,950,045,390 (31 December 2025: RMB7,831,706,993) aged over one year mainly represented construction and equipment expenses payable and warranty payable not being settled because the comprehensive acceptance and settlement of relevant projects were yet to be completed or projects were still within their warranty periods.

38. Advance from customers

(1) List of Advance from customers

In RMB

Land advance payment ItemsClosing balanceOpening balance
Rental income64,838,14867,892,003
Total64,838,14867,892,003

(2)Significant payable aging more than 1 year

In RMB

Land advance payment ItemsClosing balanceOpening balance
Rental income64,745,129The advances from customers primarily related to the prepaid rental incomereceived by the Company’s subsidiary, GEGC Xinjiang for granting the right to use the step-up collection substation to Huaneng Turpan Wind Power Co., Ltd., Not yet settled
Total64,745,129

39.Contract Liabilities

In RMB

ItemClosing balanceOpening balance
Advance service payment83,560,79176,228,858
Other4,785,765874,444
Total88,346,55677,103,302

Major contract liabilities with over one year

In RMB

ItemClosing balanceOpening balance
Not applicable

Significant changes in the book value in the current period

In RMB

ItemAmount changesReason for change
Not applicable

40.Payable Employee wage

(1) List of Payroll payable

In RMB

ItemBalance in year-beginIncrease in this perioddecrease in this periodBalance in year-end
1.Short-term compensation464,293,1051,437,382,5961,113,916,695787,759,006
2.Post-employment benefits - defined contribution plans3,085,162238,578,391234,545,6157,117,938
3.Dismissal welfare116,664,18410,884,48943,273,62584,275,048
4. Other benefits due within one year8,450,02354,5613,212,0215,292,563
Total592,492,4741,686,900,0371,394,947,956884,444,555

(2)Short-term remuneration

In RMB

ItemBalance in year-beginIncrease in this perioddecrease in this periodBalance in year-end
1. Wages, bonuses, allowances and subsidies2,686,4441,052,848,121767,031,626288,502,939
2. Employee welfare3,153,149105,342,27586,371,96522,123,459
3. Social insurance premiums296,523,88580,899,16779,239,497298,183,555
Including: Medical insurance296,523,88572,034,50970,452,141298,106,253
Work injury insurance07,711,9447,634,64277,302
Maternity insurance01,152,7141,152,7140
0
4. Public reserves for housing90,792111,387,649109,861,3251,617,116
5.Union funds and staff education fee151,116,19639,439,12834,728,917155,826,407
6. Short-term paid absence0000
7. Short-term profit-sharing plan0000
8. Other short-term remuneration10,722,63947,466,25636,683,36521,505,530
Total464,293,1051,437,382,5961,113,916,695787,759,006

(3)Defined contribution plans listed

In RMB

ItemBalance in year-beginIncrease in this periodPayable in this periodBalance in year-end
1.Basic old-age insurance premiums49,335154,261,697152,133,2332,177,799
2.Unemployment insurance7,2467,531,6177,439,04199,822
3. Annuity payment3,028,58176,785,07774,973,3414,840,317
Total3,085,162238,578,391234,545,6157,117,938

41.Tax Payable

In RMB

ItemClosing balanceOpening balance
VAT75,196,124123,386,012
Consumption tax00
Enterprise Income tax119,084,95479,849,719
Individual Income tax1,624,54140,194,293
City Construction tax3,342,6076,574,977
House property Tax30,525,61735,697,145
Education surcharges2,543,9085,326,932
Land use tax8,435,0536,091,965
Other9,418,63114,222,271
Total250,171,435311,343,314

42. Liabilities classified as holding for sale

In RMB

ItemClosing balanceOpening balance
Total00

43.Non-current liabilities due within 1 year

ItemClosing balanceOpening balance
Long-term loans due in 1 year10,159,584,9487,971,497,778
Bond payable due in 1 year1,004,515,1071,064,288,075
Long-term Account payable due in 1 year517,288,601358,639,833
Lease liabilities due in 1 year196,092,628491,774,691

In RMB

Total11,877,481,2849,886,200,377

44. Other current-liabilities

ItemClosing balanceOpening balance
Output VAT to be written off635,996,024520,439,919
Total635,996,024520,439,919

Changes of short-term bond payable: None

45.Long-term borrowings

(1)Long-term borrowings

In RMB

ItemClosing balanceOpening balance
Pledged borrowings1,742,886,4673,589,343,331
Mortgage borrowings00
Guarantee loan933,066,1041,076,114,721
Credit loans64,756,336,76766,943,956,492
Total67,432,289,33871,609,414,544

Explanation on category of long-term loans:

Other note: including interest rate section

46.Bond payable

(1)Bond payable

In RMB

ItemClosing balanceOpening balance
21 Yudean 020126,998,416
21 Yudean03816,411,354802,733,618
22 Yudean Fa MTN001614,436,499605,575,178
23 Yudean Fa MTN0011,615,024,1241,641,650,539
24 Yudean Fa MTN0011,001,878,2831,013,812,118
24 Yudean Fa MTN0021,534,133,4831,514,923,106
24 Yudean Fa MTN003610,782,266603,169,625
24 Yudean Fa MTN004A1,016,969,9021,004,509,926
24 Yudean Fa MTN004B508,192,127501,386,519
24 Yudean Fa MTN0051,015,675,9361,002,065,904
24 Yudean Fa MTN006A811,438,257801,874,743
24 Yudean Fa MTN006B1,014,423,7871,000,981,240
25 Yudean Fa MTN001499,693,816505,093,156
25 Yudean Fa MTN002813,409,400804,541,947
25 Yudean Fa MTN003912,769,167902,853,033
26 Yudean Fa MTN001MTN001(M & A)902,838,0540
G23 Yuefeng 20614,415,602
Less: Bonds payable and due within one year-1,004,515,107-1,064,288,075
Total12,683,561,34812,382,296,595

(2)Changes of bonds payable(Not including the other financial instrument of preferred stock and perpetual capital securities that classify as financial liability In RMB

BondFace valueInterest rateRelease dateBond periodIssuing amountOpening balanceIssued in the PeriodAccrual interest by face valuePremium/discount amortizationPaid in the PeriodTransfer out to non-current liabilities due within one yearClosing balanceWhether default
21 Yudean 021,500,000,0002.45%April 27,20215 years1,500,000,000126,998,4161,055,5948,490128,062,5000No
21 Yudean 03800,000,0003.41%November 23,20215 years800,000,000802,733,61813,640,00037,736816,411,354No
22 Yudean Fa MTN001600,000,0002.90%August 24,20225 years600,000,000605,575,1788,700,000161,321614,436,499No
23 Yudean Fa MTN0011,600,000,0003.35%March 15,20235 years1,600,000,0001,641,650,53926,800,000173,58553,600,0001,615,024,124No
24 Yudean Fa MTN0011,000,000,0002.41%May 22,20245 years1,000,000,0001,013,812,11812,050,000116,16524,100,0001,001,878,283No
24 Yudean Fa MTN0021,500,000,0002.54%July 11,202410 years1,500,000,0001,514,923,10619,050,000160,3771,534,133,483No
24 Yudean Fa MTN003600,000,0002.52%September 9,202415 years600,000,000603,169,6257,560,00052,641610,782,266No
24 Yudean Fa MTN004A1,000,000,0002.47%October 11,20245 years1,000,000,0001,004,509,92612,350,000109,9761,016,969,902No
24 Yudean Fa MTN004B500,000,0002.70%October 11,202415 years500,000,000501,386,5196,750,00055,608508,192,127No
24 Yudean Fa MTN0051,000,000,0002.70%October 22,202415 years1,000,000,0001,002,065,90413,500,000110,0321,015,675,936No
24 Yudean Fa MTN006A800,000,0002.37%November 11,20245 years800,000,000801,874,7439,480,00083,514811,438,257No
24 Yudean Fa1,000,000,0002.67%November 11,202415 years1,000,000,0001,000,981,24013,350,00092,5471,014,423,787No

Guangdong Electric Power Development Co., Ltd. The Semi-annual Report 2026

MTN006B
25 Yudean Fa MTN001500,000,0002.18%June 9,202510 years500,000,000505,093,1565,450,00050,66010,900,000499,693,816No
25 Yudean Fa MTN002800,000,0002.20%September 11,20255 years800,000,000804,541,9478,800,00067,453813,409,400No
25 Yudean Fa MTN003900,000,0002.18%October 17,20255 years900,000,000902,853,0339,810,000106,134912,769,167No
26 Yudean Fa MTN001M TN001(M & A))900,000,0001.83%April16,20265 years900,000,000900,000,0003,241,356-403,302902,838,054No
G23 Yuefeng 2600,000,0003.15%March20,20235 years600,000,000614,415,6024,155,411328,987618,900,0000No
Less: Bonds payable and due within one year-1,064,288,07559,772,968-1,004,515,107No
Total15,600,000,00012,382,296,595900,000,000175,742,3611,311,924835,562,50059,772,96812,683,561,348

(3) Note to conditions and time of share transfer of convertible bonds

None

(4) Other financial instruments classify as financial liability

Outstanding other financial instruments as preferred stock and perpetual bonds at period-end

None

47. Lease liability

In RMB

ItemClosing balanceOpening balance
Net lease liabilities12,109,264,25112,394,114,636
Total12,109,264,25112,394,114,636

48. Long-term payable

In RMB

ItemClosing balanceOpening balance
Long-term payable943,859,4181,084,370,338
Special payable24,960,00024,960,000
Total968,819,4181,109,330,338

(1) Long-term payable listed by nature of the account

In RMB

ItemClosing balanceOpening balance
Equipment and construction expenses payable1,045,315,8491,030,843,602
Sea area usage fee payable415,832,170412,166,569
Less: Long-term payables due due within one year-517,288,601-358,639,833
Total943,859,4181,084,370,338

Other note:

(2)Specific payable

In RMB

ItemOpening balanceIncreaseDecreaseClosing balanceCause
Supporting funds for efficiency improvement and capacity expansion of Guanlanzihe Hydropower Station and Nanrongtian Hydropower Station24,960,00024,960,000Supporting funds for expansion
Total24,960,00024,960,000

Other note:

Note: The special payables of the Company are the expansion supporting funds allocated by the central and provincial governments according to the "Notice on Printing and Distributing the Implementation Rules for the Construction and Management of Rural Hydropower Efficiency Expansion and Renovation Projects in Yunnan Province" (Yunshui Dian [2013] No. 46) issued by the Yunnan Provincial Water Resources Department and the Yunnan Provincial Finance Department. There is no specific repayment deadline, and the state-owned administrative asset income shall be levied at an annual interest rate of 4% and handed over to Yunnan Provincial Water Conservancy and Hydropower Investment Co., Ltd. Our company will include the corresponding interest in this part in the financial expenses.

49. Long-term employee salary payable

(1)Long-term employee salary payable

In RMB

ItemClosing balanceOpening balance
I.Post-employment benefits - defined contribution plans90,722,54590,929,292
II. Dismissal benefits459,588,837490,440,159
III. Other long-term benefits10,743,69010,743,690
Total561,055,072592,113,141

(2) Changes of defined benefit plans

None

50.Predicted liabilities

In RMB

ItemsClosing balanceOpening balanceReason
Total00

Other explanations, including relevant important assumption and estimation explanations of important estimated liabilities:None

51.Deferred income

In RMB

ItemBeginning of termIncreased this termDecreased this termEnd of termReason
Government Subsidy141,794,31242,647,7743,444,664180,997,422Asset-related government grants received
Total141,794,31242,647,7743,444,664180,997,422

Other note:

None

52. Other non-current liabilities

In RMB

ItemsClosing balanceOpening balance
Housing revolving fund985,667985,667
Other42,50042,500
Total1,028,1671,028,167

Other note:None

53.Stock capital

In RMB

Year-beginning balanceChanged (+, -)Balance in year-end
Issuance of new shareBonus sharesCapitalization of public reserveOtherSubtotal
Total of shares5,250,283,9865,250,283,986

Other note:None

54. Other equity instruments

(1) Basic information of preferred stock, perpetual capital securities and other financial instruments outstanding issued at period-end

(2) Change list of preferred stock, perpetual capital securities and other financial instruments outstanding issued at period-end

In RMB

Outstanding financial instrumentPeriod-beginCurrent increasedCurrent decreasedPeriod-end
AmountBook valueAmountBook valueAmountBook valueAmountBook value
Total00

Changes of other equity instrument, change reasons and relevant accounting treatment basis: Other note: None

55. Capital reserves

In RMB Other explanations, including the increase or decrease in this period and the reasons for such change:

ItemYear-beginning balanceIncrease in the current periodDecrease in the current periodYear-end balance
Share premium4,719,093,789004,719,093,789
Other capital reserves0000
Revaluation reserve119,593,71800119,593,718
Investment From GEGC388,976,35500388,976,355
Share of interests in the investee in proportion to the shareholding-142,902,55511,163,6540-131,738,901
Transfer of capital surplus recognised under the previous accounting system20,474,5920020,474,592
Other-76,905,77400-76,905,774
Total5,028,330,12511,163,65405,039,493,779

In the first half of 2026, Changes in other equity interests of invested units in proportion to shareholding resulted in an increase in capital reserve of 11,163,654 yuan.

56.Treasury stock

ItemYear-beginning balanceIncrease in the current periodDecrease in the current periodYear-end balance
Total00

Other explanations, including the increase or decrease in this period and the reasons for such change:

In RMB

57. Other comprehensive income

In RMB

ItemYear-beginning balanceAmount of current periodClosing balance
Amount incurred before income taxLess: Amount transferred into profit and loss in the current period that recognized into other comprehensive income in prior periodLess: Prior period included in other composite income transfer to retained income in the current periodLess: Income tax expensesAfter-tax attribute to the parent companyAfter-tax attribute to minority shareholder
I. Other comprehensive income that will not be subsequently reclassified to profit or loss1,532,266,215-152,155,02400-38,038,756-114,116,26801,418,149,947
Including: Changes arising from remeasurement of defined benefit plans-55,383,085000000-55,383,085
Other comprehensive income that cannot be transferred to profit or loss under equity method37,152,10000000037,152,100
Changes in fair value of investments in other equity instruments1,550,497,200-152,155,02400-38,038,756-114,116,26801,436,380,932
II. Other comprehensive income that will be subsequently reclassified to profit or loss1,571,032-972,047000-972,0470598,985

Guangdong Electric Power Development Co., Ltd. The Semi-annual Report 2026 Other explanations, including the adjustment of the effective part of cash flow hedging profit and loss to the initial recognition amount of the hedged item:

Including: Share of other comprehensive income of the investee that cannot be transferred to profit or loss accounted for using the equity method1,571,032-972,047000-972,0470598,985
Total of other comprehensive income1,533,837,247-153,127,07100-38,038,756-115,088,31501,418,748,932

Not applicable

58. Special reserves

In RMB Other explanations, including the increase or decrease in this period and the reasons for such change:

ItemYear-beginning balanceIncrease in the current periodDecrease in the current periodYear-end balance
Safety in production90,467,033190,232,140126,260,114154,439,059
Total90,467,033190,232,140126,260,114154,439,059

The Company set aside special reserves of 190,232,140 yuan this year, and the actual use is 126,260,114 yuan.

59. Surplus reserves

In RMB

ItemYear-beginning balanceIncrease in the current periodDecrease in the current periodYear-end balance
Statutory surplus reserve3,016,893,8703,016,893,870
Discretionary surplus reserve5,886,621,2655,886,621,265
Total8,903,515,1358,903,515,135

Explanation: including changes and reasons for changes

Not applicable

60. Retained profit

In RMB

ItemCurrent periodPrior period
Retained profit at period-end before adjustment2,637,923,6922,142,987,033
Retained profit at period-begin after adjustment00
Adjusted beginning undistributed profit2,637,923,6922,142,987,033
Add: net profit attributable to shareholders of parent company for this year-545,781,40632,474,158
Capital reserve to cover losses0
Less: Extract the legal surplus reserve fund0
Extract any surplus reserve fund0
Extract general risk reserve0
Dividend payable for ordinary shares105,005,680105,005,680
Retained profit at the end of this term1,987,136,6062,070,455,511

As regards the details of adjusted the beginning undistributed profits (1)As the retroactive adjustment on Enterprise Accounting Standards and its related new regulations, the affected beginning undistributed profits are RMB 0. (2) As the change of the accounting policy, the affected beginning undistributed profits are RMB 0. (3) As the correction of significant accounting error, the affected beginning undistributed profits are RMB 0 . (4) As the change of consolidation scope caused by the same control, the affected beginning undistributed profits are RMB 0

(5) Other adjustment of the total affected beginning undistributed profits are RMB 0 .

Detailed explanation of using capital reserve to cover losses:

Not applicable

61. Business income, Business cost

In RMB

ItemAmount of current periodAmount of previous period
IncomeCostIncomeCost
Main business26,248,017,40225,300,553,85523,024,016,64621,059,973,597
Other business85,068,22230,321,223117,425,29728,589,895
Total26,333,085,62425,330,875,07823,141,441,94321,088,563,492

Income related information:

In RMB

Contract classificationDivision 1Division 2Total
IncomeCostIncomeCostIncomeCostIncomeCost
Business26,333,085,62425,330,875,07826,333,085,62425,330,875,078
Including:
Electric power25,930,689,40125,024,651,33725,930,689,40125,024,651,337
Fly ash coal sales revenue43,087,7304,574,15643,087,7304,574,156
Thermal Energy236,766,495228,699,950236,766,495228,699,950
Other122,541,99872,949,635122,541,99872,949,635
Area26,333,085,62425,330,875,07826,333,085,62425,330,875,078
Including:
Guangdong25,374,461,54424,444,657,89625,374,461,54424,444,657,896
Xinjiang598,862,232553,007,974598,862,232553,007,974
Hunan63,857,83161,261,20363,857,83161,261,203
Hebei82,319,55158,392,63382,319,55158,392,633
Guangxi64,142,27174,893,67964,142,27174,893,679
Yunnan34,088,33616,203,58534,088,33616,203,585
Henan16,413,83810,323,22216,413,83810,323,222
Shanxi14,146,79720,171,54114,146,79720,171,541
Shangdong13,480,00111,236,58313,480,00111,236,583
Inner Mongolia38,785,39440,008,83238,785,39440,008,832
Gansu12,169,09828,092,87312,169,09828,092,873
Anhui20,358,73112,625,05720,358,73112,625,057
Market type26,333,085,62425,330,875,07826,333,085,62425,330,875,078
Including
Power market25,930,689,40125,024,651,33725,930,689,40125,024,651,337
Other market402,396,223306,223,741402,396,223306,223,741
Contract type26,333,085,62425,330,875,07826,333,085,62425,330,875,078
Including
Sell goods26,210,543,62625,257,925,44326,210,543,62625,257,925,443
Service104,633,65566,707,183104,633,65566,707,183
Assets use rights17,908,3436,242,45217,908,3436,242,452
By the time of commodity transfer26,333,085,62425,330,875,07826,333,085,62425,330,875,078
Including
Recognize at a certain time point26,210,543,62625,257,925,44326,210,543,62625,257,925,443
Recognize in a certain period of time122,541,99872,949,635122,541,99872,949,635
Constrict term26,333,085,62425,330,875,07826,333,085,62425,330,875,078
Including
General contract26,333,085,62425,330,875,07826,333,085,62425,330,875,078
Sales channel
Including
Total26,333,085,62425,330,875,07826,333,085,62425,330,875,078

Information related to performance obligations:

ItemThe time to fulfill the performance obligationImportant payment termsThe nature of the goods that the company promises to transferWhether it is the main responsible personThe expected refunds to customers borne by the companyThe types of quality assurance provided by the company and related obligations
Electric powerJune 30,2026Cash settlement/monthly settlementElectric powerYesNot applicableAccording to the industry warranty
Heat energyJune 30,2026Cash settlement/monthly settlementHeat energyYesNot applicableAccording to the industry warranty
Power generation by-productsJune 30,2026Cash settlement/monthly settlementPower generation by-productsYesNot applicableAccording to the industry warranty
Labor serviceJune 30,2026Cash settlement/monthly settlementLabor serviceYesNot applicableAccording to the industry warranty

Other note Information related to the transaction price apportioned to the residual performance obligation:

The income corresponding to the performance obligations that have not been performed or have been performed incompletely but the contract has been signed at the end of the reporting period is RMB477,741,094.0, of which RMB184,393,771 is expected to be recognized as income in 2026, RMB128,942,230 is expected to be recognized as income in 2027, RMB164,405,093 is expected to be recognized as income in 2028.

Information related to variable consideration in the contract:

Not applicable

Significant contract changes or significant transaction price adjustments

None

62. Business tax and subjoin

In RMB

ItemAmount of current periodAmount of previous period
Consumption tax0
Urban construction tax34,052,20029,509,307
Education surcharge25,737,27822,818,061
Resource tax976,483
Property tax33,280,06445,938,241
Land use tax10,310,14314,167,219
vehicle and vessel usage tax73,40873,892
Stamp tax12,545,40013,810,586
Environmental protection tax51,136,7089,532,149
Other6,556,1287,366,859
Total174,667,812143,216,314

Other note:

None

63.Administrative expenses

In RMB

ItemAmount of current periodAmount of previous period
Employee’s remuneration392,222,032368,545,366
Amortization of intangible assets48,873,08950,902,238
Depreciation expenses48,851,51650,588,722
Fire safety expenses29,963,30928,646,946
Property management expenses21,506,23918,915,521
Long-term deferred amortization of expenses2,768,0203,158,354
Agency fee9,038,4379,810,716
Publicity expense1,752,8891,721,366
Rental expenses5,715,2895,471,930
A forestation fees6,367,4006,115,381
Travel expenses7,949,0896,420,338
Repair fee1,294,2062,939,784
Office expenses4,824,5304,887,682
Consulting fee8,842,6345,116,284
Information system maintenance fee14,418,0419,272,432
Entertainment expenses540,2101,735,530
Insurance expenses5,571,4201,715,469
Low value easy to consume amortization1,084,526601,556
Board fee244,297331,340
Other30,690,25329,336,054
Total642,517,426606,233,009

64.Selling expenses

In RMB

ItemAmount of current periodAmount of previous period
Employee’s remuneration39,977,49237,297,407
Business expense590,431860,367
Depreciation expenses1,391,9881,447,437
Publicity Expenses97,16030,874
Other3,078,0984,095,592
Total45,135,16943,731,677

65. R&D Expense

In RMB

ItemAmount of current periodAmount of previous period
Direct input fee83,699,651236,272,514
Employee’s remuneration64,955,72554,910,105
Outsourced research and development expenses2,239,5394,111,716
Other22,413,43625,746,959
Total173,308,351321,041,294

66.Financial Expenses

In RMB

ItemAmount of current periodAmount of previous period
Interest expenses1,178,549,8541,141,097,530
Interest income-39,291,534-47,640,150
Bank charges and others6,285,4347,665,107
Total1,145,543,7541,101,122,487

67.Other income

In RMB

Other sources of revenueAmount of the Current TermAmount of the Previous Term
Revenue from timely levy and refund of VAT3,415,19312,969,171
Amortization of the deferred income related to the assets3,444,6643,522,395
Other3,409,9357,407,911

68.Net exposure hedging income

In RMB

ItemAmount of the Current TermAmount of the Previous Term
Total00

69. Gains on the changes in the fair value

In RMB

ItemAmount of the Current TermAmount of the Previous Term
Total00

70. Investment income

In RMB

ItemAmount of this periodAmount of last period
Long-term equity investment income by equity method432,794,674297,613,926
Dividends earned during the holding period on investments in other equity instrument122,852,781116,155,595
Total555,647,455413,769,521

Other note:

None

71. Credit impairment loss

In RMB

ItemAmount of this periodAmount of last period
Loss of bad accounts receivable-4,301,538-7,409,018
Loss of bad debts in other receivables-2,875,754364,945
Total-7,177,292-7,044,073

Other note:

None

72. Losses from asset impairment

In RMB

ItemAmount of this periodAmount of last period
I. Loss of inventory falling price and loss of contract performance cost impairment14,900
XI. Impairment loss of the contract assets1,233-104
Total16,133-104

Other note: None

73.Assets disposal income

In RMB

SourceAmount of this periodAmount of last period
Gains on disposals of PPE25,316,2990
Early lease withdrawal and disposal income041,534

74. Non-Operation income

In RMB

ItemAmount of current periodAmount of previous periodRecorded in the amount of the non-recurring gains and losses
Gain on disposal of non-current assets1,822,63224,995,3251,822,632
Claims and compensation income172,938,203108,044,369172,938,203
A fine net income13,215,7253,114,23713,215,725
Waived payables5,030,26605,030,266
Interest income from capital occupation4,789,36804,789,368
Income from penalties and fines1,536,1281,086,8971,536,128
Income from carbon emission quota trading59,995059,995
Other3,299,8612,857,6703,299,861
Total202,692,178140,098,498202,692,178

Other note:

None

75.Non-current expenses

ItemAmount of current periodAmount of previous periodThe amount of non-operating gains & losses
Foreign donations26,315119,30226,315
Carbon emission allowances used to fulfill the emission reduction obligation72,586,71572,907,5130
Loss on obsolescence of non-current assets13,869,70010,385,90013,869,700
Fine for delaying payment21,614,2941,732,82021,614,294
Costs for repairing damaged assets due to the wind disaster3,253,21903,253,219
Other1,329,747586,6981,329,747
Total112,679,99085,732,23340,093,275

Other note:

None

76. Income tax expenses

(1)Income tax expenses

In RMB

ItemAmount of current periodAmount of previous period
Current income tax expense198,871,235168,875,760
Deferred income tax expense-11,147,58956,395,204
Total187,723,646225,270,964

(2)Adjustment on accounting profit and income tax expenses

In RMB

ItemAmount of current period
Total profits-504,877,391
Income tax expenses calculated on legal / applicable tax rate-126,219,348
Effect of different tax rate applicable to the subsidiary Company-7,960,186
Impact of adjusting the income tax of prior period0
Influence of non taxable income-108,198,669
Impact of non-deductible costs, expenses and losses4,418,226
Utilisation of previously unrecognized deductible losses or temporary differences-36,494,077
Utilization of deductible temporary differences for which no deferred tax asset was recognised in previous periods462,177,700
0
Income tax expenses187,723,646

Other note: None

77. Other comprehensive income

Refer to the notes VII(57)

78. Items of cash flow statement

(1) Cash related to business activities

Cash received from other activities relating to operation

In RMB

ItemAmount of current periodAmount of previous period
Interest income28,553,51037,392,453
Government Subsidy53,947,01122,247,807
Claims and compensation income117,960,61326,001,802
Rental fee30,311,28410,344,333
Return the fuel advance payment1,484,213.2096,450,000
Land compensation5,000,00060,748,250
Compensation for reclamation works and breakwater royalties53,797,467
Other16,866,992.80166,631,286
Total254,123,624473,613,398

Explanation on other cash received in relation to operation activities: None

Other cash paid in relation to operation activities

In RMB

ItemAmount of current periodAmount of previous period
Carbon emission quota and trading reserve fund175,088,28558,366,041
Information system maintenance fee15,752,19011,968,874
Repair and maintenance costs104,111,958186,805,860
Insurance premium156,285,20443,774,545
Water and electricity47,327,40534,188,560
Property management service fee29,975,28830,732,615
Fire-fighting and security fees29,314,54631,627,267
Agency fees14,985,00016,227,658
Equipment cleaning, sanitation and greening fees9,988,81410,935,388
Auxiliary service fee for energy storage and frequency regulation1,512,3144,274,603
Automobile fee13,048,71111,630,510
Rental fee10,849,35315,284,167
Travel expense18,396,97410,533,401
Labour union fee3,964,7136,730,198
Office fee7,014,4826,197,607
Business fee1,078,2502,338,836
Enterprise propagate fee1,800,9583,402,574
R & D35,071,27720,088,252
Other184,549,723336,710,167
Total860,115,445841,817,123

Explanation on other cash paid in relation to operation activities: None

(2)Cash related to Investment activities

Cash receivable related to other Investment activities

In RMB

ItemAmount of current periodAmount of previous period
Take back the large deposit certificate ofthe finance Company846,238,699
Return of the equity acquisition advance payment101,226,000
Total846,238,699101,226,000

Related for important cash related to investment activities

In RMB

ItemAmount of current periodAmount of previous period
Return of the equity acquisition advance payment846,238,699
Total846,238,699

Explanation on other cash received from investment activities: None.

Cash paid related with investment activities

In RMB

ItemAmount of current periodAmount of previous period
Equity Acquisition Deposit
Deposit in time deposit190,000,00011,467,182
Other1,034,550
Total190,000,00012,501,732

Important cash received in relation to the investment activities

In RMB

ItemAmount of current periodAmount of previous period
Deposit in time deposit190,000,000
Total190,000,000

Explanation of other cash payments related to fund-raising activities: None

(3)Cash related to Financing activities

Other cash received in relation to financing activities

In RMB

ItemCurrent period incurredPrior period incurred
Total00

Explanation on other cash received in relation to financing activities:

Other cash paid related with financing activities

In RMB

ItemCurrent period incurredPrior period incurred
Repayments of lease liabilities and long-term payables1,069,361,494445,517,523
Other230,48949,266,087
Total1,069,591,983494,783,610

Changes in various liabilities arising from fund-raising activities

□Applicable <sup></sup>Not applicable

(4) Statement of cash flows on a net basis

None

(5) Major activities and financial impacts that do not involve cash receipts and expenditures in the current period, but affect the financial position of the enterprise or may affect the cash flow of the enterprise in the future

None

79. Supplementary information to statement of cash flow

(1) Supplementary information to statement of cash flow

In RMB

Supplementary informationCurrent amountAmount of the previous period
1. Net profit adjusted to cash flow of operation activities:
Net profit-692,601,03797,295,326
Add: Assets impairment provision7,161,1597,044,177
Depreciation of fixed assets, consumption of oil assets and depreciation of productive biology assets3,350,067,7792,769,985,362
Depreciation of right-of-use assets365,987,616399,939,207
Amortization of intangible assets68,276,26770,140,486
Amortization of long-term deferred expenses4,379,4435,247,063
Loss from disposal of fixed assets, intangible assets and other long-term assets (gain is listed with “-”)-25,316,299-41,534
Losses on scrapping of fixed assets (gain is listed with “-”)12,047,068-14,609,425
Gain/loss of fair value changes (gain is listed with “-”)00
Financial expenses (gain is listed with “-”)1,178,549,8541,141,097,530
Investment loss (gain is listed with “-”)-555,647,455-413,769,521
Decrease of deferred income tax asset (increase is listed with “-”)-50,454,931-156,697,047
Increase of deferred income tax liability (decrease is listed with “-”)39,307,342213,092,251
Decrease of inventory (increase is listed with “-”)-1,640,277,011-670,285,589
Decrease of operating receivable accounts (increase is listed with “-”)-1,494,934,519225,037,896
Increase of operating payable accounts (decrease is listed with “-”)Other5,392,482,334682,645,416
Net cash flow arising from operating activities5,959,027,6104,356,121,598
2. Material investment and financing not involved in cash flow
Conversion of debt into capital
Switching Company bonds due within one year
Financing lease of fixed assets
3. Net change of cash and cash equivalents:
Balance of cash at period end14,006,429,82612,529,747,072
Less: Balance of cash equivalent at year-begin12,342,414,94711,831,504,924
Add: Balance at year-end of cash equivalents
Less: Balance at year-begin of cash equivalents
Net increased amount of cash and cash equivalent1,664,014,879698,242,148

(2) Net cash paid for obtaining subsidiary in the Period

None

(3)Net cash received by disposing subsidiary in the Period

None

(4) Constitution of cash and cash equivalent

In RMB

ItemEnding balanceOpening balance
I. Cash14,006,429,82612,342,414,947
Including: Cash on hand31,70036,244
Bank deposit available for payment at any time14,006,398,12612,342,378,703
III. Balance of cash and cash equivalents at the period -end14,006,429,82612,342,414,947

(5) Situations where the scope of use is limited but still classified as cash and cash equivalents

None

(6) Monetary funds that do not belong to cash and cash equivalents

In RMB

ItemAmount of the current periodAmount of the previous periodReason for not belonging to cash and cash equivalents
Deposit certificates for finance Company1,794,000,0002,450,238,699The liquidity does not meet the definition of cash and cash equivalents
Other Monetary funds30,192,65425,738,324The liquidity does not meet the definition of cash and cash equivalents
Interest receivable25,602,61321,228,210Accrued balance is not actual balance
Total1,849,795,2672,497,205,233

Other note: None

(7) Description of other major activities

None

80. Notes of changes of owners’ equity

Explain the name and adjusted amount in “Other” at end of last period:

81. Foreign currency monetary items

(1) Foreign currency monetary items

In RMB

ItemClosing foreign currency balanceExchange rateClosing convert to RMB balance
Monetary capital13,191.03
Including: USD190.917.02881,341.87
Euro
HKD13,614.320.870311,849.16
Account receivable
Including: USD
Euro
HKD
Long –term borrowings
Including: USD
Euro
HKD

Other note: None

(2)The nature of the lack of convertibility of currencies and its financial implications, the adopted spot exchange rates and their estimation processes, as well as the risks faced by enterprises due to the lack of convertibility of currencies

□Applicable <sup></sup>Not applicable

(3) Note to overseas operating entities, including important overseas operating entities, which should be disclosed about its principal business place, function currency for bookkeeping and basis for the choice. In case of any change in function currency, the cause should be disclosed.

□ Applicable √ Not applicable

(4)The situation where the accounting currency of an overseas operation lacks convertibility with the reporting currency of the enterprise

□Applicable <sup></sup>Not applicable

82. Leasing

(1) The Company acts as the lessee

<sup></sup>Applicable □Not applicable

Variable lease payments that are not included in the measurement of lease liabilities

<sup></sup>Applicable □Not applicable

The amount of variable lease payments included in the cost of relevant assets or profit or loss for the period is 141,509 yuan.

Simplified processing of lease costs for short-term leases or lease for low-value assets

<sup></sup>Applicable □Not applicable

The amount of short-term lease expenses included in the simplified treatment of the cost of related assets or profit or loss for the period was 2,178,215 yuan.

Cases involving sale-leaseback transactions

None

(2) The Company acts as the lessor

Operating lease as a lessor

<sup></sup>Applicable □Not applicable

In RMB

ItemLease incomeIncluding: the income related to the variable lease payments not included in the lease collection amount
House and building30,311,284
Total30,311,284

Financial lease as a lessor

□Applicable <sup></sup>Not applicable

Annual undiscounted lease receipts for the next five years

□Applicable <sup></sup>Not applicable

Adjustment table for undiscounted lease receipts and net lease investments

(3) Recognition of financial lease sales gains and losses as a producer or distributor

□Applicable <sup></sup>Not applicable

83. Data resources

None

84. Other

None

VIII. R&D expenditure

None

IX. Changes of consolidation scope

1. Enterprise combined under different control

(1) Enterprise combined under different control in the Period

None

(2) Combination cost and goodwill

None

(3) Identifiable assets and liability on purchasing date under the acquiree

None

(4) Gains or losses arising from re-measured by fair value for the equity held before purchasing date Whether it is a business combination realized by two or more transactions of exchange and a transaction of obtained control rights in the Period or not

(5) On purchasing date or period-end of the combination, combination consideration or fair value of identifiable assets and liability for the acquiree are un-able to confirm rationally

None

(6) Other Note:

None

2. Enterprise combine under the same control

(1) Enterprise combined under the same control in the Period

None

(2) Combination cost

None

(3) Book value of the assets and liability of the combined party on combination date

Contingent liability of the combined party bear during combination:

None

3. Counter purchase

Basic transaction information, basis of counter purchase, whether making up business due to the assets and liability reserved by listed company and basis, determination of combination cost, amount and calculation on adjusted equity by equity transaction:

None

4. Subsidiary disposal

Whether lost controlling rights while dispose subsidiary on one time or not

□Yes <sup></sup>No

Whether lost controlling rights in the Period while dispose subsidiary on two or more steps or not

□Yes<sup></sup>No

5. Other reasons for consolidation range changed

Reasons for changed on consolidation range (such as new subsidiary established, subsidiary liquidated etc.)And relevant information:

Addition of subsidiaries in this priod

NameMajor business locationPlace of registrationNature of businessShareholding(%)Acquired way
DirectIndirect
Huaihua Ruisi New EnergyHuaihuaHuaihuaElectric Power15.32Establish
Qiyang New EnergyYongzhouYongzhouElectric Power100Establish

Situation of liquidation subsidiaries in this year:

NameMajor business locationPlace of registrationNature of businessShareholding(%)Acquired way
DirectIndirect
Bejie New EnergyBijieBijieElectric Power100EstablishEstablish
Qiming CompanyGuangzhouGuangzhouElectric Power100EstablishEstablish

6.Other

None

X. Equity in other entity

1. Equity in subsidiary

(1)Constitute of enterprise group

In RMB

SubsidiaryRegistered capitalMain operationRegistered placeBusiness natureShareholding(%)Acquired way
Direct
Maoming Termal Power Plant1,437,985,100MaomingMaomingElectric Power46.54%Establish
Jinghai Powr Generation4,174,107,540JieyangJieyangElectric Power65%Establish
Zhangjiang Wind Power449,420,000ZhanjiangZhanjiangElectric Power53.51%Establish
Technology Engineering Compan200,000,000GuangzhouGuangzhouRepair services100%Establish
Humen Power Generation150,000,000DongguanDongguanElectric Power60%Establish
Bohe Company3,118,000,000MaomingMaomingElectric Power67%Establish
Xuwen Wind Power173,190,000ZhanjiangZhanjiangElectric Power53.51%Establish
Huadu Natural gas497,000,000GuangzhouGuangzhouElectric Power65%Establish
Dapu Power Generation1,907,100,000MeizhouMeizhouElectric Power100%Establish
Leizhou Wind Power109,803,900ZhanjiangZhanjiangElectric Power62.52%Establish
Dianbai Wind Power171,872,900MaomingMaomingElectric Power76.44%Establish
Zhanjiang Company2,275,440,000ZhanjiangZhanjiangElectric Power76%Business combinations involving enterprises under common control
Yuejia Company756,000,000MeizhouMeizhouElectric Power58%Business combinations involving enterprises under common control
Shaoguan Power Generation1,070,000,000ShaoguanShaoguanElectric Power95.36%Business combinations involving enterprises under common controlcontrol
Zhongyue Company2,021,300,000ZhanjiangZhanjiangElectric Power92.81%Business combinations involving enterprises under common control
Electric sales500,000,000GuangzhouGuangzhouElectric Power100%Establish
Qujie Wind Power2,527,239,000ZhanjiangZhanjiangElectric Power75.16%Establish
Yangjiang Wind Power1,192,660,000YangjiangYangjiangElectric Power69.87%Establish
Lincang Company1,119,790,000LinangLincangElectric Power100%Business combinations involving enterprises not under common control
Guangqian Company1,030,292,500ShenzhenShenzhenElectric Power100%Business combinations involving enterprises under common control
Huizhou Natural gas1,499,347,500HuizhouHuizhouElectric Power67%Business combinations involving enterprises under common control
Pinghai Power Generation1,370,000,000HuizhouHuizhouElectric Power45%Business combinations involving enterprises under common control
Shibeishan Wind Power231,700,000JieyangJieyangElectric Power53.51%Business combinations involving enterprises under common control
Red Bay Company2,749,750,000ShanweiShanweiElectric Power65%Business combinations involving enterprises under common control
Guangdong Wind Power12,690,914,600GuangzhouGuangzhouElectric Power76.44%Business combinations involving enterprises not under common control
Tongdao Wind Power106,500,000HuaihuaHuaihuaElectric Power76.44%Establish
Huilai Wind Power59,000,000JieyangJieyangElectric Power68.67%Business combinations involving enterprises not under common control
Hongrui Technology20,000,000ShaoguanShaoguanElectric Power95.36%Establish
Yongan Natural gas550,000,000ZhaoqingZhaoqingElectric Power90%Establish
Xupu Wind Power104,910,000HuaihuaHuaihuaElectric Power76.44%Establish
Wuxuan Wind Power96,520,000LaibinLaibinElectric Power76.44%Establish
Pingdian Integrated Energy Company20,000,000HuizhouHuizhouElectric Power45%Establish
Zhuhai Wind Power1,128,634,000ZhuhaiZhuhaiElectric Power56.78%Establish
Dayawan Company764,000,000HuizhouHuizhouElectric Power70%Establish
Huaguoquan Company2,650,000ShenzhenShenzhenLease100%Business combinations involving enterprises not under common control
Nanxiong New Energy108,053,600ShaoguanShaoguanElectric Power76.44%Establish
Dananhai Company431,000,000JieyangJieyangElectric Power100%Establish
Qingzhou Offshore wind power3,293,270,000YangjiangYangjiangElectric Power76.44%Establish
Wanhaowei New Energy100,046,000ZhanjiangZhanjiangElectric Power76.44%Establish
Wanchuang Hengwei New Energy100,046,000ZhanjiangZhanjiangElectric Power76.44%Establish
Nanhua New Energy135,234,900ZhanjiangZhanjiangElectric Power38.98%Business combinations involving enterprises not under common control
Datang New Energy145,938,900GuangzhouGuangzhouElectric Power38.98%Business combinations involving enterprises not under common control
Yueneng Wind Power130,000,000ZhanjiangZhanjiangElectric Power38.98%Business combinations involving enterprises not under common control
Tumu Termal power Company1,006,523,900TumusukeTumusukeElectric Power79.48%Business combinations involving enterprises not under common control
Sha C Company2,500,000,000GuangzhouGuangzhouElectric Power51%Business combinations involving enterprises under common control
Guanghe Electric Power1,763,816,893GuangzhouGuangzhouElectric Power51%Business combinations involving enterprises under common control
Biomass power generation871,040,000ZhanjiangZhanjiangElectric Power51%Business combinations involving enterprises under common control
Xinhui power generation1,092,773,533JiangmenJiangmenElectric Power45.90%Business combinations involving enterprises under common control
Yunhe power generation1,086,689,318YunfuYunfuElectric Power90%Business combinations involving enterprises under common control
Yundian Energy40,000,000YunfuYunfuElectric Power56.25%Business combinations involving enterprises under common control
Yuehua power generation1,314,714,000GuangzhouGuangzhouElectric Power51%Business combinations involving enterprises under common control
YunhuaIntegrated Energy Company60,500,000GuangzhouGuangzhouElectricPower51%Businesscombinations involving enterprises under common control
Shangyang Energy120,820,000ZhanjiangZhanjiangElectric Power92.81%Acquisition of assets
Guidian Energy120,820,000ZhanjiangZhanjiangElectric Power92.81%Acquisition of assets
Shunfeng New Energy22,293,880ZhoukouZhoukouElectric Power76.44%Acquisition of assets
Jiandian New Energy31,350,000JiaozhuoJiaozhuoElectric Power76.44%Acquisition of assets
Lianjiang New Energy140,070,000ZhanjiangZhanjiangElectric Power76.44%Establish
Zhaocheng Yuefeng100,000LinfenLinfenElectric Power76.44%Establish
Wuhua New Energy38,590,000MeizhouMeizhouElectric Power76.44%Establish
Lineng New Energy77,050,000BaodingBaodingElectric Power76.44%Acquisition of assets
Inner New Energy314,550,000HoheotHoheotElectric Power76.44%Establish
Zhuhai New Energy285,297,600ZhuhaiZhuhaiElectric Power76.44%Establish
Dunan New Energy160,000,000LangfangLangfengElectric Power61.15%Acquisition of assets
Gaotang New Energy36,096,000LiaochengLiaochengElectric Power76.44%Acquisition of assets
Shaoguan New Energy48,317,720ShaoguanShaoguanElectric Power100%Establish
Hanhai New Energy644,050,000TumusukeTumusukeElectric Power100%Establish
Jinxiu Eney2,913,100LaibinLaibinElectric Power90%Establish
Muhong New Energy1,000,000JinchangJinchangElectric Power100%Acquisition of assets
Mujin New Energy120,495,920JinchangJinchangElectric Power100%Acquisition of assets
Huibo New Energy99,923,134HuozhouHuizhouElectric Power100%Establish
Dongrun Zhongneng New Energy22,304,520JiangmenJiangmenElectric Power100%Acquisition of assets
Runze Jieyuan New Energy22,758,500JiangmenJiangmenElectric Power100%Acquisition of assets
Maoming Natural gas135,700,000MaomingMaomingElectric Power85%Establish
Xingyue New Energy9,977,500MeizhouMeizhouElectric Power100%Establish
Huixin Thermo Electricity293,500,000HuozhouHuizhouElectric Power85%Establish
Shache Energy1,256,610,470KashgarKashgarElectric Power100%Acquisition of assets
Xinguangyao New Energy46,522,828QingdaoQingdaoElectric Power99%Acquisition of assets
Telian New Energy45,774,873QingdaoQingdaoElectric Power99%Acquisition of assets
Jiuzhou New Energy40,680,000ZhaoqingZhaoqingElectric Power100%Acquisition of assets
Changshan Wind Power110,740,000XiangtanXiangtanElectric Power100%Acquisition of assets
Luoding New Energy1,844,520YunfuYunfuElectric Power100%Establish
Zhuhai New Enegy5,000,000ZhuhaiZhuhaiElectric Power100%Establish
Zhenneng New Energy10,000,000YunfuYuunfuElectric Power100%Establish
Zhonggong Energy152,969,360MaomingMaomjingElectric Power100%Acquisition of assets
Yahua New Energy152,969,360MaomingMaomjingElectric Power100%Acquisition of assets
Xinjiang Company1,300,000,000UrumaiUrumaiElectric Power100%Establish
Xinjiang Energy50,000,000UrumaiUrumaiElectric Power100%Establish
Gaozhou NewEnergy1,476,800MaomingMaomingElectric Power100%Establish
Xintian Yuefeng2,000,000YongzhouYongzhouElectric Power76.44%Establish
Lianjiang Hangneng84,400,000ZhanjiangZhanjiangElectric Power76.44%Acquisition of assets
Guangxi Hangneng179,000,000LaibinLaibinElectric Power76.44%Acquisition of assets
Jincheng Yuefeng176,940,000JinchengJinchengElectric Power68.80%Establish
Baiyin Yuefeng128,187,900BaiyinBaiyinElectric Power76.44%Establish
Yuncheng Wanquan122,118,900YunchengYunchengElectric Power72.62%Establish
Tuokexun Energy370,000,000TurpanTurpanElectric Power100%Establish
Yehai Yuefeng112,010,000HainanHainanElectric Power76.44%Establish
Zhuhai Yuefeng50,000,000ZhuhaiZhuhaiElectric Power38.98%Establish
Zhanjiang Yuefeng50,000,000ZhanjiangZhanjiangElectric Power38.98%Establish
Zhuhai Yuefeng17,191,660ZhuhaiZhuhaiElectric Power76.44%Establish
Shantou Yuefeng1,110,750,000ShantouShantouElectric Power15.40%Establish
Herun New Energy136,533,400HaozhouHaozhouElectric Power15.40%Acquisition of assets
Pingyuan Wind Power221,074,300MeizhouMeizhouElectric Power15.40%Establish
Yuefeng Ruisi300,000GuangzhouGuangzhouElectric Power76.44%Establish
Xiangzhou Yunjiang105,420,000laibinLaibinElectric Power76.44%Acquisition of assets
XiangzhouHangjing199,980,000laibinLaibinElectricPower76.44%Acquisitionof assets
Karamay integrated energy source20,000,000karamaykaramay cityElectric Power100%Establish
Hannan Longyao90,000,000QinghaiQinghaiElectric Power100%Acquisition of assets
Zhongshan Energy Service15,000,000ZhongshanZhongshanElectric Power100%Establish
Yudean New Energy100,000,000GuangzhouGuangzhouElectric Power100%Establish
Dongguan Ningzhou4,745,908,400DongguanDongguanElectric Power19.99%0.03%Establish
Binhaiwan Company1,040,000,000DongguanDongguanElectric Power19.99%0.03%Establish
Beibuwan Wind Power1,000,000,000ZhangjiangZhangjiangElectric Power38.22%Establish
Yudean Testing5,000,000GuangzhouGuangzhouMantenace100%Establish
Yudean Linghang300,000GuangzhouGuangzhouElectric Power100%Establish
Turpan New Energy10,000,000TurpanTurpanElectric Power100%Establish
Ruisi New Energy2,144,750,000HuaihuaHuaihuaElectric Power15.32%Establish
Lanshan Yuefeng198,174,000YongzhouYongzhouElectric Power15.32%Establish
Qinglong Photovoltaic237,600,000QinhuangdaoQinhuangdaoElectric Power15.32%Acquisition of assets
Qiyang New Energy100,000YongzhouYongzhouElectric Power100%Establish

Explanation on share-holding ratio in subsidiary different from ratio of voting right:

(1) On 30 November 2018, Maoming Thermal merged Guangdong Energy Maoming Thermal Power Station Co., Ltd., wholly-owned by GEGC. After the merger, GEGC held 30.12% equity of Maoming Thermal. According to the agreement between the Company and GEGC, Guangdong Electric Power Development Co., Ltd., a subsidiary of Guangdong Energy Group Company, holds 15.02% equity ,the delegated shareholder and director from GEGC maintain consensus with those of the Company while exercising the voting rights during the shareholders’ meeting and the Board of Directors’ meeting at Maoming Thermal. Therefore, the Company owns control power over Maoming Thermal.

(2) Pinghai Power was acquired from GEGC by the Group in 2012 through offering non-public shares. According to the agreement between GEGC and Guangdong Huaxia Electric Power Development Co., Ltd. (“Huaxia Electric”), which holds 40% equity in Pinghai Power, the delegated shareholder and director from Huaxia Electric maintain consensus with those of GEGC when exercising their voting rights during the shareholders’ meeting and Board of Directors’ meeting at Pinghai Power; besides, after GEGC transfers its 45% equity in Pinghai Power to the Company, the delegated shareholder and director from Huaxia Electric also reach consensus with those of the Company when exercising their voting rights during the shareholders meeting and Board of Directors’ meeting at Pinghai Power. Therefore, the Company owns the control power over Pinghai Power.

2. Basis for holding half or less voting rights but still controlling the investee, and holding more than half voting rights but not controlling the investee:

1) Guangdong Wind Power, a subsidiary of the Group, held 51% shares of AVIC Shenxin. According to the Articles of Association of AVIC Shenxin, the resolutions made at the shareholders' meeting must be unanimously approved by shareholders representing more than two thirds of the voting rights. Therefore, Guangdong Wind Power a subsidiary of the Group, and Inner Mongolia Electric Power Survey & Design Institute Co., Ltd., which holds 49% of the shares, jointly control AVIC Shenxin.

2) Guangdong Wind Power, a subsidiary of the Group, held 54.6% shares of Yuexin Energy. According to the company's Articles of Association, if the Guangdong Wind Power fails to reach the control requirement, China Aviation Industry Renewable Energy Corporation will control Yuexin Energy.

GF Securities Asset Management (Guangdong) Co., Ltd. ("GF Securities") issued the Guangdong Wind Power Company New Energy Infrastructure Investment Green Carbon Neutrality Asset-Backed Special Plan in 2024, using the wind power projects held by the Group’s subsidiaries, Dianping Yuanfeng and Herun New Energy, as the underlying assets. In accordance with the requirements of No. 33 of Accounting Standards for Business Enterprises - Consolidation, the company included one structured entity that meets the definition of "control" in the scope of consolidated statements. As of June 30, 2026, the equity of the aforementioned structured entity attributable to the Group was RMB1,607,760,517, and the equity attributable to other equity holders was presented as minority shareholders' equity in the consolidated statements, which the total amount was RMB6,554,043,895.

Basis on determining to be an agent or consignor:

Not applicable

Other note:

None

(2)Significant not wholly-owned subsidiaries In RMB

NameHolding proportion of non-controlling interestProfit or loss attributable to non-controlling interestDividend declared to non-controlling interestClosing balance of non-controlling interest
Wind Power Company23.56%1,012,59303,649,413,594
Pinghai Power Generation55%85,755,189139,692,1411,239,197,184
Jinghai Company35%18,353,88940,014,5981,730,768,988
Red Bay Company35%-17,094,36160,017,3411,369,675,598
Zhanjiang Electric24%-6,395,3050709,320,942
Huizhou Natural gas33%8,790,97929,961,184678,546,947
Bohe Company33%-25,345,3310836,727,603

Explanation on share-holding ratio of minority different from ratio of voting right:

None

Other note:

None

(3)Main financial information of significant not wholly-owned subsidiaries

In RMB

SubsidiariesClosing balanceBeginning balance
Current assetsNon-current assetsTotal assetsCurrent liabilitiesNon-current LiabilitiesTotal liabilitiesCurrent assetsNon-current assetsTotal assetsCurrent liabilitiesNon-current LiabilitiesTotal liabilities
Wind Power Company9,744,566,62350,440,542,90460,185,109,5278,453,131,81732,305,090,02840,758,221,8459,587,839,58951,145,809,25560,733,648,8448,851,512,55134,241,942,21343,093,454,764
Pinghai Power Generation1,549,057,1121,930,419,1303,479,476,242687,439,881516,410,9421,203,850,8231,325,685,1472,044,083,1853,369,768,332568,431,350435,160,9421,003,592,292
Jinghai Company2,313,750,20013,319,915,20715,633,665,4078,448,919,7952,239,691,36010,688,611,1551,785,011,93212,949,768,70614,734,780,6387,715,483,1632,018,255,8139,733,738,976
Red Bay Company2,108,500,4437,298,106,2499,406,606,6923,064,056,1222,445,233,2905,509,289,4121,194,433,1476,759,318,4447,953,751,5912,472,180,9522,138,441,2094,610,622,161
Zhanjiang Electric2,449,345,7971,098,068,3143,547,414,111547,732,36844,177,818591,910,1862,270,033,8961,150,073,0783,420,106,974399,425,13744,356,381443,781,518
Huizhou Natural gas691,974,4792,145,693,5862,837,668,065781,117,4406,991,865788,109,305446,097,0442,251,325,6892,697,422,733582,248,2585,025,144587,273,402
Bohe Company1,602,886,05710,809,391,72712,412,277,7843,466,048,4236,305,889,0589,771,937,4811,418,060,78711,228,805,00812,646,865,7953,321,748,1256,727,241,44310,048,989,568

In RMB

SubsidiariesAmount of current periodAmount of previous period
Operating revenueNet profitTotal comprehensive incomeCash flow from operating activitiesOperating revenueNet profitTotal comprehensive incomeCash flow from operating activities
Wind Power Company1,621,002,98939,321,83739,321,8372,012,889,0631,668,200,633226,850,521226,850,521880,331,440
Pinghai Power Generation2,068,633,957155,918,526155,918,526381,950,9201,681,842,479144,925,480144,925,480170,083,737
Jinghai Company3,634,106,98752,439,68352,439,6831,043,968,0512,213,247,35180,350,06680,350,066327,287,764
Red Bay Company1,770,911,612-48,841,031-48,841,031348,231,3912,184,779,251112,145,548112,145,548326,613,953
Zhanjiang Electric923,772,472-26,647,104-26,647,10436,433,058900,748,380-8,369,913-8,369,9133,838,324
Huizhou Natural gas1,292,823,67519,997,10419,997,104157,157,6461,333,054,12560,973,41360,973,413397,274,355
Bohe Company2,991,299,74736,240,90136,240,901383,948,310935,488,571-61,897,670-61,897,670326,576,596

Othe note:

None

(4) Significant restrictions of using enterprise group assets and pay off enterprise group debt

None

(5) Provide financial support or other support for structure entities incorporate into the scope of consolidated financial statements

None

Other note

None

2. The transaction of the Company with its owner’s equity share changed but still controlling the subsidiary

(1) Note to owner’s equity share changed in subsidiary

None

(2) The transaction’s influence to equity of minority shareholders and attributable to the owner's equity of the parent company

In RMB

Purchase cost/disposal consideration
--Cash
--Fair value of non-cash assets
Purchase cost/total disposal consideration
Less: Subsidiary's share of net assets calculated based on the proportion of acquired/disposed equity
Difference
Including: Adjust capital public reserve
Adjust surplus public reserve
Adjusted retained profit

Other note None

3. Equity in joint venture arrangement or associated enterprise

(1) Significant joint venture arrangement or associated enterprise

Name of SubsidiaryMain Places of OperationRegistration PlaceNature of BusinessShareholding Ratio (%)The accounting treatment of investment in associates
directindirect
Industry FuelGuangzhouGuangzhouFuel trade50%Equity method
Shanxi Yudean EnertyTaiyuanTaiyuanCoal Transportation and port operations investment40%Equity method
Energy FinanceGuangzhouGuangzhouFinancial25%15%Equity method
Taishan Power GenerationTaishanTaishanPower Generation20%Equity method
Energy Financing Leasing CompanyGuangzhouGuangzhouFinancing Leasing25%Equity method

None

Basis of the voting rights with 20% below but with major influence, or without major influence but with over 20% (20% included) voting rights hold:

None

(2)Main financial information of Significant joint venture

In RMB

Amount of current periodAmount of previous period
Industry FuelIndustry Fuel
Current assets8,555,099,8555,928,805,453
Including: Balance of cash and cash equivalents2,610,404,6792,329,593,623
Non-current assets11,925,202,49011,595,751,390
Total of assets20,480,302,34517,524,556,843
Current liabilities9,581,886,7424,708,000,422
Non current liabilities5,694,100,1157,790,617,390
Total liabilities15,275,986,85712,498,617,812
Minority shareholder Equity2,035,467,3411,925,893,095
Attributable to shareholders of the parent company3,168,848,1453,100,045,936
Share of net assets calculated by stake1,584,424,0731,550,022,968
Adjustment item
--Goodwill
-- Internal transactions did not achieve profit-77,570,539-143,427,814
--Other
Book value of equity investment in joint venture1,506,853,5341,406,595,154
The fair value of the equity investment of a joint venture with a public quotation
Business income18,437,428,62212,893,934,598
Financial expenses92,309,962125,459,271
Income tax59,128,07919,743,502
Net profit255,157,53485,252,136
Net profit from terminated operation
Other comprehensive income
Total comprehensive income255,157,53485,252,136
Dividends received from the joint venture this year18,821,80023,282,400

(3) Main financial information of significant associated enterprise In RMB

Closing balance/This periodOpening balance/Last period
Shanxi EnergyEnergy FinanceTaishan Power GenerationEnergy Financing Leasing CompanyShanxi EnergyEnergy FinanceTaishan Power GenerationEnergy Financing Leasing Company
Current assets3,340,765,59921,021,264,2965,242,983,6931,140,515,9403,384,275,80719,537,225,6304,183,081,2141,145,499,414
Non-current assets10,841,778,79819,705,378,6277,325,573,59714,591,292,24710,524,523,25019,204,331,0977,579,403,50114,934,349,985
Total of assets14,182,544,39740,726,642,92312,568,557,29015,731,808,18713,908,799,05738,741,556,72711,762,484,71516,079,849,399
Current liabilities512,566,72036,164,669,1672,290,133,9133,388,028,954517,333,08434,245,116,0351,320,559,4752,336,437,884
Non-current liabilities2,908,227,29910,111,0253,024,0899,074,736,5252,909,525,82012,229,04272,191,99210,613,499,811
Total liabilities3,420,794,01936,174,780,1922,293,158,00212,462,765,4793,426,858,90434,257,345,0771,392,751,46712,949,937,695
Minority shareholder Equity25,389,65700024,696,29001,525,9080
Attributable to shareholders of the parent company10,736,360,7214,551,862,73110,275,399,2883,269,042,70810,457,243,8634,484,211,65010,368,207,3403,129,911,704
Share of net assets calculated by stake4,294,544,2871,820,745,0922,055,079,858817,260,6774,182,897,5441,793,684,6602,073,641,468782,477,926
Adjustment item
--Goodwill013,325,00000013,325,00000
-- Internal transactions did not achieve profit00000000
--Other00037,500,00000062,489,352
Book value of equity investment in joint venture4,294,544,2871,834,070,0922,055,079,858854,760,6774,182,897,5441,807,009,6602,073,641,468844,967,278
The fair value of the equity investment of a joint venture with a public quotation
Business income174,643,232351,088,6005,379,237,635167,743,425217,900,571363,978,2383,892,347,238171,769,507
Net profit277,520,694209,860,303425,581,38839,173,596294,422,917219,141,470143,964,62644,115,985
Net profit from terminated operation
Other comprehensive income00000-152,717,92500
Total comprehensive income277,520,694209,860,303425,581,38839,173,596294,422,91766,423,545143,964,62644,115,985
Dividends received from the associated enterprise this056,883,689100,480,9290092,152,10300
year

Other note

In 2024, the Company increased its capital by 250 million yuan to Guangdong Energy Financial Leasing Co., Ltd., and as of June 30, 2026, another shareholder accounting for 25% of the shares failed to contribute capital, resulting in a difference of RMB 37,500,000 between the book value of the Company's equity investment in the associate and the share of net assets calculated by shareholding ratio.

(4) Summary financial information of insignificant joint venture or associated enterprise

In RMB

Amount of current periodAmount of previous period
Joint venture:
The total number of the following171,490,072174,115,981
Share of net assets calculated by stake
----Net Profit-2,625,909-1,957,024
-Other comprehensive income00
-- Total comprehensive income-2,625,909-1,957,024
Associated enterprise:
Total investment book value1,067,675,8971,054,229,134
The total number of the following
--Net Profit37,516,08725,929,888
-Other comprehensive income-972,047-379,240
-- Total comprehensive income36,544,04025,550,648

Other note: None

(5) Note to the significant restrictions of the ability of joint venture or associated enterprise transfer funds to the Company None

(6) The excess loss of joint venture or associated enterprise

In RMB

Name of joint venture or associated enterpriseUnrecognized losses accumulated in previous periodsUnrecognized losses in this period (or net profit shared in this period)Unrecognized losses accumulated at the end of the period
Yunfu Power Generation( B) Co., Ltd.-2,872,442-3,969,791-6,842,234
Yunnan Nengtou Weixin Energy Co., Ltd.-47,212,80614,230,432-32,982,374

(7) The unrecognized commitment related to joint venture investment

None

(8) Contingent liabilities related to joint venture or associated enterprise investment None

4. Significant common operation

NameMain operation placeRegistered placeBusiness natureShare-holding ratio/share enjoyed
DirectlyIndirectly

Share-holding ratio or shares enjoyed different from voting right ratio:

None

If the co-runs entity is the separate entity, basis of the co-runs classification None

5. Equity in structuring entity that excluding in the consolidated financial statement

None

6.Other

None

XI. Government subsidy

1. Government subsidies recognized according to the receivable amount at the end of the reporting period

□Applicable <sup></sup>Not applicable

The reason for not receiving the estimated amount of government subsidies at the expected point in time □Applicable <sup></sup>Not applicable

2. Liabilities involving government subsidies

<sup></sup>Applicable □Not applicable

In RMB

Accounting subjectBeginning balanceNew subsidy amount this yearAmount included in non-operating income this yearAmount transferred to other incomethis yearOther changes this yearEnding balanceRelated to assets/income
Deferred income141,794,31242,647,7743,444,664180,997,422Asset-related

3. Government subsidies included in the current profit and loss

<sup></sup>Applicable □Not applicable

In RMB

Accounting itemsAmount incurred in the current periodAmount incurred in the previous period
Other income3,444,6643,522,395

Other note:

ItemAmount incurred in the current periodAmount incurred in the previous period
Special national bonds for desulfurization projects671,065671,065
Denitrification projects651,784651,784
2012 Provincial Energy Conservation Special Fund414,38842,930
330MW Unit Energy Saving Renovation, Shao (CG [2015] No. 105)363,98377,698
2016 Central Government Fiscal Energy Conservation and Emission Reduction Funds for Prior-Year Policy Settlement, SC [2016] No. 88329,370539,052
2021 Shaoguan Municipal Award Funds for Supporting Enterprise Technological Transformation (SCG [2021] No. 39)242,3086,523
2021 Provincial Special Enterprise Technological Transformation Funds166,250363,983
2019 Special Fund for the Battle Against Pollution – Motor Energy Efficiency Improvement Project Subsidy129,169129,169
2016 Central Government Fiscal Energy Conservation and Emission Reduction Funds for Prior-Year Policy Settlement, SC [2016] No. 10886,099204,706
#1-#3 Unit 6KV Feed Pump Energy Saving Renovation Project85,83385,833
Settlement of funds for the (Fourth Batch) of Typical Demonstration Projects under the Comprehensive Demonstration City for Energy Conservation and Emission Reduction Fiscal Policy in Shaoguan City77,69886,099
Government Grants for the Exhibition Hall of Caohu Economic Development Zone Photovoltaic Industrial Park69,12869,128
ZCG [2020] No. 103 – 2020 Anti-Epidemic Special National Bond Funds (Enterprise Technological Transformation)31,92552,135
Coal Yard Enclosed Renovation Project31,66731,667
2021 Provincial Special Enterprise Technological Transformation Funds (Second Batch)20,833166,250
Project Fiscal Expenditure Subsidies20,00065,000
#2 Start-up Boiler Low-NOx Burner Renovation17,56517,565
2021 Provincial Special Enterprise Technological Transformation Funds for Promoting High-Quality Economic Development17,46928,527
Subsidy Funds for the Construction of the Energy Management Information System6,66720,000
Renovation of Unit Diesel Generator Control Circuit and Grid-Connection Cabinet5,280-
2025 #1 Gas Turbine C-Overhaul Combustion Chamber Component Improvement2,051-
Interest Subsidy for the Urea Substitution for Liquid Ammonia Project1,825-
Overheating Remediation of the Wall of Module 4 of #1 Heat Recovery Steam Generator, Weld Inspection of the Upper Header Pipes, and Technical Renovationof the Wall-Penetrating Expansion Joints813-
#2 Gas Turbine Flame Monitoring System Upgrade and Renovation Project564-
#1 Heat Recovery Steam Generator Steam-Water System Sampling High-Temperature Panel Project Engineering381-
Replacement of Drainage Pipelines in the Medium- and Low-Pressure Steam-Water Systems of Heat Recovery Steam Generators No. 1, 2, and 3219-
Upgrade and Renovation of the Isolated-Phase Enclosed Busbar Drying Devices for Generator-Transformer Units #1 to #3135-
Replacement of Discharge Pipes for Circulating Water Pumps of Units #1, #2, and #398-
Marine Biofouling Prevention Renovation of the Circulating Water Inlet Chambers of Unit #1 and Unit #397-
Special Funds for the Battle Against Pollution (Green Circular Development and Energy Conservation & Consumption Reduction) Issued by the Huidong County Science, Technology, Industry and Information Technology Bureau-19,231
Social Security Subsidies-194,050
Total3,444,6643,522,395

XII. Risks Related to Financial Instruments

1.Risks arising from financial instruments Not applicable

2. Hedging

(1) The Company conducts hedging business for risk management

□Applicable <sup></sup>Not applicable

(2) The Company conducts qualified hedging business and applies hedge accounting None

(3) The Company conducts hedging business for risk management and expects to achieve risk management objective but does not apply hedge accounting

□Applicable <sup></sup>Not applicable

3. Financial assets

(1) Classification of transfer methods

□Applicable <sup></sup>Not applicable

(2) Financial assets that have been derecognized as a result of a transfer

□Applicable <sup></sup>Not applicable

(3) Financial assets of continued involvement in asset transfer

□Applicable <sup></sup>Not applicable

Other note:

None

XIII. The disclosure of the fair value

1. Closing fair value of assets and liabilities calculated by fair value

In RMB

ItemClosing fair value
Fair value measurement items at level 1Fair value measurement items at level 2Fair value measurement items at level 3Total
I. Continuous fair value measurement--------
(3) Other equity instrument investment1,625,273,04201,232,261,8222,857,534,864
II Inconsistent fair value measurement--------

2.Recognized basis for the market price sustaining and non-persistent measured by fair value on firstorder

For financial instruments that are not traded in active markets, the Group adopts valuation techniques to determine their fair value.

3. Valuation technique and qualitative and quantitative information on major parameters for the fair value measure sustaining and non-persistent on second-order

Not applicable

4. Valuation technique and qualitative and quantitative information on major parameters for the fair value measure sustaining and non-persistent on third -order

The fair value of financial instruments traded in an active market is determined at the quoted market price; and the fair value of those not traded in an active market is determined by the Group using valuation techniques. The Group adopt such valuation models as cash flow discounting model and comparable company in the market to evaluate the fair value of the other equity instrument of Level 3 financial assets. The Group adopts average price to book value ratio (PB) and discounts for lack of marketability (DLOM) as major unobservable inputs for SCG.

5.Continuous thirdlevel fair value measurement project, adjustment information between the opening an d closing book value and sensitivity analysis of unobservable parameters

Not applicable

6.The reasons for the conversions and the policies for determining the timing of the conversions for continuous fair value measurement items where conversions between various levels occurred during the current period

The Group takes the occurrence date of the event that leads to the transition between different levels as the time to confirm the transition between different levels. This year, there is no transition among the first level, the second level and the third level.

7. Changes in valuation technology during the current period and the reasons for the changes

Not applicable

8. Financial assets and liability not measured by fair value

The Group's financial assets and liabilities measured in amortized cost mainly include: accounts receivable, other receivables, long-term receivables, short-term loans, fund payable, long-term loans, bonds payable and longterm payables.

There is no significant difference between the book value and fair value of the Group's financial assets and financial liabilities that are not measured at fair value.

9.Other

None

XIV. Related parties and related-party transactions

1. Parent company information of the enterprise

Parent company nameRegistration placeNatureRegistered capitalShare ratio of parent company against the company(%)Vote right ratio of parent company against the company(%)
Guangdong Energy GroupGuangzhouOperation and management of power generation enterprises, capital management of electricity assets, construction of power plant and sales of electricity23.3 billion65.74%65.74%

Explanation on parent company of the enterprise

On August 8, 2001, Guangdong Provincial Government had taken the lead in the implementation of the reform of electric power system. Guangdong Electric power Group was established by inheriting the electricity generation business of Guangdong electric Power Group Company and its registered capital is RMB 23 billion, with 76% stake held by Guangdong Provincial People's Government and 24% stake held by China Hua Neng Group, By the end of 2025, owning more than 18,000 staff, and the company is the strongest

On February 18,2019, With the approval of the state-owned assets supervision and administration commission of the Guangdong provincial people's government and the approval of the Guangdong provincial market supervision administration, the former Guangdong Energy group Co., Ltd. was renamed as Guangdong Energy Group Co., Ltd

Ultimate controller of the Company is Guangdong Provincial People’s Government state owned assets supervision and Administration Commission.

Other note

2.Subsidiary of the Enterprise

See to Notes X..

3.Cooperative enterprise and joint venture

See Notes X..

Other cooperative enterprise and joint venture that have related transaction with the Company in the Period or occurred in previous period:

NameRelationship
Yudean Fuel CompanyJoint venture
Zhonghang Shenxin Wind Generation Co., Ltd.Joint venture
Energy Group Finance CompanyAssociate
Guangdong Energy Financing Leasing Co., Ltd.Associate
Yunfu Power Generation ( B plant) Co., Ltd.Associate
Yudean Shipping CompanyAssociate

Other note

4.Other related party

Other related partyRelationship with the Enterprise
Zhuhai Special Economic Zone Guangzhu Power Generation Co., Ltd.Controlled by Energy Group
Guangdong Zhongshan Thermal Power Plant Co., Ltd.Controlled by Energy Group
Guangdong Yudean Environmental protection Co., Ltd.Controlled by Energy Group
Guangdong Energy Group Natural gas Co., Ltd.Controlled by Energy Group
Shenzhen Tianxin Insurance Brokerage Co., Ltd.Controlled by Energy Group
Guangdong Yudean Environmental protection material Co., Ltd.Controlled by Energy Group
Huizhou Natural gas Co., Ltd.Controlled by Energy Group
Inner Mongolia Menghua New Energy Co., Ltd.Controlled by Energy Group
Guangdong Yudean Property Management Co., Ltd.Controlled by Energy Group
Guangdong Zhuhai Jinwan Power Generation Co., Ltd.Controlled by Energy Group
Shaoguan Qujiang Yudean New Energy Co., Ltd.Controlled by Energy Group
Guangdong Zhuhai Gaolan Environmental protection Technology Co., Ltd.Controlled by Energy Group
Baiyun Ebo Yuemeing New Energy Co., Ltd.Controlled by Energy Group
Guangdong Energy Group Technology Research institute Co., Ltd.Controlled by Energy Group
Guangdong Energy Property Insurance Co., Ltd.Controlled by Energy Group
Guangdong Yudean Information Technology Co., Ltd.Controlled by Energy Group
Guangdong Energy Group Enterprise Services Co., Ltd.Controlled by Energy Group
Dongguan Mingyuan Hotal Co., Ltd.Controlled by Energy Group
Guangdong Yangjiang Port Co., Ltd.Controlled by Energy Group
Jieyang Yudean Shipping Service Co., Ltd.Controlled by Energy Group
Alxa League Yudean New Energy Co., Ltd.Controlled by Energy Group
Guangdong Energy Bohe Fuel Co., Ltd.Controlled by Energy Group
Guangdong Energy Group Huizhou Natural Gas Development Co., Ltd.Controlled by Energy Group
uangdong Energy Group Energy Conservation and Carbon Reduction Co., Ltd.Controlled by Energy Group
Guangdong Shaoguan Port Co., Ltd.Controlled by Energy Group
Guangdong Energy Shajiao C plantControlled by Energy Group
Guangdong Yuelong Power Generation Co., Ltd.Controlled by Energy Group
Guangdong Yudean Real Estate Investment Co., Ltd.Controlled by Energy Group
Qiyang Yudean New Energy Co., Ltd.Controlled by Energy Group
Shanmenxia Guangneng New Energy Co., Ltd.Controlled by Energy Group
Shanwei Yudean Shipping Service Co., Ltd.Controlled by Energy Group
Taishan Nuclear Power Joint Venture Co., Ltd.Controlled by Energy Group

Other note

5. Related transactions.

(1)Related transactions on purchasing goods and receiving services

Acquisition of goods and reception of labor service

In RMB

Related partyContentCurrent amountApproval trading limitWhether over the trading limit(Y/N)Last amount
Yudean Environment ProtectionMaterial purchase112,562,889No91,149,667
Zhuhai Special Economic Zone Guangzhu Power Generation Co., Ltd.Electric purchase8,701,750No9,892,431
Guangdong Zhuhai Jinwan Power Generation Co., Ltd.Electric purchase10,422,048No6,355,169
Guangdong Yuelong Power Generation Co., Ltd.Electric purchase2,998,833No2,194,810
Zhongshan Thermal power plantElectric purchase7,663,413No5,262,238
Fuel CompanyFuel purchase13,623,013,908No9,396,514,816
Guangdong Energy Group Natural gas Co., Ltd.Fuel purchase4,247,248,554No4,609,165,298
Guangdong Energy, Marine & Fisheries Co., Ltd.Other392,794No0
Yuxian Yudean Xinlei Wind Power Generation Co., Ltd.Purchase green certificate0No219,046
Qianan Rongzhi Electric PowerCo., Ltd.Purchase green certificate0No134,131
Qianan Xiangan New Energy Co., Ltd.Purchase green certificate51,050No0
Wuxiang Yudean New Energy Co., Ltd.Purchase green certificate0No191,571
Laizhou Hanyang New Energy Co., Ltd.Purchase green certificate171,764No0
Tianshui Huineng Wind power Co., Ltd.Purchase green certificate105,392No0
Gangu Huineng Wind Power Co., Ltd.Purchase green certificate128,140No0
Hainan Yudean New Energy Co., Ltd.Purchase green certificate407,536No0
Yuerun Luoping New Energy Co., Ltd.Purchase green certificate431,165No0
Hainan Wenyang New Energy Power Generation Co., Ltd.Purchase green certificate260,310No0
Guangdong Energy Fuel Co., Ltd.Acceptance of management services122,047,848No24,217,675
Guangdong Yudean Information Technology Co., Ltd.Acceptance of management services5,465,985No5,417,002
Guangdong Yudean Shipping Co., Ltd.Acceptance of management services25,011,360No13,251,990
Guangdong Yangjiang Port Co., Ltd.Acceptance of management services5,267,050No7,949,403
Guangdong Energy Group Southwest (Guizhou) Electric Power Investment Co., LtAcceptance of management services484,277No207,546
Guangdong Energy Group Energy-saving and Carbon-reduction Co., LtdAcceptance of management services0No1,110,377
Guangdong Energy Group Enterprise Service Co., Ltd.Management services7,981,423No5,101,304
Guangdong Yudean PropertyManagement Co., Ltd.Property services31,599,022No24,907,809
Guangdong Energy Group Technology Research institute Co., Ltd.Acceptance of R & D Services426,415No0
Guangdong Energy Group Shajiao C plantReceipt of operational services3,077,997No266,000,000
Guangdong Energy Property Insurance Co., Ltd.Insurance Services30,501,496.10No27,654,948.74

Sales of goods and services

In RMB

Related partiesContentOccurred current termOccurred in previous term
Yudean Environment ProtectionSale of Material17,508,35146,920,540
Guangdong Zhuhai Gaolan Port Environment Protection Technology Co., Ltd.Sale of Material010,982,069
Guangdong Energy Group Huizhou Natural gas Development Co., Ltd.Sales of heat revenue46,46147,835
Guangdong Energy Group Shajiao C plantSales of green certificate0552,175
Guangdong Yuelong Power Generation Co., Ltd.Sales of green certificate072,910
Guangdong Zhuhai JinwanPower Generation Co., Ltd.Sales of green certificate120,057267,969
Zhuhai Special Economic Zone Guangzhu Power Generation Co., Ltd.Sales of green certificate0332,830
Guangdong Energy Group Shajiao C plantProvision of maintenance and repair services011,325,917
Guangdong Yudean Zhanshan Thermal power plantProvision of maintenance and repair services8,378,43512,612,453
Shaoguan Qujiang Yudean New Energy Co., Ltd.Provision of maintenance and repair services1,093,7781,094,722
Guangdong Yuelong Power Generation Co., Ltd.Provision of maintenance and repair services01,214,950
Guangdong Shaoguan Port Co., Ltd.Provision of maintenance and repair services653,1080
Zhuhai Special Economic Zone Guangzhu Power Generation Co., Ltd.Provision of maintenance and repair services8,525,13412,022,419
Guangdong Yuelong Power Generation Co., Ltd.Provide barge service1,020,8041,490,712
Yudean Shipping CompanyProvision of management services05,853
Inner Mongolia Yudean Menghua New Energy Co., Ltd.Provision of management services3,862,3962,791,955
Yudean Property Management Co., Ltd.Provision of management services62,83164,229
Zhonghang Shenxin WindProvision of management2,7550
Power Generation Co., Ltd.services
Guangzhou Development Zone Yudean New Energy Co., Ltd.Provision of management services07,116
Fuel CompanyProvision of management services080,023
Bohe Fuel CompanyProvision of management services76,8750
Yunfu Power Generation ( B plant) Co., Ltd.Provision of management services481,604482,604

Explanation on goods purchasing, labor service providing and receiving

(2) Related trusteeship/contract and delegated administration/outsourcing

Trusteeship/contract

In RMB

Name of the employerName of the undertakerAsset situation of the undertakerStart dateTerminating datePricing basisGains from the deal in report period
Guangdong Energy Group Co., Ltd.Guangdong Electric Power Development Co., Ltd.Shareholders' rights except ownership, income right and disposition rightJanuary 1,2018The custody fee charged to each first-class target company directly controlled by Guangdong Energy Group is 100,000 yuan/year, and the custody fee charged to each second-class target company indirectly controlled by Guangdong Yudean Group is 50,000 yuan/year. If the custody period is less than one complete fiscal year, the calculation formula of the custody fee of each target company is calculated according to the custody days. During the current period, there are 16 first-level subject companies that have been in custody for half a year, 4 second-level subject companies that have been in custody for half a year, The annual custody fee of the first-level subject companies is 1.6 million yuan, 800,000 yuan, the second-level subject companies is 200,000 yuan, and 100,000 yuan, totaling 900,000 yuan.900,000

Note

According to the instructions of Guangdong Energy Group on undertaking to perform related matters, in order to avoid horizontal competition and fulfill the commitments of related horizontal competition, the Company and Guangdong Energy Group have signed the Equity Trust Agreement, which entrusts the rights of shareholders of the Company within the trust scope of Guangdong Energy Group to the Company except for the rights of ownership, income and disposition. Charge RMB 100,000/year custody fees for each Guangdong Energy Group's direct holding primary target company; charge each indirectly controlling secondary target company 50,000/year custody fee. For details, please refer to the " Announcement on Related Party Transaction of the Signing of the “Equity Custody Agreement” by Guangdong Electric Power Development Co., Ltd with Guangdong Yudean Group Co., Ltd " (Announcement No.: 2018-04) disclosed in China Securities Journal, Securities Times, and Cninfo.com on January 13, 2018.

Explanation on related trusteeship/contract Delegated administration/outsourcing

None

(3) Related lease

As a lessor for the Company:: In RMB

LesseeAssets typeLease income recognized in the PeriodLease income recognized in prior Period
Dongguan Mingyuan Hotel Co., Ltd.Property Lease1,993,1601,993,160
Property CompanyProperty Lease283,746304,797
Yudean Environment ProtectionProperty Lease163,8100
Guangdong Energy Group Yunfu Xuneng Power Generation Co., Ltd.Property Lease12,1860
Guangdong Energy Group Shajiao C plantProperty Lease106,667136,667
Guangdong Energy Group Science and Technology Research Institute Co., LtdProperty Lease463,463388,564
Huizhou Natural gas Development Co., Ltd.Equipment lease1,733,4012,479,065

In RMB

LessorCategory of leased assetsRental charges for short-term and low-value assets (if any)Variable lease payments not included in lease liabilities measurement (if any)Rent paidInterest expenses on lease liabilities assumedIncreased use right assets
Amount of current periodAmount of previous periodAmount of current periodAmount of previous periodAmount of current periodAmount of previous periodAmount of current periodAmount of previous periodAmount of current periodAmount of previous period
Yudean Finance leaseFinancing leasing0000839,558,396.13466,461,083143,539,578.5795,680,562221,493,451.21630,161,868
Yudean Real EstateLeasing service60,780.800008,212,802.188,457,459430,041.56650,965518,311.2928,684,719
Guangdong Energy Group Zhuhai Investment Co., Ltd.House lease15,751.1015,751000136,5399,79411,8380733,330
Yunfu Power Generation Plant (B) Co., Ltd.Equipment lease031,9030011,10036,05030,454.06000

Explanation on related lease

None.

(4)Status of related party guarantee

As a guarantor for the company

In RMB

GuarantorGuarantee amountStart dateEnd dateExecution accomplished
Guangdong Energy Group Co., Ltd.1,631,520,000December 3,2019September 15,2043No

As a secured party for the Company

In RMB

GuarantorAmount guaranteeStarting dateDue dateGuarantee completed (Y/N)

(5) Inter-bank lending of capital of related parties: In RMB

Related partyAmount borrowed and loanedInitial dateDue dateNotes
Borrowed
Guangdong Energy Group Finance Co., Ltd.380,190,951February 5,2024August 30,2043
Guangdong Energy Group Finance Co., Ltd.339,000,000March 27,2025March 24,2028
Guangdong Energy Group Finance Co., Ltd.100,000,000February 26,2026February 25,2027
Guangdong Energy Group Finance Co., Ltd.10,307,886April 18,2025September 9,2042
Guangdong Energy Group Finance Co., Ltd.13,757,995December 5,2025September 9,2042
Guangdong Energy Group Finance Co., Ltd.140,000,000November 26,2025November 25,2026
Guangdong Energy Group Finance Co., Ltd.14,090,094May 9,2025September 9,2042
Guangdong Energy Group Finance Co., Ltd.16,854,011November 19,2025September 9,2042
Guangdong Energy Group Finance Co., Ltd.16,910,906January 28,2026September 9,2042
Guangdong Energy Group Finance Co., Ltd.190,000,000March 27,2026March 26,2027
Guangdong Energy Group Finance Co., Ltd.1,908,000September 10,2024September 9,2042
Guangdong Energy Group Finance Co., Ltd.19,123,244July 28,2025September 9,2042
Guangdong Energy Group Finance Co., Ltd.200,000,000August 28,2025August 27,2026
Guangdong Energy Group Finance Co., Ltd.50,000,000January 28,2026January 27,2027
Guangdong Energy Group Finance Co., Ltd.6,793,013June 23,2025September 9,2042
Guangdong Energy Group Finance Co., Ltd.70,000,000May 29,2026May 28,2027
Guangdong Energy Group Finance Co., Ltd.7,191,246January 24,2025September 9,2042
Guangdong Energy Group Finance Co., Ltd.7,798,460August 28,2025September 9,2042
Guangdong Energy Group Finance Co., Ltd.794,789March 27,2025September 9,2042
Guangdong Energy Group Finance Co., Ltd.8,150,631February 14,2025September 9,2042
Guangdong Energy Group Finance Co., Ltd.8,209,000September 13,2024September 9,2042
Guangdong Energy Group Finance Co., Ltd.826,592February 12,2026September 9,2042
Guangdong Energy Group Finance Co., Ltd.9,077,961December 26,2025September 9,2042
Guangdong Energy Group Finance Co., Ltd.9,114,680October 28,2025September 9,2042
Guangdong Energy Group Finance Co., Ltd.9,797,263November 27,2025September 9,2042
Guangdong Energy Group Finance Co., Ltd.9,947,949September 26,2025September 9,2042
Guangdong Energy Group Finance Co., Ltd.101,365,425June 25,2026June 24,2027
Guangdong Energy Group Finance Co., Ltd.18,203,273April 23,2026April 22,2027
Guangdong Energy Group Finance Co., Ltd.24,529,257March 24,2026March 23,2027
Guangdong Energy Group Finance Co., Ltd.29,845,414June 17,2026June 16,2027
Guangdong Energy Group Finance Co., Ltd.31,619,106April 10,2026April 9,2027
Guangdong Energy Group Finance Co., Ltd.62,095,293May 25,2026May 24,2027
Guangdong Energy Group Finance Co., Ltd.73,929,821April 24,2026April 23,2027
Guangdong Energy Group Finance Co., Ltd.11,991,667January 4,2022May 18,2035
Guangdong Energy Group Finance Co., Ltd.13,956,250December 31,2016August 15,2031
Guangdong Energy Group Finance Co., Ltd.14,208,333May 13,2021May 18,2035
Guangdong Energy Group Finance Co., Ltd.15,631,852December 28,2018December 27,2036
Guangdong Energy Group Finance Co., Ltd.2,154,167June 12,2020May 18,2035
Guangdong Energy Group Finance Co., Ltd.22,206,250December 31,2016August 15,2031
Guangdong Energy Group Finance Co., Ltd.3,529,412November 30,2016November 28,2031
Guangdong Energy Group Finance Co., Ltd.2,637,500December 23,2021May 18,2035
Guangdong Energy Group Finance Co., Ltd.270,385,161May 29,2020May 28,2040
Guangdong Energy Group Finance Co., Ltd.364,839December 30,2020December 29,2040
Guangdong Energy Group Finance Co., Ltd.3,883,333November 11,2021May 18,2035
Guangdong Energy Group Finance Co., Ltd.541,667June 30,2020May 18,2035
Guangdong Energy Group Finance Co., Ltd.6,083,333November 23,2020May 18,2035
Guangdong Energy Group Finance Co., Ltd.6,166,667July 28,2020May 18,2035
Guangdong Energy Group Finance Co., Ltd.6,812,500September 21,2020May 18,2035
Guangdong Energy Group Finance Co., Ltd.7,541,667December 16,2021May 18,2035
Guangdong Energy Group Finance Co., Ltd.7,908,333January 17,2022May 18,2035
Guangdong Energy Group Finance Co., Ltd.8,625,000May 19,2022May 18,2035
Guangdong Energy Group Finance Co., Ltd.9,550,000May 21,2020May 18,2035
Guangdong Energy Group Finance Co., Ltd.9,666,667February 3,2021May 18,2035
Guangdong Energy Group Finance Co., Ltd.100,000,000September 26,2025September 24,2026
Guangdong Energy Group Finance Co., Ltd.100,000,000February 9,2026February 3,2027
Guangdong Energy Group Finance Co., Ltd.50,000,000July 25,2025July 24,2026
Guangdong Energy Group Finance Co., Ltd.50,000,000August 22,2025August 21,2026
Guangdong Energy Group Finance Co., Ltd.90,000,000December 25,2025December 24,2026
Guangdong Energy Group Finance Co., Ltd.10,000,000March 13,2025June 19,2043
Guangdong Energy Group Finance Co., Ltd.130,000,000December 24,2025June 19,2043
Guangdong Energy Group Finance Co., Ltd.13,852,070April 17,2024June 20,2043
Guangdong Energy Group Finance Co., Ltd.14,087,001August 21,2025June 20,2043
Guangdong Energy Group Finance Co., Ltd.15,000,000July 27,2023June 20,2043
Guangdong Energy Group Finance Co., Ltd.15,000,000August 24,2023June 19,2043
Guangdong Energy Group Finance Co., Ltd.15,000,000August 24,2023June 20,2043
Guangdong Energy Group Finance Co., Ltd.15,847,876August 16,2024June 20,2043
Guangdong Energy Group Finance Co., Ltd.17,000,000September 8,2023June 20,2043
Guangdong Energy Group Finance Co., Ltd.21,270,733December 19,2024June 20,2043
Guangdong Energy Group Finance Co., Ltd.27,517,661September 15,2023June 20,2043
Guangdong Energy Group Finance Co., Ltd.29,900,410August 21,2025June 19,2043
Guangdong Energy Group Finance Co., Ltd.37,500,000January 29,2024June 19,2043
Guangdong Energy Group Finance Co., Ltd.5,282,625March 13,2025June 20,2043
Guangdong Energy Group Finance Co., Ltd.100,000,000March 30,2026March 29,2027
Guangdong Energy Group Finance Co., Ltd.468,063,800June 21,2026December 12,2026
Guangdong Energy Group Finance Co., Ltd.584,216,400June 21,2026December 21,2026
Guangdong Energy Group Finance Co., Ltd.12,403,997February 27,2024December 27,2042
Guangdong Energy Group Finance Co., Ltd.19,883,786May 13,2024December 27,2042
Guangdong Energy Group Finance Co., Ltd.25,000,000June 16,2023December 27,2042
Guangdong Energy Group Finance Co., Ltd.26,268,346July 26,2023December 27,2042
Guangdong Energy Group Finance Co., Ltd.3,513,675February 28,2023December 27,2042
Guangdong Energy Group Finance Co., Ltd.43,000,000February 14,2023December 27,2042
Guangdong Energy Group Finance Co., Ltd.47,262,936November 6,2023December 27,2042
Guangdong Energy Group Finance Co., Ltd.5,121,281February 2,2023December 27,2042
Guangdong Energy Group Finance Co., Ltd.7,147,642April 24,2023December 27,2042
Guangdong Energy Group Finance Co., Ltd.8,388,159August 2,2024December 27,2042
Guangdong Energy Group Finance Co., Ltd.30,000,000March 10,2026March 9,2027
Guangdong Energy Group Finance Co., Ltd.49,822,881May 14,2026May 13,2027
Guangdong Energy Group Finance Co., Ltd.86,967,702January 15,2021January 14,2041
Guangdong Energy Group Finance Co., Ltd.15,566,000May 27,2026January 26,2046
Guangdong Energy Group Finance Co., Ltd.2,942,015April 13,2026January 26,2046
Guangdong Energy Group Finance Co., Ltd.31,136,157February 5,2026January 26,2046
Guangdong Energy Group Finance Co., Ltd.3,935,393February 11,2026January 26,2046
Guangdong Energy Group Finance Co., Ltd.6,402,639April 28,2026January 26,2046
Guangdong Energy Group Finance Co., Ltd.66,021,600February 5,2026January 26,2046
Guangdong Energy Group Finance Co., Ltd.100,000,000November 17,2025November 16,2026
Guangdong Energy Group Finance Co., Ltd.100,000,000November 26,2025November 25,2026
Guangdong Energy Group Finance Co., Ltd.100,000,000May 26,2026May 25,2027
Guangdong Energy Group Finance Co., Ltd.100,000,000June 22,2026June 21,2027
Guangdong Energy Group Finance Co., Ltd.13,125,000June 11,2026December 21,2042
Guangdong Energy Group Finance Co., Ltd.21,875,000March 26,2025December 21,2042
Guangdong Energy Group Finance Co., Ltd.300,000,000December 12,2025December 11,2026
Guangdong Energy Group Finance Co., Ltd.300,000,000March 24,2026March 23,2027
Guangdong Energy Group Finance Co., Ltd.279,619,602January 1,2026May 26,2030
Guangdong Energy Group Finance Co., Ltd.25,992,848December 30,2025December 29,2043
Guangdong Energy Group Finance Co., Ltd.100,642,774May 17,2016May 16,2031
Guangdong Energy Group Finance Co., Ltd.20,000,000April 13,2026April 12,2027
Guangdong Energy Group Finance Co., Ltd.27,000,000January 26,2026January 25,2027
Guangdong Energy Group Finance Co., Ltd.30,000,000October 29,2025October 28,2026
Guangdong Energy Group Finance Co., Ltd.30,000,000February 11,2026February 10,2027
Guangdong Energy Group Finance Co., Ltd.50,000,000April 27,2026April 26,2027
Guangdong Energy Group Finance Co., Ltd.50,000,000June 25,2026June 24,2027
Guangdong Energy Group Finance Co., Ltd.10,200,000June 23,2022November 11,2041
Guangdong Energy Group Finance Co., Ltd.14,102,786April 20,2022November 11,2041
Guangdong Energy Group Finance Co., Ltd.25,500,000August 29,2022November 11,2041
Guangdong Energy Group Finance Co., Ltd.5,110,000July 25,2022November 11,2041
Guangdong Energy Group Finance Co., Ltd.8,000,000December 28,2022November 11,2041
Guangdong Energy Group Finance Co., Ltd.12,030,000September 23,2025December 22,2044
Guangdong Energy Group Finance Co., Ltd.13,400,000October 27,2025December 22,2044
Guangdong Energy Group Finance Co., Ltd.2,040,000September 28,2025December 22,2044
Guangdong Energy Group Finance Co., Ltd.2,730,000July 18,2025December 22,2044
Guangdong Energy Group Finance Co., Ltd.27,803,125December 27,2024December 22,2044
Guangdong Energy Group Finance Co., Ltd.30,000,000March 30,2026March 29,2027
Guangdong Energy Group Finance Co., Ltd.36,600,000October 30,2025December 22,2044
Guangdong Energy Group Finance Co., Ltd.5,860,000June 27,2025December 22,2044
Guangdong Energy Group Finance Co., Ltd.80,000,000September 29,2025September 28,2026
Guangdong Energy Group Finance Co., Ltd.579,620,527April 9,2020January 2,2040
Guangdong Energy Group Finance Co., Ltd.334,409,355June 29,2017July 20,2042
Guangdong Energy Group Finance Co., Ltd.50,000,000June 26,2026June 25,2027
Guangdong Energy Group Finance Co., Ltd.9,800,000June 29,2017July 20,2042
Guangdong Energy Group Finance Co., Ltd.224,292,647December 30,2024December 29,2026
Guangdong Energy Group Finance Co., Ltd.410,919,594September 29,2024September 25,2026
Guangdong Energy Group Finance Co., Ltd.1,029,167May 28,2020May 25,2035
Guangdong Energy Group Finance Co., Ltd.1,741,667June 22,2020May 25,2035
Guangdong Energy Group Finance Co., Ltd.20,000,000December 26,2025May 25,2035
Guangdong Energy Group Finance Co., Ltd.21,018,519May 25,2023May 25,2038
Guangdong Energy Group Finance Co., Ltd.2,137,500August 14,2020May 25,2035
Guangdong Energy Group Finance Co., Ltd.24,541,667November 12,2021May 25,2035
Guangdong Energy Group Finance Co., Ltd.29,739,130January 25,2022May 25,2035
Guangdong Energy Group Finance Co., Ltd.3,602,083June 28,2020May 25,2035
Guangdong Energy Group Finance Co., Ltd.4,130,435January 25,2022May 25,2035
Guangdong Energy Group Finance Co., Ltd.4,750,000July 22,2020May 25,2035
Guangdong Energy Group Finance Co., Ltd.5,383,333September 14,2020May 25,2035
Guangdong Energy Group Finance Co., Ltd.6,000,000December 29,2025May 25,2035
Guangdong Energy Group Finance Co., Ltd.6,045,455September 26,2022May 25,2035
Guangdong Energy Group Finance Co., Ltd.9,500,000October 23,2020May 25,2035
Guangdong Energy Group Finance Co., Ltd.12,000,000December 27,2021November 2,2035
Guangdong Energy Group Finance Co., Ltd.12,000,000January 19,2022November 2,2035
Guangdong Energy Group Finance Co., Ltd.20,800,000July 26,2021November 2,2035
Guangdong Energy Group Finance Co., Ltd.2,400,000January 22,2021November 2,2035
Guangdong Energy Group Finance Co., Ltd.7,200,000November 4,2020November 2,2035
Guangdong Energy Group Finance Co., Ltd.7,200,000November 19,2020November 2,2035
Guangdong Energy Group Finance Co., Ltd.8,000,000October 20,2021November 2,2035
Guangdong Energy Group Finance Co., Ltd.8,000,000December 10,2021November 2,2035
Guangdong Energy Group Finance Co., Ltd.8,000,000May 30,2022November 2,2035
Guangdong Energy Group Finance Co., Ltd.98,863,980February 23,2023February 20,2043
Guangdong Energy Group Finance Co., Ltd.59,000,000June 30,2023June 20,2043
Guangdong Energy Group Finance Co., Ltd.41,171,426March 30,2021March 29,2036
Guangdong Energy Group Finance Co., Ltd.160,000,000January 15,2026March 29,2027
Guangdong Energy Group Finance Co., Ltd.368,170,000August 27,2025December 21,2038
Guangdong Energy Group Finance Co., Ltd.121,870,251November 20,2025September 29,2044
Guangdong Energy Group Finance Co., Ltd.134,139,365February 20,2025September 29,2044
Guangdong Energy Group Finance Co., Ltd.45,864,211November 21,2024September 29,2044
Guangdong Energy Group Finance Co., Ltd.1,747,794December 27,2023September 26,2041
Guangdong Energy Group Finance Co., Ltd.1,987,750January 22,2025September 26,2041
Guangdong Energy Group Finance Co., Ltd.2,909,091December 25,2023September 26,2041
Guangdong Energy Group Finance Co., Ltd.3,203,618January 22,2024September 26,2041
Guangdong Energy Group Finance Co., Ltd.3,393,939September 27,2023September 26,2041
Guangdong Energy Group Finance Co., Ltd.3,749,423October 11,2023September 26,2041
Guangdong Energy Group Finance Co., Ltd.4,000,000January 15,2024September 26,2041
Guangdong Energy Group Finance Co., Ltd.4,656,885November 20,2023September 26,2041
Guangdong Energy Group Finance Co., Ltd.7,969,435December 23,2024September 26,2041
Guangdong Energy Group Finance Co., Ltd.100,000,000July 15,2025July 14,2026
Guangdong Energy Group Finance Co., Ltd.100,000,000August 18,2025August 17,2026
Guangdong Energy Group Finance Co., Ltd.100,000,000February 10,2026February 3,2027
Guangdong Energy Group Finance Co., Ltd.150,000,000December 5,2025December 4,2026
Guangdong Energy Group Finance Co., Ltd.90,000,000December 18,2025December 17,2026
Guangdong Energy Group Finance Co., Ltd.10,859,300May 28,2025December 21,2042
Guangdong Energy Group Finance Co., Ltd.60,000,000March 27,2026March 26,2027
Guangdong Energy Group Finance Co., Ltd.50,000,000January 20,2026January 19,2027
Guangdong Energy Group Finance Co., Ltd.1,908,731January 19,2026September 9,2042
Guangdong Energy Group Finance Co., Ltd.12,268,973April 27,2025September 9,2042
Guangdong Energy Group Finance Co., Ltd.149,500,000March 11,2026March 9,2029
Guangdong Energy Group Finance Co., Ltd.91,282,343September 26,2024September 25,2040
Guangdong Energy Group Finance Co., Ltd.44,632,509May 19,2023May 18,2038
Guangdong Energy Group Finance Co., Ltd.4,000,000April 7,2022July 22,2033
Guangdong Energy Group Finance Co., Ltd.3,460,526April 7,2022July 22,2033
Guangdong Energy Group Finance Co., Ltd.4,386,642December 16,2015February 10,2033
Guangdong Energy Group Finance Co., Ltd.3,798,378July 25,2025July 25,2043
Guangdong Energy Group Finance Co., Ltd.21,719,742April 16,2020June 25,2039
Guangdong Energy Group Finance Co., Ltd.54,000,000April 29,2020June 25,2039
Guangdong Energy Group Finance Co., Ltd.8,500,000May 18,2020June 25,2039
Guangdong Energy Group Finance Co., Ltd.6,700,000June 17,2020June 25,2036
Guangdong Energy Group Finance Co., Ltd.11,200,000July 9,2020June 25,2039
Guangdong Energy Group Finance Co., Ltd.19,500,000August 10,2020June 25,2039
Guangdong Energy Group Finance Co., Ltd.7,700,000August 20,2020June 25,2039
Guangdong Energy Group Finance Co., Ltd.36,000,000September 10,2020June 25,2039
Guangdong Energy Group Finance Co., Ltd.5,700,000September 15,2020June 25,2039
Guangdong Energy Group Finance Co., Ltd.11,600,000October 15,2020June 25,2039
Guangdong Energy Group Finance Co., Ltd.7,100,000November 19,2020June 25,2039
Guangdong Energy Group Finance Co., Ltd.5,000,000March 16,2021June 25,2039
Guangdong Energy Group Finance Co., Ltd.10,000,000April 6,2021June 25,2039
Guangdong Energy Group Finance Co., Ltd.8,121,854April 22,2021June 25,2039
Guangdong Energy Group Finance Co., Ltd.5,000,000May 20,2021June 25,2039
Guangdong Energy Group Finance Co., Ltd.20,000,000August 12,2021June 25,2039
Guangdong Energy Group Finance Co., Ltd.16,000,000December 24,2025June 25,2039
Guangdong Energy Group Finance Co., Ltd.81,851,538February 4,2015October 27,2029
Guangdong Energy Group Finance Co., Ltd.13,461,538July 23,2015October 27,2029
Guangdong Energy Group Finance Co., Ltd.27,503,846September 28,2015October 27,2029
Guangdong Energy Group Finance Co., Ltd.36,673,846December 10,2014October 27,2029
Guangdong Energy Group Finance Co., Ltd.16,154November 12,2014October 27,2029
Guangdong Energy Group Finance Co., Ltd.41,871,770June 17,2015October 27,2029
Guangdong Energy Group Finance Co., Ltd.13,769,231September 15,2015October 27,2029
Guangdong Energy Group Finance Co., Ltd.10,230,769October 13,2015October 27,2029
Guangdong Energy Group Finance Co., Ltd.125,082,845December 16,2015October 27,2029
Guangdong Energy Group Finance Co., Ltd.6,484,615June 20,2018October 27,2029
Guangdong Energy Group Finance Co., Ltd.9,153,846September 20,2018October 27,2029
Guangdong Energy Group Finance Co., Ltd.10,720,000November 28,2023May 17,2043
Guangdong Energy Group Finance Co., Ltd.1,787,429May 29,2023May 17,2043
Guangdong Energy Group Finance Co., Ltd.54,000,000December 26,2023May 17,2043
Guangdong Energy Group Finance Co., Ltd.738,286May 18,2023May 17,2043
Guangdong Energy Group Finance Co., Ltd.9,994,286March 28,2025May 17,2043
Guangdong Energy Group Finance Co., Ltd.25,997,143May 28,2025May 17,2043
Guangdong Energy Group Finance Co., Ltd.100,000,000June 26,2026June 25,2029
Guangdong Energy Group Finance Co., Ltd.10,995,714April 11,2025May 17,2043
Guangdong Energy Group Finance Co., Ltd.27,459,773May 16,2025May 17,2043
Guangdong Energy Group Finance Co., Ltd.50,000,000April 27,2026April 26,2027
Guangdong Energy Group Finance Co., Ltd.14,991,429June 18,2025May 17,2043
Guangdong Energy Group Finance Co., Ltd.50,000,000November 26,2025November 25,2026
Guangdong Energy Group Finance Co., Ltd.23,994,286November 13,2024May 17,2043
Guangdong Energy Group Finance Co., Ltd. Loaned18,676,285October 30,2025May 17,2043

(6) Assets transfer and debt restructuring of related party

None

(7) Rewards for the key management personnel

ItemsAmount of current periodAmount of previous period
Annual salary of the operator1,722,5862,101,917

(8)Other related transactions

(a)Interest income

ItemAmount of current periodAmount of previous period
Deposit interest of Energy Group Finance29,472,79044,265,328
Proportion %75.01%92.92%

(b)Interest expense

ItemAmount of current periodAmount of previous period
Interest of borrowing of Guangdong Energy Finance Company111,910,864110,244,259
Discount interest of Guangdong Energy Finance Company1,089,667701,639
Proportion9.59%9.72%

(c)Interest payable

ItemAmount of current periodAmount of previous period
Enerty Finance Lease interest99,694,16795,680,562

(d)Joint Investment

Energy Group
Maoming Thermal power plant45.14%
Bohe Energy33%
Sha C Company49%
Guanghe Electric Power49%
Biomass Power Generation49%
Xinhui Power Generation44.10%
Energy Group Finance Company60%
Industry Fuel50%
Shanxi Energy Company60%
Capital Company51%
Energy Financing Yudean Shipping Leasing75%
Yudean Shipping65%
Yueqian Electric power68.70%
Yangjiang Wind Power10.96%
Zhuhai Wind Power5.72%
Qujie Wind Power1.68%
Shibeishan Wind Power30%
Zhanjiang Wind Power30%
Yuejia Electric Power25%

6. Payables and receivables of the related party

(1)Receivables

In RMB

ProjectRelatedAt end of termAt beginning of term
partiesBook balanceBad debt provisionBook balanceBad debt provision
Monetary funds-Bank depositEnergy Group Finance Company14,144,497,60113,254,660,382
Monetary funds-Other Monetary fundsEnergy Group Finance Company25,602,61321,228,210
Account receivableGuangdong Energy Group06,469,246
Account receivableGuangzhu Power Generation21,518,53715,598,390
Account receivableYudean Zhangshan Thermal power10,606,26522,782,309
Account receivableOther8,750,1813,472,083
Contract assetsYudean Zhangshan Thermal power10,516103,206
Contract assetsOther203,754771,563
Other account receivableYudean Environmental protection29,024,16626,495,186
Other account receivableFuel Company45,721,63654,738,075
Other account receivableEnergy Finance easing Company033,507,710
Other account receivableOther29,282,16934,805,913
Advance paymentFuel Company780,750,000636,106,229
Advance paymentTianxin Insurance14,141,83023,760,250
Advance paymentOther15,860,0987,261,439
Other non-current assetsEnergy Group Energy Conservation and Carbon Reduction Company04,323,000
Other non-current assetsTianxin Insurance023,837,472

(2)Payables

In RMB

NameRelated partyAmount at year endAmount at year beginning
Note payableEnergy Group Finance Company325,000,000150,000,000
Account payableFuel Company4,155,194,3902,255,235,465
Account payableEnergy Natural gas738,673,777656,143,143
Account payableEnergy Group317,678,884314,416,207
Account payableYudean Environmental Protection47,078,60733,840,243
Account payableEnvironmental Protection Material25,356,36121,771,155
Account payableOther11,815,49118,114,415
Other payableYudean Environmental Protection464,083762,414
Other payableMenghua New Energy5,440,5237,640,523
Other payableYudean Property9,686,6577,395,846
Other payableYudean information Technology3,476,6287,152,456
Other payableGuangdong Energy Enterprise Services5,501,1589,505,945
Other payableEnergy Group Scientific Research Institute35,415,34535,827,012
Other payableOther6,460,07725,807,630
Received in advanceEnergy Group Huizhou Natural gas01,425,115
Contractual liabilitiesHuizhou Natural gas34,289,64734,983,686
Lease liabilitiesEnergy Financing leasing9,534,192,8798,120,455,932
Lease liabilitiesOther6,696,78419,646,041
Long-term PayableEnergy Financing leasing404,228,667420,971,128
Short-term loansFinance Company4,695,365,8054,444,498,452
Non-current liability due in 1 yearFinance Company333,751,507286,611,981
Non-current liability due in 1 yearEnergy Financing leasing526,941,841772,997,883
Non-current liability due in 1 yearYudean Investment11,521,41312,612,258
Non-current liability due in 1 yearYunfu B Power Generation plant1,019,7241,002,858
Non-current liability due in 1 yearYuelong Power Generation7,0257,025
Long-term loansFinance Company6,632,735,5196,707,954,288

7. Related party commitment

Not applicable

8.Other

Not applicable

XV. Stock payment

1. The Stock payment overall situation

□ Applicable √ Not applicable

2. The Stock payment settled by equity

□ Applicable √ Not applicable

3. The Stock payment settled by cash

□ Applicable √ Not applicable

4.The current shares will pay the fee

□ Applicable √ Not applicable

5. Revised and termination on share-based payment

None

6.Other

None

XVI. Commitments

1.Importance commitment events

Important commitments of existence of balance sheet date

Note 1: In August 2022, Provincial Wind Power signed the Equity Acquisition Framework Agreement for the Wuxiang Lvheng 100MW Photovoltaic Power Generation Project with Shanxi Hengyang New Energy Co., Ltd. (Hengyang New Energy). According to the agreement, Provincial Wind Power paid a deposit of RMB 52,200,000 for the equity acquisition in 2022.As at 30 June 2026, The wind power company has paid a deposit of 52,200,000 yuan for the acquisition.

2.In May 2024, Guangdong Energy Group Xinjiang Co., Ltd., a subsidiary of the Group, signed a framework agreement with Jiangsu Sailafu Electric Power Development Co., Ltd. ("Sailafu Electric Power") to acquire its 100% equity of Kekedala Zhongfu New Energy Co., Ltd. As of June 30, 2026 Guangdong Wind Power had paid a transaction deposit of RMB 72,000,000 to Sailafu Electric Power, and the consideration for the equity transaction has not been finalized yet.

1.Importance commitment events Important commitments of existence of balance sheet date Note 1: In August 2022, Provincial Wind Power signed the Equity Acquisition Framework Agreement for the Wuxiang Lvheng 100MW Photovoltaic Power Generation Project with Shanxi Hengyang New Energy Co., Ltd. (Hengyang New Energy). According to the agreement, Provincial Wind Power paid a deposit of RMB 52,200,000 for the equity acquisition in 2022.As at 30 June 2026, The wind power company has paid a deposit of 52,200,000 yuan for the acquisition.

2.Contingency

(1)Significant contingency at balance sheet date

None

(2)The Company have no significant contingency to disclose, also should be stated

The Company has no important contingency that need to disclosed

3.Other

None

XVII. Events after balance sheet date

1. Important non-adjustment items

None

2. Profit distribution

3. Sales return

None

4. Other events after balance sheet date

None

XVIII. Other important events

1. Previous accounting errors collection

(1) Retrospective restatement

None

(2) Prospective application

None

2. Debt restructuring

Not applicable

3. Assets replacement

(1) Non-monetary assets change

Not applicable

(2) Other assets replacement

Not applicable

4. Pension plan

Not applicable

5. Discontinued operations

None

6. Segment

(1) Recognition basis and accounting policy for reportable segment

As the Group's revenue and expenses, assets and liabilities are primarily associated with sale of electric power and other related products, the Group's management, taking the sale of electric power as a whole business, periodically obtains accounting information relating to financial status, operating results and cash flow for assessment. Therefore, there is only the electric power segment in the Group. The Group’s revenue from main operations derives from the development and operation of electric plants in China and all assets are within China.

(2) Financial information for reportable segment

In RMB

ItemElectricity and related productsOffset between segmentsTotal
Main business income26,248,017,402026,248,017,402
Main business cost25,300,553,855025,300,553,855
Total assets188,893,075,3820188,893,075,382
Total Liabilities146,440,004,3070146,440,004,307
Net profit-692,601,0370-692,601,037

(3)The Company has no reportable segments, or unable to disclose total assets and total liability for reportable segments, explain reasons

Not applicable

(4) Other note:

Not applicable

7. Major transaction and events makes influence on investor’s decision

8.Other

XIX. Principle notes of financial statements of parent company

1. Account receivable

(1)Disclosure according to the aging

In RMB 元

AgingBalance in year-endBalance Year-beginning
Total00

(2) According to the bad debt provision method classification disclosure

In RMB

CategoryAmount in year-endBalance Year-beginning
Book BalanceBad debt provisionBook valueBook BalanceBad debt provisionBook value
AmountProportion(%)AmountProportion(%)AmountProportion(%)AmountProportion(%)
Including:
Including:
Total0000

If the provision for bad debts of account receivable is made in accordance with the general model of expected credit losses, please refer to the disclosure of other account receivable to disclose related information about bad-debt provisions:

□Applicable<sup></sup>Not applicable

(3) Bad debt provision accrual, collected or reversal in the period

Accrual of bad debt provision in the period:

None

Including important amount of bad debt provision collected or reversal in the period:

None

(4) Account receivables actually write-off during the reporting period

None

Including major account receivables write-off:

None

Explanation on account receivable write-off:

(5) The top five accounts receivable and contract assets at the end of the period aggregated according to debtor

None

2. Other accounts receivable

In RMB

ItemClosing balanceOpening balance
Interest receivable00
Dividend receivable195,124,9640
Other accounts receivable73,745,97870,195,880
Total268,870,94270,195,880

(1) Interest receivable

1) Category

None

2) Important overdue interest

None

3) Accrual of bad debt provision

□Applicable <sup></sup>Not applicable

4) Bad debt provision accrual, collected or reversal in the period

None

5)Interest receivables actually written off in the current period

None

(2)Dividend receivable

1) Category

In RMB

ItemClosing balanceOpening balance
Guangdong Guohua Yudean Taishan Power Generation Co., Ltd.100,480,9290
Shenneng Co., Ltd25,544,8350
Sunshine Insurance Group Co., Ltd66,500,0000
GMG International Tendering Co., Ltd.180,0000
Shenzhen Energy Group Co., Ltd.2,419,2000
Total195,124,9640

In RMB

2) Important dividend receivable with over one year aged

None

3) Accrual of bad debt provision

□Applicable <sup></sup>Not applicable

4) Bad debt provision accrual, collected or reversal in the period None

5) Dividend receivables actually written off in the current period

None

(3)Other account receivable

1) Other accounts receivable classified by the nature of accounts

In RMB

NatureClosing book balanceOpening book balance
Supplementary medical insurance fund receivable38,806,04840,048,672
Receivable payment from related parties30,694,83227,279,842
Other4,389,4812,989,294
Lee: Bad debt reserves-144,383-121,928
Total73,745,97870,195,880

2) Disclosure by aging

AgingEnding book balanceOpening book balance
Within one year(one year included)9,581,4113,842,103
1-2 years9,581,4113,842,103
2-3 years876,01525,210,806
Over 3 years23,733,9546,548,058
3-4 years39,698,98134,716,841
4-5 years4,982,1404,969,053
Over 5 years4,969,05328,671,841
Total29,747,7881,075,947
73,890,36170,317,808

3) According to the bad debt provision method classification disclosure

In RMB

CategoryClosing balanceOpening balance
Book balanceBad debt provisionBook valueBook balanceBad debt provisionBook value
AmountProportion %AmountProportion %AmountProportion %AmountProportion %
Accrual of bad debt provision by single69,500,88094.06%00%69,500,88067,328,51495.75%00%67,328,514
Of which
Accrual single69,500,88094.06%00%69,500,88067,328,51495.75%00%67,328,514
Accrual of bad debt provision by portfolio4,389,4815.94%144,3833.29%4,245,0982,989,2944.25%121,9284.08%2,867,366
Of which
Accrual portfolio4,389,4815.94%144,3833.29%4,245,0982,989,2944.25%121,9284.08%2,867,366
Total73,890,361100%144,3830.20%73,745,97870,317,808100%121,9280.17%70,195,880

Accrual of bad debt provision by single term : Receivables from related parties

In RMB

NameOpening balanceClosing balance
Book balanceBad debt provisionBook balanceBad debt provisionProportion%Reason
Receivables from related parties27,279,842030,694,83200%The counterparty is a government unit, with a historical loss rate of 0; therefore, the risk of ECL is extremely low
Total27,279,842030,694,8320

In RMB

Accrual of bad debt provision by single term : Supplementary medical insurance fund receivable In RMB

NameOpening balanceClosing balance
Book balanceBad debt provisionBook balanceBad debt provisionProportion%Reason
Supplementary medical insurance fund receivable40,048,672038,806,04800%The counterparty is Taikang Pension, which mainly provides custody services for the Group's supplementary medical insurance fund. The historical loss rate is 0, and the risk of ECL is extremely low.
Total40,048,672038,806,0480

Accrual of bad debt provision by single term : Other In RMB

Provision for bad debts is made according to the general model of expected credit losses

NameClosing balance
Book balanceBad debt provisionProportion%
Other4,389,481144,3833.29%
Total4,389,481144,383

In RMB

Bad Debt ReservesStage 1Stage 2Stage 3Total
Expected credit losses over the next 12 monthsExpected credit loss over life (no credit impairment)Expected credit losses for the entire duration (credit impairment occurred)
Balance as at January 1, 2026121,928121,928
Balanc6 in current
Provision in Current Year22,45522,455
Balance as at 30 June. 2026144,383144,383

Basis for division of each stage and accrual ratio for bad-debt provision Loss provision changes in current period, change in book balance with significant amount □ Applicable √Not applicable

4) Accounts receivable withdraw, reversed or collected during the reporting period

The withdrawal amount of the bad debt provision:

CategoryOpening balanceAmount of change in the current periodClosing balance
AccrualReversed or collected amountWrite-offOther
Other receivable121,92822,455000144,383
Total121,92822,455000144,383

Important amount of bad debt provision switch-back or collection in the period:

None

5) Top 5 of the closing balance of the other accounts receivable collected according to the arrears party

In RMB

NameNatureYear-end balanceAgingPortion in total other receivables(%)Bad debt provision of year-end balance
Taikang PensionSupplementary medical insurance fund receivable38,806,048Within 1 year, 1-2 years, 3-4 years, 4-5 YEARS52.52%0
Fuel CompanyReceivable of Unit current22,804,2072-3 years30.86%0
Guandong Yudean Shaoguan Power Generation Co., Ltd.Receivable of Unit current2,822,400Within 1 year3.82%0
Yunhe Power Generation Co., Ltd.Receivable of Unit current1,088,659Within 1 year1.47%0
Guangdong Yudean Real Esttate Investment Co., Ltd.Receivable of Unit current1,045,274Over 5 years1.41%0
Total66,566,58890.08%0

3. Long-term equity investment

In RMB

ItemClosing balanceOpening balance
Book balanceProvision for impairmentBook valueBook balanceProvision for impairmentBook value
Investments in subsidiaries44,687,602,1573,915,727,85240,771,874,30544,332,871,1573,994,357,45340,338,513,704
Investments in associates and joint ventures10,922,390,376122,614,15310,799,776,22310,692,555,799122,614,15310,569,941,646
Total55,609,992,5334,038,342,00551,571,650,52855,025,426,9564,116,971,60650,908,455,350

(1)Investments in subsidiaries

In RMB

The invested entityOpening balance(Book value)Opening balance of the impairment provisionIncrease /decrease in reporting periodClosing balanceClosing balance of impairment provision
Increase in investmentDecrease in investmentProvision for impairmentOther
Huizhou Natural gas1,205,199,4461,205,199,446
Guangqian Electric1,353,153,2231,353,153,223
Red Bay Company2,519,023,386438,665,0002,957,688,386
Lincang Company660,000,000490,989,439660,000,000490,989,439
Zhanjiang Electric Company1,729,334,4001,729,334,400
Yuejia Company455,584,2670455,584,267
Shaoguan Power Generation1,596,000,0001,509,698,6741,596,000,0001,509,698,674
Maoming Company687,458,978687,458,978
Jinghai Company2,976,865,7682,976,865,768
Technology Company200,000,000200,000,000
Humen Company3,192,41686,807,5843,192,41686,807,584
Zhongyue Company1,530,000,000187,248,1151,530,000,000187,248,115
Bohe Company1,731,181,0411,731,181,041
Pinghai Company720,311,347720,311,347
Dapu Company2,367,100,0002,367,100,000
Huadu Company323,050,000323,050,000
Guangdong Wind Power10,519,096,88110,519,096,881
Yudean Electric Sale230,000,000230,000,000
Yongan Company495,000,000495,000,000
Huaguoquan Company0
Qiming Company49,680,90049,680,900
Dayawan Company4,370,39978,629,60183,000,000-78,629,60100
Dananhai Company473,025,001473,025,001
Sha C Company431,000,000431,000,000
Yunhe Company1,169,434,134389,686,6481,169,434,134389,686,648
Yuhua Company1,337,473,9271,337,473,927
Bijie Company699,347,838699,347,838
Tumusuke Company17,500,00017,500,0000
Shanguan New Energy4,286,875795,713,1254,286,875795,713,125
Hanhai New Energy46,473,00046,473,000

Guangdong Electric Power Development Co., Ltd. The Semi-annual Report 2026

Jinxiu Energy644,050,000644,050,000
Huibo New Energy2,621,8002,621,800
Xingyue New Energy0
Maoming Nature gas0
Huixin Company99,923,13499,923,134
Shache Energy9,977,5009,977,500
Xinguangyao New Energy115,345,000115,345,000
Luoding New Energy446,435,300446,435,300
Jiuzhou New Energy0
Changshan Wind Power1,256,610,4701,256,610,470
Zhonggong Energy46,057,60046,057,600
ZhuhaiYudean New Energy1,844,5201,844,520
Zhenneng New Energy39,000,00039,000,000
Xingjiang Company110,740,000110,740,000
GaozhouNew Energy0
Yudean New Energy Development152,969,360152,969,360
Yudean Linghang2,740,0002,740,000
DongguanNingzhou10,000,00010,000,000
Qiyang New Energy1,000,000,0001,000,000,000
Total1,476,8001,476,800
371,054,860371,054,860
300,000300,000
948,808,400948,808,400
016,566,00016,566,000
40,338,513,7043,994,357,453455,231,000100,500,000-78,629,601040,771,874,3053,915,727,852

(2)Investment in joint ventures and associates

In RMB

Funded enterpriseOpening balance(Book value)Opening balance of the impairmentIncrease/decrease in this periodEnd of termBalance of the provision on for impairment
Increase in investmentDecrease in investmentInvestment income under equityOther comprehensive incomeOther changes in equityAnnounced for distributingProvision for impairmentOther

Guangdong Electric Power Development Co., Ltd. The Semi-annual Report 2026

provisionmethodcash dividend or profit
I.Joint venture
Industry Fuel1,549,408,238000115,658,49803,421,68218,821,800001,649,666,6180
Subtotal1,549,408,238000115,658,49803,421,68218,821,800001,649,666,6180
II. Associated
Energy Leasing Company844,967,2780009,793,39900000854,760,6770
Yueqian Electric Power276,842,07800011,309,42002,262,65724,022,38300266,391,7720
Yudean Shipping Company146,631,60700017,800,215-972,047191,343000163,651,1180
Energy Finance Company1,134,349,78800052,465,0760035,552,306001,151,262,5580
Shanxi Yudean Energy4,182,897,544000110,730,9310915,8120004,294,544,2870
Taishan Power Generation2,073,641,46800077,777,54704,141,772100,480,929002,055,079,8580
Weixin Yuntou0122,614,153000000000122,614,153
Guangdong Energy Insurance Captive Company321,210,1850004,582,8370230,3881,729,74000324,293,6700
Enterprise Services27,032,82400027,1310029,5420027,030,4130
Other12,960,636000134,6160000013,095,2520
Subtotal9,020,533,408122,614,15300284,621,172-972,0477,741,972161,814,900009,150,109,605122,614,153
Total10,569,941,646122,614,15300400,279,670-972,04711,163,654180,636,7000010,799,776,223122,614,153

The recoverable amount is determined on the basis of the net amount of fair value less disposal costs

□Applicable <sup></sup>Not applicable

The recoverable amount is determined by the present value of the projected future cash flows

□Applicable <sup></sup>Not applicable

The reason for the obvious discrepancy between the foregoing information and the information used in the impairment test of previous years or the external information

The reason for the obvious discrepancy between the information used in the Company's impairment test in previous years and the actual situation in the current year.

(3)Other note

4. Business income, Business cost

In RMB

ItemAmount of current periodAmount of previous period
IncomeCostIncomeCost
Main business0000
Other business30,371,55113,858,25224,361,40416,728,421
Total30,371,55113,858,25224,361,40416,728,421

Income related information: In RMB

Contract classificationDivision 1Division 2Total
IncomeCostIncomeCostIncomeCostIncomeCost
Business type30,371,55113,858,25230,371,55113,858,252
Including
Other30,371,55113,858,25230,371,55113,858,252
Area30,371,55113,858,25230,371,55113,858,252
Including:
Guangdong30,371,55113,858,25230,371,55113,858,252
Other market30,371,55113,858,25230,371,55113,858,252
Other
JOther market30,371,55113,858,25230,371,55113,858,252
Contract type30,371,55113,858,25230,371,55113,858,252
Including:
Provided Labour25,388,55013,858,25225,388,55013,858,252
Provided Asset use right4,983,0014,983,0010
Classification by the time of commodity transfer30,371,55113,858,25230,371,55113,858,252
Including:
Classification by time of goods transferContract type30,371,55113,858,25230,371,55113,858,252
Including
Classification by sales channel
Including:
Total30,371,55113,858,25230,371,55113,858,252

Information related to performance obligations:

None

Other note

Information relating to the transaction price assigned to the remaining performance obligation:

The amount of income corresponding to the performance obligations that have been signed at the end of this reporting period but have not yet been fulfilled or have not done with fulfillment is 0 yuan, among them, yuan of revenue is expected to be recognized in year, yuan of revenue is expected to be recognized in year, and yuan of revenue is expected to be recognized in year.

Significant contract changes or significant transaction price adjustments

None

5. Investment income

In RMB

ItemAmount of current periodAmount of previous period
Long-term equity investment income accounted by cost method512,328,173970,603,087
Long-term equity investment income accounted by equity method400,279,670260,834,563
Dividend income from investments in other equity instruments during the holding period122,852,781116,155,595
Creditor's right from investments in other equity instruments during the holding period2,007,12522,138,855
Total1,037,467,7491,369,732,100

6.Other

Not applicable

XX. Supplement information

1. Particulars about current non-recurring gains and loss

√ Applicable □ Not applicable

In RMB

ItemAmountNotes
Non-current asset disposal gain/loss13,269,231Mainly arethe gains from the landdisposal of the Red Bay power plant and the disposal profits and losses of power-related equipment such as those at the Jinghai power plant.
Government subsidies recognized in current gain and loss(excluding those closely related to the Company's business and granted under the state's policies)6,854,598Mainly due to various government subsidies for energy saving and carbon reduction, technological transformation, etc., cumulatively received by the main subsidiaries.
Capital occupation charges on non-financial enterprises that are recorded into current gains and losses4,789,368Mainly is the interest income from Guangdong Wind Power Company reclaiming the equity acquisition deposit.
Other non-business income and expenditures other than the above169,856,604Mainly includes the typhoon insurance compensation collected by Yangjiang Wind Power and the project assessment compensation collected by Zhuhai Wind Power from the EPC party.
Less: Amount of influence of income tax48,692,450
Influenced amount of minor shareholders' equity (after tax)50,626,243
Total95,451,108--

Details of other profit and loss items that meet the non-recurring profit and loss definition

□ Applicable√ Not applicable

None

For the Company’s non-recurring gain/loss items as defined in the Explanatory Announcement No.1 on information disclosure for Companies Offering their Securities to the Public-Non-recurring Gains and Losses and its non-recurring gain/loss items as illustrated in the Explanatory Announcement No.1 on information Disclosure for Companies offering their securities to the public-non-recurring Gains and losses which have been defined as recurring gains and losses, it is necessary to explain the reason.

√ Applicable □ Not applicable

ItemAmount involved(RMB)Reason
Value-added tax will be refunded immediately3,415,193Comply with national policies and regulations, and continue to occur.
Carbon emission quota used to fulfill the emission reduction obligation-72,586,715Comply with national policies and regulations, and continue to occur.

2. Return on net asset and earnings per share

Profit of report periodWeighted average return on equity(%)Earnings per share
Basic earnings per share(yuan/share)Diluted earnings per share(yuan/share)
Net profit attributable to the Common stock shareholders of Company.-2.36%-0.104-0.104
Net profit attributable to the Common stock shareholders of Company after deducting of non-recurring gain/loss.-2.77%-0.1221-0.1221

3. Differences between accounting data under domestic and overseas accounting standards

(1) Simultaneously pursuant to both Chinese accounting standards and international accounting standards disclosed in the financial reports of differences in net income and net assets.

□ Applicable□√ Not applicable

(2) Differences of net profit and net assets disclosed in financial reports prepared under overseas and Chinese accounting standards.

□ Applicable□√ Not applicable

(3) Explanation of the reasons for the differences in accounting data under domestic and foreign accounti ng standards. If the data that has been audited by an overseas audit institution is adjusted for differences, the name of the overseas institution should be indicated

4.Other

原文链接